Your SlideShare is downloading. ×

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Template - product backlog

891
views

Published on

2010-11-13, Agile Saturday, Estonia

2010-11-13, Agile Saturday, Estonia


0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
891
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
11
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Priorit Esti ID y Soovilugu Notes How to demo mate 1 10 user story 1 2 20 user story 2 3 30 user story 3 4 40 user story 4 5 200 user story 5 6 200 user story 6 7 300 user story 7 8 300 user story 8
  • 2. Backlog Item #7 Prioriteet user story 7 300 Märkmed Mahuhinnang Vastuvõtmise tingimused. Backlog Item #8 Prioriteet user story 8 300 Märkmed Mahuhinnang Vastuvõtmise tingimused.
  • 3. Backlog Item #5 Prioriteet user story 5 200 Märkmed Mahuhinnang Vastuvõtmise tingimused. Backlog Item #6 Prioriteet user story 6 200 Märkmed Mahuhinnang Vastuvõtmise tingimused.
  • 4. Backlog Item #4 Prioriteet user story 4 40 Märkmed Mahuhinnang Vastuvõtmise tingimused. Backlog Item #3 Prioriteet user story 3 30 Märkmed Mahuhinnang Vastuvõtmise tingimused.
  • 5. Backlog Item #2 Prioriteet user story 2 20 Märkmed Mahuhinnang Vastuvõtmise tingimused. Backlog Item #1 Prioriteet user story 1 10 Märkmed Mahuhinnang Vastuvõtmise tingimused.
  • 6. Backlog item # Prioriteet Story name description 0 Märkmed Mahuhinnang 0 Notes for this story Vastuvõtmise tingimused. This explains how to demo
  • 7. Sprindi SP Kumula ( skaala tiivne paremal tehtud Projekti Sprint Algus Lõpp ) SP maht Sum of Estimate 1 8/18/2010 8/25/2010 5.5 5.5 70 Done Total 2 8/25/2010 9/1/2010 4.5 10.0 80 1 3 9/1/2010 9/8/2010 3.0 13.0 80 4 9/8/2010 9/15/2010 8.0 21.0 80 (blank) 5 9/15/2010 9/22/2010 8.0 29.0 80 Grand Total 6 (Release 1) 9/22/2010 9/29/2010 8.0 37.0 80 7 8 Product release burnup chart 90.0 80.0 70.0 60.0 50.0 40.0 30.0 20.0 10.0 0.0 1 2 3 4 5 6 (Release 1) 7 8 Sprindi SP ( skaala paremal) Kumulatiivne tehtud SP Linear regression for Ku ivne tehtud SP Projekti maht Linear regression for Projekti maht
  • 8. ← Use "Refresh Data" command art Linear regression for Kumulati- ivne tehtud SP
  • 9. About this tool This is a simple & flexible tool for housing a Scrum product backlog. The main feature is that includes a "generate index cards" button. This tool was created by Stefan Nijenhuis, with minor tweaks by me. The design of this tool and the index cards is based on my book "Scrum and XP from the Trenches", and the first version of the index card generator on my blog (http://blog.crisp.se/henrikkniberg) To learn more about the intended usage of this tool, see the chapter on product backlogs. http://www.crisp.se/henrik.kniberg/ScrumAndXpFromTheTrenches.html Feel free to use and modify this tool as you wish. Worksheets BACKLOG = the actual product backlog. Add columns as you like. CARDS = index cards appear here when you press "generate index cards" on the BACKLOG worksheet. TEMPLATE = play with this to change the appearance of the generated index cards. If you make any significant improvements or bugfixes (while still keeping it simple) I'd appreciate if you email me at henrik.kniberg @crisp.se so that I can spread it to the community. Thanks Stefan for implementing this! /Henrik Kniberg 2007-12-13 Max. Backlog ID = 8