M.V.KANNAN  T.No 22010 AERO<br />My JOURNEY THROUGH SPACE…<br />CHANDRAYAAN-1<br />Over  50 satellites<br />1970-73<br />N...
Management<br />PROFILE (POSITIONS)<br />MAR<br />2010<br />Mechanical Systems Area (MSA) -STRUCTURES<br />1973 - 1981:   ...
CORE COMPETENCE<br /><ul><li>Structural Analysis
Experimental Stress Analysis
 Structural Testing - S/C
 Static Load Tests
 Dynamic Tests
 Project Management  (As DPD)
 Inter - project  coordination
Integrated project planning , scheduling ,Monitoring &   control – Multi-Project Environment
Project prioritization
Upcoming SlideShare
Loading in...5
×

Gtg final

262

Published on

My Career in ISRO,Bangalore over 36 years 4 months 29 days

Published in: Career
1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total Views
262
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide
  • Chunk related material together. If you get sidetracked you may lose your bearings and get lost within your presentation. If you get sidetracked within a chunk the sea becomes a lake…you can find your way back to shore more easily.
  • Gtg final

    1. 1. M.V.KANNAN T.No 22010 AERO<br />My JOURNEY THROUGH SPACE…<br />CHANDRAYAAN-1<br />Over 50 satellites<br />1970-73<br />Nov 1973-31 March 2010 ISRO<br />ARYABHATTA<br />ISSP-Peenya, Bangalore<br />ISAC- Airport Road,Bangalore<br />Chrompet, Chennai<br />
    2. 2. Management<br />PROFILE (POSITIONS)<br />MAR<br />2010<br />Mechanical Systems Area (MSA) -STRUCTURES<br />1973 - 1981: Engineer, Structural Analysis<br />1981 - 2003: Head, Experimental Stress Analysis & Structural Testing<br />1981 – 2003: STRUCTURAL ANALYST - ANURADHA 3SAN21<br />Project Engineer - SROSS-1<br /> Programme Manager - SROSS-2<br /> Deputy Project Director - SROSS- C & SROSS-C2<br /> Deputy Project Director - INSAT-3B<br /> Deputy Project Director - GSAT-1 <br />From 2003 : Head ,Projects Division, Programme Planning & Evaluation Group (PPEG)<br /> Deputy Project Director (Astronaut Training Centre) - HSP<br /> Member Secretary - Programme Management Board (Communication Satellites) <br /> Deputy Project Director (PPEG) - Chandrayaan-1 (PEB)<br />Special Roles: Technical Reviews / Advisory / Management Committees / Contracts / Event Managements (Seminars, Conference & cultural etc)<br />36<br />Y<br />E<br />A<br />R<br />S<br />F<br />O<br />U<br />R<br />M<br />O<br />N<br />T<br />H<br />S<br />Spacecraft Projects<br />Programme Planning & Evaluation Group<br />NOV<br />1973<br />Engineering<br />Job Role<br />
    3. 3. CORE COMPETENCE<br /><ul><li>Structural Analysis
    4. 4. Experimental Stress Analysis
    5. 5. Structural Testing - S/C
    6. 6. Static Load Tests
    7. 7. Dynamic Tests
    8. 8. Project Management (As DPD)
    9. 9. Inter - project coordination
    10. 10. Integrated project planning , scheduling ,Monitoring & control – Multi-Project Environment
    11. 11. Project prioritization
    12. 12. Resource allocation – Planning infrastructure & duty cycle</li></ul> (need aspect, installation & commissioning, operations planning for project needs)<br />
    13. 13. CHALLENGES -TECHNICAL<br />Structural analysis (FEM) software tools (Tailored to requirements)<br /><ul><li>No readymade tools for structural analysis
    14. 14. Memory & CPU Constraints</li></ul>Achieved through<br /><ul><li>Continuous learning
    15. 15. knowledge management
    16. 16. Formulation of analytical tools</li></li></ul><li>CHALLENGES -TECHNICAL<br />Structural Testing-S/C & Structural Elements<br /><ul><li>Establishment of test methodology and loading system
    17. 17. Setting up of experimental stress analysis lab and supporting analytical tools
    18. 18. Optimal reuse of test processes</li></ul>Achieved Through:<br /><ul><li>Continuous learning
    19. 19. up gradation of infrastructure
    20. 20. innovation</li></li></ul><li>CHALLENGES –PROJECT MANAGEMENT<br />Development Related<br />Paradigm shift in job description<br /><ul><li>People management skills
    21. 21. Emotional Quotient
    22. 22. Breadth of understanding</li></li></ul><li>ENVIRONMENT<br />LABORATORY<br />DESK<br />TESTING<br />HARDWARE <br />DESIGN<br />DECISION MAKING<br />MIS<br />MONITORING<br />ACTIVITIES<br />FOCUSSED<br />IN DEPTH<br />WIDER<br />BIRD’S EYE VIEW<br />PERSPECTIVE<br />TEAM SIZE<br />SMALL<br />MID SIZE<br />CHALLENGES –PROJECT MANAGEMENT<br />Cultural Environment Related<br />
    23. 23. CAREER FRONT<br />!!Happy Occasions!!<br />
    24. 24. FAMILY FRONT<br />!!Happy Moments!!<br />
    25. 25. FINE ARTS<br />
    26. 26. Thank you for your kind attention<br />Website - http://mvkannan.tripod.com<br />E-mail:indukan@yahoo.com,mvkannan60@yahoo.in<br />Contact: +91-80 - 28439034 ,+919886029133<br />

    ×