Status of Solar Home System in Bangladesh

Status of Solar Home System in Bangladesh
www.devi-renewable.com

Statistics

Views

Total Views
1,793
Views on SlideShare
1,793
Embed Views
0

Actions

Likes
0
Downloads
34
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Status of shs in bangladesh   spva presentation Status of shs in bangladesh spva presentation Presentation Transcript

  • Symposium on Small PV ApplicationsStatus of SHS Dissemination in BangladeshExperience with Physical, Financing and Technology Shahriar Ahmed Chowdhury Director, Centre for Energy Research Assistant Professor, Department of EEE United International University E-mail: shahriar@eee.uiu.ac.bd Monday; 6th of June, 2011
  • Highlights Energy Scenario of Bangladesh Progress of SHS project Functional structure of SHS Project Financial system of the program Technical status and maintenance requirements of the SHS
  • BangladeshArea: 144,000 km2Population: 158 MPopulation density: 1097/km2Location: 20o33’ – 26o38’ (N) 88o02’ – 92o41’Neighbors: India, Myanmar and Bay of BengalPer Capita Income: 450 US$Per capita electricity consumption: 236 kWh(6th in South Asia, above Nepal )Electricity access: 49%Average GH Irradiation: 4.7 kWh/M2 Source: BPDB Annual Report 2009- 2010
  • Bangladesh : Primary Energy Mix (in %) Hydro, 0.34 Coal, 0.75 Gas, 45.97 Petroleum 18.33 Biomass 34.58 Source: Statistical Year book of Bangladesh 2009
  • Power (Installed capacity 5823 MW ) 226 (4%) 230 (4%) 230 (4%) 250 (4%) 186 (3%)1263 (22%) 335 (6%) Gas Hydro Furnace oil Steam Turbine Diesel 2638 (45%) Gas Turbine Hydro 1466 (25%) Combined Cycle 4822 (83%) Coal Diesel Plant Type Fuel Type Source: Annual Report of BPDB 2009-2010
  • Generation (Total 27,470 GWh) Hydro 24316 (89%) Gas Furnace oil728.56 (3%) Diesel 728.56 (3%) Coal 517.36 (2%) 876.51 (3%)Public sector generation: 58%, Private (IPP) generation: 42%Cost of bulk Supply (BDT): 2.68 Average bulk tariff (BDT): 2.37 Source: Annual Report of BPDB 2009-2010
  • PV Electrification Program of Bangladesh  SHS Rural Electrification starts in organized way (RERED Project) in the year 2003 with the support from IDA and GEF  Initial Installation of the project target was 50,000 within 5 and half year in off grid areas of Bangladesh  Initial target achieved 3 years ahead of completion date and US$ 2M below the estimated cost  Following the success IDA, GTZ, KfW, ADB and IDB have extended support  A revised target is set to 1 M SHS by 2012  Starting with 5 POs, IDCOL now have 30 POs
  • Cumulative installed SHS 800 700 600 SHS (000s) 500 400 Start of 300 RERED Project 200 100 0 2004 2009 1997 1998 1999 2000 2001 2002 2003 2005 2006 2007 2008 2010 Year (-)Monthly average, 2009: 14,000 Jan, 2011 : 36,443Monthly Average, 2010: 27,000 Feb, 2011 : 32,312Monthly Average, 2011 (Till May): 42,517 Mar, 2011 : 38,507 April, 2011 : 42,559Total Installation (Till May, 2011): 977,109 [51.8 MWP] May, 2011 : 62,763
  • Installed SHS by Panel size 300 250Installed SHS (000s) 200 150 100 50 0 10 20 21 30 40 45 50 55 60 65 75 80 85 120 130 Panel Size (Wp)
  • Market trends (SHS by Wp) 300 250Installed SHS (000s) 200 20 Wp 150 40 Wp 50 Wp 65 Wp 100 75 Wp 85 Wp 50 0 2003 2004 2005 2006 2007 2008 2009 2010 Year (-)
  • Functional Structure of the Project APPLIES for compliance SEEK APPROVAL Testing SUPPLIERS TSC Authority Provides PROVIDES certificates APPROVAL PAY FOR SUPPLY EQUIPMENT EQUIPMENT SEEK GRANT ANDPO SELECTION APPLIES LOAN COMMITTEE SELECT PO/NGO IDCOL PROVIDE GRANT AND LOAD GRANT AND REIMBURSE SOFT TERM CREDIT CREDIT SELLS SHS AND SUPPLY PROVIDE SERVICE EQUIPMENTOPERATIONSCOMMITTEE CONSUMERS DONORS
  • PO wise installation (%) Others 13.45%SRIZONY 3.82%BRAC7.50% RSF13.91% GS 61.32%
  • Partners of the Project Government  Sources necessary fund for the program  Creates incentives (waiver of duties, tax benefits etc.) IDCOL  Provides grants to POs to reduce SHS cost and capacity building  Soft loan to PO  Technical assistance (training, logistics and promotional supports) Donor Agencies [WB(IDA), GEF, KfW, GIZ, ADB, IDB]  Provides grants and soft loans through IDCOL  Technical assistance to the program Partner Organization (PO)  Select Areas and customers and install SHS  Extend micro credit to customers  provide after sales services Manufacturer / Suppliers  Sell SHS or its components to POs Professionals  Technical specification and impact assessment
  • Committees PO Selection Committee  Consists of representatives from IDCOL and relevant government ministry and organization  Select POs to implement the program on the basis of micro finance experience, financial and technical strength Technical Standard Committee (TSC)  Consists of experts from University, Engineering department of government and IDCOL  Determines technical standards, reviews product  Credentials of dealers and approves the eligible equipment Operations committee  Consists of program in charge from all POs and representatives from IDCOL  Looks after the operational aspects of the program
  • AuditsIDCOL appoints independent organizations to conduct twotypes of audit:(i) Financial audit The objective of the financial audit is to ensure that the households’ down payments are accounted for properly and POs are utilizing the grants and refinancing for their intended purposes only.(ii) Technical audit The technical audit is conducted to ensure that only TSC approved equipment with their committed quality are used under the program. Representatives of the PO and suppliers accompany the technical audit team.
  • TrainingsPO personnelTo build awareness and capacity building among the staff ofthe POs’ and the consumers.Topics: SHS configuration, positioning of SHS, installationprocedure and guidelines with measurements, maintenanceand troubleshooting of SHS and batteries, guidelines formonitoring and inspection of SHS, marketdevelopment, micro-credit methods for marketing.Cost: 80% of the total expense is sponsored by IDCOL andthe rest is shared by the POs.For ConsumerSince SHS is entirely new to the households, consumertrainings are conducted regularly to educate them. They aretrained on how to use the SHS and fix petty problems withoutwaiting for the technician.
  • Other supportsFollowing supports are extended to POs by IDCOL:i) Logistic support: Each PO is given a computer for efficientdocumentation related to SHS installation. They are provided withtool boxes, motorcycle, demonstration kit, hydrometers and batterychargers for rendering better service to customers. Major share of thecosts is sponsored by IDCOL.ii) Promotional support: distribute publicity materials to raiseawareness and popularize the use of SHS in different parts of thecountry. Posters, leaflets, T-shirts, and billboards are distributed tothe POs for wider publicity of solar energy. TV and radioadvertisement are also developed and aired.iii) Exposure visit: To experience with the diversified uses of the PVsystems and other RETs, visits to other countries are also organizedboth for PO representatives and IDCOL staffs.
  • Development Impacts Provides illumination to rural areas. Increases income generating activities e.g. working hours have been increased for small businessmen, weavers, tailors, hair dressers, and handicraft makers. Students are getting benefits through extended hour of studies at night. The use of TV and radio has enhanced rural people’s access to the outer world. Study found that many women are feeling more secured at night after installation of SHS.
  • Job creationPartner Organizations POs : 30 Offices : 2426 Technical staffs : 5700 Non Technical staffs : 6000Manufacturers & Suppliers Battery : 13 Charge Controller /Lamp : 22 PV Panels : > 100
  • Fund flow Grant and Loan Grant and Loan IDCOL Debt service of Government Donor Debt service of loan loanGrant and Debt service Loan of Loan Grant and Loan PO Customer Debt service of loan As of November, 2010 the POs are enjoying an average collection efficiency (Loan repayment rate) of 97%
  • RefinancingDonor agencies to IDCOL IDA ADB IDB Tenure 20 20 20 Grace Period 5 8 7 Interest rate 3% per annum 3-5% 3% per annum Repayment frequency Semi-annual Semi-annual Semi-annualIDCOL to PO Tenure 6-8 years Grace period 1-2 years Interest rate (declining balance) 6%-8% per annum Repayment frequency Semi-annualPO to Customer Tenure 1-5 years Interest rate (declining balance) 12%-15% per annum Repayment frequency Monthly
  • Financial status Till June, 2010 Source Credit (Millions) Grant (Millions) SHS Amount SHS AmountIDA & GEF 491,000 US$ 124 75,000 US$ 7 KfW - 371,000 € 15 GTZ - 189,000 €8 ADB 128,000 US$ 33 IDB 60,000 US$ 16 GPOBA 232,600 US$ 7 Total 679,000 US$ 173 867,600 US$ 14 & € 23
  • Financial support reduction scheme Amount of grant available per SHS Item Total Buy-down grant Institutional development grantFirst 20,000 $ 90 $ 70 $ 20Next 20,000 $ 70 $ 55 $ 15Next 35,000 $ 50 $ 40 $ 10Next 88,160 € 38 € 30 €8Next 35,000 € 36 € 30 €6Next 235,000 € 34 € 30 €4Next 100,000 € 28 € 25 €3Next 72,000 € 22 € 20 €2
  • Price breakdown for typical SHS system Figures is in BDT % of Component 20 Wp 40 Wp 50 Wp 65 Wp TotalSolar Panel 3330 6660 8325 10820 25  31Battery 3850 6460 8800 10780 29  31Charge Controller 850 850 850 850 36Lamp Sets 1000 1700 2000 2500 7Other Accessories 2000 3800 4800 5500 15  17Transportation 400 500 500 700 23Installation Cost 400 500 500 700 23Operational Cost 1500 2000 2500 3000 9  11Total Cost 13,330 22,470 28,275 34,850Panel 2.38 $/Wp 1 Euro= 105 BDT
  • Findings from the last Technical AuditApproach of the auditI. Field observation and testing  60 SHS visited out of 300,000  6 out of 15 Partner Organisations visitedII. Manufacturer’s factory visit  4 Battery Manufactures  6 Charge Controller Manufacturers  5 Lamp ManufacturersIII. Laboratory Testing  SHS components (Batteries, Charge Controllers, Lamp Circuits)
  • Azimuth, Tilt and shading of the installed panels) Figures is in BDT
  • LVD and HVD of the installed charge controllers
  • Self consumption of the charge controllers 50 40Self consumption (mA) 30 20 10 0 G1 . H1 . I1 . J1 . K1 . L1 . Manufacturer
  • Deviation of the rated capacity (batteries) 140Normalized rated Capacity (%) 120 100 80 60 40 20 0 A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3 Battery Manufacturer
  • Specific gravity of the charged and discharged batteries Charged Discharged 1300 1250 1200Sp. Gravity (-) 1150 1100 1050 1000 A1 A2 A3 B1 B2 B3 B4 B5 C1 C2 D1 D2 D3 Manufacturer
  • Efficiency of the lamp circuit (Inverter) at LVD at HVD 100Inverter efficiency (%) 80 60 40 20 0 P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2 Manufacturer
  • Crest factor of the lamp circuit (Inverter) at LVD at HVD 2.2 2.1Crest factor (-) 2 1.9 1.8 1.7 P1 P2 Q1 Q2 R1 R2 S1 S2 T1 T2 Manufacturer
  • Voltage and current waveform of the inverter Voltage waveform Current waveform
  • Quality of switch of the installed systems (contact resistance) acceptable [%] unacceptable [%] 100 80 60 40 20 0 <1 1-2 2-3 3-4 4-5 >5 Age of system Sample size: 180
  • Voltage drop in the connected wire acceptable unacceptable100%80%60%40%20% 0% P Q R S T U V W POs
  • Recommendations after Technical Audit Well equipped national testing facility Mobile equipment testers for field testing A strong independent quality control mechanism Upgrading the technical standards Standard packages for SHS Educating consumers in operation and maintenance Proper training facilities for the field technicians Emphasis on Loss Reduction by use of appropriate components