Presentation Novipro

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Presentation Novipro - Presentation Transcript

    1. Corporate Overview Alexandre Leclerc Sales Representative Servers & Storage
    2. NOVIPRO - MISSION
      • Expertise and solutions in IT infrastructure management
      • A Partner: support our clients in their IT projects
      • NOVIPRO, your IT project architect.
      • Your technological challenges are our inspiration.
      Oct 30, 2009 confidential
    3. NOVIPRO - PROFILE
      • In business since 1993
      • A team of more than 70 extremely competent high-level technical experts
      • Regional finalist in competition to identify Canada’s top 50 best-managed companies (Deloitte)
      • Fourth in Quebec in 2006 with respect to growth over previous five years ( L’Actualité magazine)
      Oct 30, 2009 confidential
    4. SOLUTIONS
      • Leading-edge infrastructure expertise:
        • IT management and architecture
        • Consolidation & Virtualization
        • Storage and archiving
        • IT recovery and High Availability
        • Network optimization solutions
        • Security
        • ERP and Asset Management
      Oct 30, 2009 confidential
    5. INFRASTRUCTURE PRODUCTS
      • Enterprise servers
        • System z
        • System x
        • System p
        • Storage Infrastructure (SAN/NAS)
      • Operating Systems
        • zOS
        • Linux
        • AIX
        • Microsoft
      Oct 30, 2009 confidential
    6. INFRASTRUCTURE PRODUCTS (…)
      • Software
        • IBM Tivoli
        • Oracle
        • VMWare
        • Websphere
        • Optim
        • Rational
        • Lotus
        • Information Management
        • Double-Take
        • Datadomain
        • ERP
        • Asset Management
      • Network
        • Riverbed
        • Elfiq
      Oct 30, 2009 confidential
    7. OUR PARTNERS… Oct 30, 2009 confidential
    8. SOME OF OUR CUSTOMERS.... Oct 30, 2009 confidential Aerospace/Engineering Retail/Manufacturing Services
    9. SOME OF OUR CUSTOMERS.... Oct 30, 2009 confidential Government Pharmaceutical Finances/Insurance
    10. IT MANAGEMENT AND ARCHITECTURE
      • Analysis of the performance of your IT environment
      • IT architecture services
      • Storage and data archiving strategies
      • IT recovery plan services
      • Telecommunications solutions
      • Server consolidation
      • Green IT – reduction in energy consumption
      Oct 30, 2009 confidential
    11. BENEFITS – IT MANAGEMENT AND ARCHITECTURE
      • Assure the security, reliability, availability and traceability of your data
      • Simplify the management of your infrastructures
      • Optimize your IT environment to turn it into a competitive edge
      • Guarantee recovery of your infrastructures
      • Minimize the costs associated with the maintenance and growth of your desktop environment
      • Reduce telecommunications costs
      Oct 30, 2009 confidential
    12. CONSOLIDATION & VIRTUALIZATION
      • Migration of environments
      • Management applications that allow you to control, manage and monitor your entire desktop environment
      • Optimization of infrastructures with respect to:
        • performance
        • security
        • robustness
        • availability and user access
        • reliability of data and desktop environment
        • maintenance
        • upgrade and growth potential
        • energy savings
      Oct 30, 2009 confidential
    13. BENEFITS – CONSOLIDATION & VIRTUALIZATION
      • Simplify infrastructures
        • Facilitate management & monitoring
        • Reduce maintenance costs (servers and labour)
        • Minimize duplication & errors
      • Increase the performance, reliability and robustness of your desktop environment
      • Plan for growth
      • Guarantee data and access security
      • Reduce overall cost of use
      Oct 30, 2009 confidential
    14. STORAGE & ARCHIVING
      • Analysis of storage infrastructure
      • Consolidation through data centre or warehouse
      • Implementation of SAN (Storage Area Network)
      • Increase in performance and capacity
      • Archiving applications and tools
      Oct 30, 2009 confidential
    15. BENEFITS – STORAGE & ARCHIVING
      • Eliminate wasted disk space
      • Simplify the maintenance and monitoring of your storage environment
      • Draw full value from data
      • Improve accessibility and data availability
      • Minimize the costs associated with growth
      • Guarantee data security
      • Reduce overall cost of use
      • Increase performance, reliability and robustness
      Oct 30, 2009 confidential
    16. IT RECOVERY AND HIGH AVAILABILITY
      • Identification of needs and alignment of recovery and business objectives
      • Proofs of concept
      • Audit of environment and implementation of missing elements
      • Real-time recovery
      • Combined archiving and monitoring solutions
      • Change management and maintenance of plan deployment
      Oct 30, 2009 confidential
    17. BENEFITS – IT RECOVERY AND HIGH AVAILABILITY
      • Protect the company from financial losses incurred through a loss of data or information
      • Secure access to data
      • Simplify technological recovery processes
      • Maximize investment and infrastructure reliability
      • Minimize the effort that goes into recovery activities; reduce recovery time
      Oct 30, 2009 confidential
    18. NETWORK OPTIMIZATION
      • Riverbed
        • Optimization of WAN (Wide Area Network) through achievement of LAN-like (Local Area Network) performance
      • Link Load Balancer (Elfiq)
        • Load balancer that allows for redundant connectivity by balancing multiple Internet and private links from various providers
      Oct 30, 2009 confidential
    19. BENEFITS - NETWORK OPTIMIZATION
      • Improve application performance
      • Consolidate your infrastructure
      • Reduce bandwidth use and backup time
      • Minimize costs
      • Assure redundant connectivity: high availability of data and Web site
      Oct 30, 2009 confidential
    20. 1. ACHIEVEMENTS – Large company (financial)
      • Storage consolidation and expansion of SAN networks
        • Centralization of copy procedure into single overnight process
        • Implementation of standalone library (maximization of floor space)
        • Knowledge transfer to assure client autonomy
        • Implementation of Web services architecture
      • Benefits
        • Migration of environments facilitated
        • Reduction in total cost of ownership 
        • Simplified management and monitoring
        • Elimination of wasted disk space
        • Minimal impact on users
      Oct 30, 2009 confidential
    21. 2. ACHIEVEMENTS – Large company (retail)
      • Synchronous mirroring recovery project (2 sites)
        • Architectural projection
        • Storage consolidation and expansion of SAN networks
        • Migration of environments
        • Extensive documentation and knowledge transfer
      • Benefits
        • Elimination of the risk of losing data in case of system failure
        • Notable improvement in performance
        • Simplified management of desktop environment
      Oct 30, 2009 confidential
    22. 3. ACHIEVEMENTS – Large company (actuarial)
      • Project to recover all communications between our client and one of its customers in response to an audit by the U.S. Department of Justice
        • Customized program developed to conduct key word search in all databases, files and e-mails
      • Benefits
        • Rapid response to U.S. legal requirements
        • Elimination of potential impact on the client’s day-to-day operations
      Oct 30, 2009 confidential
    23. 4. ACHIEVEMENTS – Medium-sized company (insurance)
      • Mandate to implement customized internal application
        • Creation of a parameterable IT procedure to automate the various installation steps
        • Installation in approximately 100 offices
      • Benefits
        • Optimization of distribution and installation time
        • Minimization of errors
        • Reduction in the resources required for installation and distribution
      Oct 30, 2009 confidential
    24. 5. ACHIEVEMENTS – Large company (financial)
      • Project to standardize 6,500 passwords during implementation of security processes (Identity Manager and Access Manager)
        • Individual processing time of 5 minutes per password
        • Implemented in less than 10 working days
        • Introduction of a script to allow for automated ID processing
      • Benefits
        • 6,000% optimization of processing time (dropped from 13.5 weeks to 9 hours)
        • Achievement of time targets
        • Minimization of errors
        • Reduction in resource requirements
      Oct 30, 2009 confidential
    25. 6. ACHIEVEMENTS – Medium-sized company (manufacturing)
      • Migration to Microsoft Active Directory
        • Obsolete domain, which resulted in major security breaches
        • Transparent migration for users
        • Narrow timeframe for migration
        • Flawless operation, completed in less than 5 hours
      • Benefits
        • System secured
        • Reinforcement of access procedures
        • Optimization of available time
      Oct 30, 2009 confidential
    26. 7. ACHIEVEMENTS – Large company (telecommunications)
      • Updating of desktop environment
        • Desktop environment spread among more than 50 outmoded servers
        • E-mail application constantly down
        • Consolidation of desktop environment on SAN
        • Virtualization of environments
        • Installation of a redundancy system to assure 24/7 accessibility
        • On-site training and documentation
      • Benefits
        • Simplification of infrastructure
        • 24/7 accessibility
        • Notable improvement in performance
        • Autonomy of IT personnel
        • Maintenance facilitated
      Oct 30, 2009 confidential

    + Alexandre LeclercAlexandre Leclerc, 1 month ago

    custom

    74 views, 0 favs, 0 embeds more stats

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 74
      • 74 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 1
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories