SlideShare a Scribd company logo
1 of 18
OVERVIEW
LASER SCANNING
Gathering data before laser scanning
Equipment
Benefits of Laser Scanning
COACH DELIVERY BUILDING SCAN
Cost – Laser Scan vs Traditional 2D Survey
Benefits of Laser Scanning & BIM
BUILDING INFORMATION MODELING (BIM)
BIM Defined
Benefits
BIM MODELS
PROCESS BEFORE
CAD, PDF,
Paper Copy Model Site Verification
Model
Site Verification
Model
Site Verification
Model
Etc…
RATIONELLE
GATHERING AS-BUILT DATA
BEFORE LASER SCANNING
Tools inadequate for BIM
Problems
Inefficient
Not accurate
Safety – some locations
unsafe to work in or
inaccessible
No data to import into BIM
BIM software = data not
verifiable
RATIONELLE
FARO FOCUS OR TRIMBLE TX5 3D
LASER SCANNER
Distance accuracy up to ±2mm
Range from 0.6M up to 120M
Measurement rate up to 976 000
points/second
Integrated camera – photorealistic 3D
3D color scans with up to 70
megapixels resolution
TARGET SPHERES OR SQUARES*
LAPTOP OR TABLET
Allows for remote control of scanner
EQUIPMENT
BENEFITS
LASER SCANNING IS EFFICIENT
Scans capture up to 900 000 points
of data per second. A scan can
take as little as 5 minutes.
Less invasive for the client. Can be
done with a 1 or 2 man team.
Safer for the scanning team.
LASER SCANNING IS ACCURATE
Within a 25m radius, each scan point
is accurate to ±2mm.
LASER SCANNING IS DETAILED
Scan resolution can be as detailed
as1 point of data every 3mm.
LASER SCANNING IS 3D
The processed point cloud looks
like an exact 3D replica of the
building or site.
Building Section from Laser Scan
Space Schedule
Number Name Space Type Condition Type Area Volume Actual Exhaust Airflow
Specified Airflow
Specified Exhaust Airflow Specified Return Airflow Specified Supply Airflow
101 VEST 1 <Building> Heated and cooled 85 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
102 CORR. <Building> Heated and cooled 133 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
103 MEN'S Restrooms Heated and cooled 148 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
104 STORAGE <Building> Heated and cooled 98 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
105 WOMEN'S Restrooms Heated and cooled 139 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
106 MECH. RM Electrical/Mechanical Heated and cooled 43 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
107 VEST 2 <Building> Heated and cooled 74 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
108 RECEPTION <Building> Heated and cooled 75 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
109 KITCHENETTE <Building> Heated and cooled 125 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
110 LOUNGE <Building> Heated and cooled 346 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
111 SHOWROOM General High Bay - Manufacturing Facility Heated and cooled 6103 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
112 CUST. PRIVY ROOM <Building> Heated and cooled 177 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
113 SHOWROOM OFFICE <Building> Heated and cooled 176 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
115 CLOSET <Building> Heated and cooled 14 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM
PROCESS WITHOUT DRAWINGS
Scan Model BIM
PROCESS WITH DRAWINGS
CAD, PDF,
Paper Copy Model Scan
(Verification)
BIM
BENEFITS
SCAN INFORMATION COMES IN 2
PARTS – POINT CLOUD &
PANORAMIC SCAN IMAGES
POINT CLOUD DATA IS SUPPORTED
BY MOST BIM SOFTWARE
Scans can be imported directly into
the modeling software
POINT CLOUD & BIM ARE 3D
Point clouds can be viewed in plan,
section, elevation, 3D perspective &
isometric views
Allows us to check the accuracy of
the modeling in many different
views, even if objects are obscured
in some views
FEWER SITE VISITS REQUIRED TO
GATHER INFORMATION FOR BIM
All data for Coach Delivery building
BIM was gathered in about 4 hours
Information that is unclear in the
imported point cloud can be
viewed & measured from the
panoramic scan images
IMPROVED COORDINATION &
ACCURACY
LASER SCAN INFORMATION IS
VERIFIABLE. ANY DOUBTS ABOUT
ACCURACY CAN BE COMPARED TO
THE SCAN.
BIM DEFINED
The National Building Information Model Standard Project Committee has the
following definition:
Building Information Modeling (BIM) is a digital representation of physical
functional characteristics of a facility. A BIM is a shared knowledge
information about a facility forming a reliable basis for decisions during its
cycle; defined as existing from earliest conception to demolition.
Traditional building drawings rely on 2D plans, elevations, sections, etc.
BIM is three-dimensional and covers more than just geometry. It also covers spatial
relationships, energy & lighting analysis, geographic information, quantities and the
properties of building components (manufacturer details, etc.)
Architectural Objects
Walls, doors, windows, roofs, floors, slabs,
cabinets, furniture, etc.
Structural Objects
Columns, beams, foundations, footings, rebar, etc.
Electrical Objects
Receptacles, switches, panels, transformers,
MCC’s, transfer switches, generators, etc.
Mechanical Objects
Air handlers, VAV’s, chillers, boilers, pumps, tanks,
coils, ducts & duct, fittings, pipe & pipe fittings, etc.
Plumbing Objects
Toilets, sinks, urinals, hot water tanks, softeners,
etc.
BENEFITS – WORK WITH REAL OBJECTS
In BIM, while working in plan views, you
are creating also creating sections,
exterior elevations, interior elevations,
3D views and schedules.
Additional views can be taken or
created any where in the model and
will be generated automatically.
Schedules are populated as schedule
objects are added to the model.
Door numbers
Window numbers
Equipment ID’s
Different views of the same
information.
BENEFITS - PRODUCTIVITY
Improved Accuracy - The accuracy of the
model promotes more effective
communication between the parties
involved in a building project and reinforces
reinforces understanding.
Reduced number of errors and changes
throughout the design and construction
process.
The parametric capabilities of BIM allow for
for the consistent, coordinated
representation of the model in all views and
and drawing outputs.
IMPROVED ACCURACY
3D visualization and analysis tools
allow for earlier evaluation of the
building design and performance
by all parties involved.
Building design and performance
can easily be changed in the early
stages of a project, saving both
time and money.
BENEFITS - EARLY DECISION MAKING
DRAWINGS SETS
Tools in the BIM software automatically fill in
information that needs to be manually entered
entered and verified in CAD software.
Examples: Section heads, detail numbers,
elevation numbers, door and window tags, equipment
numbers, etc.
PROJECTS
BIM promotes collaboration between architects,
designers, engineers and contractors by working
working with the same information.
Clash detection tools can be used to resolve
conflicts between models before getting to the site.
All parties involved will understand the entire
scope of the project.
BENEFITS - IMPROVED COORDINATION
SAMPLE PROJECTS

More Related Content

What's hot

Stereo Matching by Deep Learning
Stereo Matching by Deep LearningStereo Matching by Deep Learning
Stereo Matching by Deep LearningYu Huang
 
Integration of BIM and GIS: From Ideal to Reality
Integration of BIM and GIS: From Ideal to RealityIntegration of BIM and GIS: From Ideal to Reality
Integration of BIM and GIS: From Ideal to RealitySANGHEE SHIN
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS GIM_nv
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
Presentation Virtual Reality and CAD
Presentation Virtual Reality and CADPresentation Virtual Reality and CAD
Presentation Virtual Reality and CADontor omi
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Building information modelling
Building information modellingBuilding information modelling
Building information modellingKiran Birdi
 
Revit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDRevit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDGaurang Trivedi
 
Computer vision introduction
Computer vision  introduction Computer vision  introduction
Computer vision introduction Wael Badawy
 
Windows Virtual Desktop Customer benefits
Windows Virtual Desktop Customer benefitsWindows Virtual Desktop Customer benefits
Windows Virtual Desktop Customer benefitsPrime Infoserv
 
How digitization & BIM is transforming construction
How digitization & BIM is transforming constructionHow digitization & BIM is transforming construction
How digitization & BIM is transforming constructionBIM Design Hub
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit StructureMostafa El-Ashmawy
 
3d visualization ppt
3d visualization ppt3d visualization ppt
3d visualization pptkcsm1th
 
3Dマップを活用したVisual Localization
3Dマップを活用したVisual Localization3Dマップを活用したVisual Localization
3Dマップを活用したVisual LocalizationHajime Taira
 

What's hot (20)

Stereo Matching by Deep Learning
Stereo Matching by Deep LearningStereo Matching by Deep Learning
Stereo Matching by Deep Learning
 
Bim its applications
Bim   its applicationsBim   its applications
Bim its applications
 
Integration of BIM and GIS: From Ideal to Reality
Integration of BIM and GIS: From Ideal to RealityIntegration of BIM and GIS: From Ideal to Reality
Integration of BIM and GIS: From Ideal to Reality
 
Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS Bridging the gap between BIM and GIS
Bridging the gap between BIM and GIS
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Presentation Virtual Reality and CAD
Presentation Virtual Reality and CADPresentation Virtual Reality and CAD
Presentation Virtual Reality and CAD
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
Computer Vision Crash Course
Computer Vision Crash CourseComputer Vision Crash Course
Computer Vision Crash Course
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
AR/SLAM and IoT
AR/SLAM and IoTAR/SLAM and IoT
AR/SLAM and IoT
 
Building information modelling
Building information modellingBuilding information modelling
Building information modelling
 
Revit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDRevit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADD
 
Computer vision introduction
Computer vision  introduction Computer vision  introduction
Computer vision introduction
 
LEGO Architecture meets BIM
LEGO Architecture meets BIMLEGO Architecture meets BIM
LEGO Architecture meets BIM
 
Windows Virtual Desktop Customer benefits
Windows Virtual Desktop Customer benefitsWindows Virtual Desktop Customer benefits
Windows Virtual Desktop Customer benefits
 
How digitization & BIM is transforming construction
How digitization & BIM is transforming constructionHow digitization & BIM is transforming construction
How digitization & BIM is transforming construction
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit Structure
 
Economic-Benefits-BIM
Economic-Benefits-BIMEconomic-Benefits-BIM
Economic-Benefits-BIM
 
3d visualization ppt
3d visualization ppt3d visualization ppt
3d visualization ppt
 
3Dマップを活用したVisual Localization
3Dマップを活用したVisual Localization3Dマップを活用したVisual Localization
3Dマップを活用したVisual Localization
 

Viewers also liked

Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...
Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...
Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...Monica Moran
 
AAM Group GIS - BIM Integration
AAM Group GIS - BIM Integration AAM Group GIS - BIM Integration
AAM Group GIS - BIM Integration Brian Nicholls
 
helium-neon laser
helium-neon laserhelium-neon laser
helium-neon laserJeevan M C
 
He ne lasers 1
He ne lasers 1He ne lasers 1
He ne lasers 1Chuhdry
 
Laser & Its Application
Laser & Its ApplicationLaser & Its Application
Laser & Its ApplicationTuhin_Das
 

Viewers also liked (7)

Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...
Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...
Integration of Aerial Imagery, LiDAR and TLS for modelling the Melbourne Cric...
 
AAM Group GIS - BIM Integration
AAM Group GIS - BIM Integration AAM Group GIS - BIM Integration
AAM Group GIS - BIM Integration
 
helium-neon laser
helium-neon laserhelium-neon laser
helium-neon laser
 
He ne lasers 1
He ne lasers 1He ne lasers 1
He ne lasers 1
 
Laser
LaserLaser
Laser
 
Laser & Its Application
Laser & Its ApplicationLaser & Its Application
Laser & Its Application
 
Laser ppt
Laser pptLaser ppt
Laser ppt
 

Similar to Laser scanning & bim for building documentation

CD September 204 - 360 Bam Nuttall
CD September 204 - 360 Bam NuttallCD September 204 - 360 Bam Nuttall
CD September 204 - 360 Bam NuttallComit Projects Ltd
 
Software presentation
Software presentationSoftware presentation
Software presentationTimun Loh
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastCCT International
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideChandresh Chudasama
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDFSandy .
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
Software Applications
Software ApplicationsSoftware Applications
Software ApplicationsXinYee Khoo
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadBarun Chatterjee
 
Laser Scanning SOQ.PDF
Laser Scanning SOQ.PDFLaser Scanning SOQ.PDF
Laser Scanning SOQ.PDFVenugopal Raju
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction IndustryCCT International
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)Hasif Alias
 
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...Comit Projects Ltd
 
BUILDING INFORMATION MODELING.pptx
BUILDING INFORMATION MODELING.pptxBUILDING INFORMATION MODELING.pptx
BUILDING INFORMATION MODELING.pptxjayaseelan44
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital constructionBIMLABS GLOBAL
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningTop BIM Company
 
How BIM Can Make Building Renovations and Retrofits More Efficient?
How BIM Can Make Building Renovations and Retrofits More Efficient?How BIM Can Make Building Renovations and Retrofits More Efficient?
How BIM Can Make Building Renovations and Retrofits More Efficient?Ryan Stein
 

Similar to Laser scanning & bim for building documentation (20)

The Ultimate Guide to Scan to BIM
The Ultimate Guide to Scan to BIMThe Ultimate Guide to Scan to BIM
The Ultimate Guide to Scan to BIM
 
industrial_shed_en
industrial_shed_enindustrial_shed_en
industrial_shed_en
 
CD September 204 - 360 Bam Nuttall
CD September 204 - 360 Bam NuttallCD September 204 - 360 Bam Nuttall
CD September 204 - 360 Bam Nuttall
 
Software presentation
Software presentationSoftware presentation
Software presentation
 
Building Information Modeling Services New Zealand
Building Information Modeling Services New ZealandBuilding Information Modeling Services New Zealand
Building Information Modeling Services New Zealand
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
 
Scan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete GuideScan to BIM Overview: Your Complete Guide
Scan to BIM Overview: Your Complete Guide
 
BIM_BROCHURE.PDF
BIM_BROCHURE.PDFBIM_BROCHURE.PDF
BIM_BROCHURE.PDF
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Smeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & RoadSmeaton and Watt- Changing Infrastructure & Road
Smeaton and Watt- Changing Infrastructure & Road
 
Laser Scanning SOQ.PDF
Laser Scanning SOQ.PDFLaser Scanning SOQ.PDF
Laser Scanning SOQ.PDF
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
ETDP 2015 D1 Technology Enabled Facility Lifecycle Data Management - Grace Wa...
 
BUILDING INFORMATION MODELING.pptx
BUILDING INFORMATION MODELING.pptxBUILDING INFORMATION MODELING.pptx
BUILDING INFORMATION MODELING.pptx
 
Building information modeling services new zealand
Building information modeling services new zealand  Building information modeling services new zealand
Building information modeling services new zealand
 
BIM-Era of digital construction
BIM-Era of digital constructionBIM-Era of digital construction
BIM-Era of digital construction
 
SCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planningSCAN to BIM services, documenting existing building for digital planning
SCAN to BIM services, documenting existing building for digital planning
 
How BIM Can Make Building Renovations and Retrofits More Efficient?
How BIM Can Make Building Renovations and Retrofits More Efficient?How BIM Can Make Building Renovations and Retrofits More Efficient?
How BIM Can Make Building Renovations and Retrofits More Efficient?
 

Recently uploaded

Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 

Recently uploaded (20)

Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 

Laser scanning & bim for building documentation

  • 1.
  • 2.
  • 3. OVERVIEW LASER SCANNING Gathering data before laser scanning Equipment Benefits of Laser Scanning COACH DELIVERY BUILDING SCAN Cost – Laser Scan vs Traditional 2D Survey Benefits of Laser Scanning & BIM BUILDING INFORMATION MODELING (BIM) BIM Defined Benefits BIM MODELS
  • 4. PROCESS BEFORE CAD, PDF, Paper Copy Model Site Verification Model Site Verification Model Site Verification Model Etc…
  • 6. GATHERING AS-BUILT DATA BEFORE LASER SCANNING Tools inadequate for BIM Problems Inefficient Not accurate Safety – some locations unsafe to work in or inaccessible No data to import into BIM BIM software = data not verifiable RATIONELLE
  • 7. FARO FOCUS OR TRIMBLE TX5 3D LASER SCANNER Distance accuracy up to ±2mm Range from 0.6M up to 120M Measurement rate up to 976 000 points/second Integrated camera – photorealistic 3D 3D color scans with up to 70 megapixels resolution TARGET SPHERES OR SQUARES* LAPTOP OR TABLET Allows for remote control of scanner EQUIPMENT
  • 8. BENEFITS LASER SCANNING IS EFFICIENT Scans capture up to 900 000 points of data per second. A scan can take as little as 5 minutes. Less invasive for the client. Can be done with a 1 or 2 man team. Safer for the scanning team. LASER SCANNING IS ACCURATE Within a 25m radius, each scan point is accurate to ±2mm. LASER SCANNING IS DETAILED Scan resolution can be as detailed as1 point of data every 3mm. LASER SCANNING IS 3D The processed point cloud looks like an exact 3D replica of the building or site. Building Section from Laser Scan
  • 9. Space Schedule Number Name Space Type Condition Type Area Volume Actual Exhaust Airflow Specified Airflow Specified Exhaust Airflow Specified Return Airflow Specified Supply Airflow 101 VEST 1 <Building> Heated and cooled 85 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 102 CORR. <Building> Heated and cooled 133 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 103 MEN'S Restrooms Heated and cooled 148 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 104 STORAGE <Building> Heated and cooled 98 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 105 WOMEN'S Restrooms Heated and cooled 139 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 106 MECH. RM Electrical/Mechanical Heated and cooled 43 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 107 VEST 2 <Building> Heated and cooled 74 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 108 RECEPTION <Building> Heated and cooled 75 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 109 KITCHENETTE <Building> Heated and cooled 125 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 110 LOUNGE <Building> Heated and cooled 346 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 111 SHOWROOM General High Bay - Manufacturing Facility Heated and cooled 6103 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 112 CUST. PRIVY ROOM <Building> Heated and cooled 177 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 113 SHOWROOM OFFICE <Building> Heated and cooled 176 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM 115 CLOSET <Building> Heated and cooled 14 SF Not Computed 0 CFM 0 CFM 0 CFM 0 CFM PROCESS WITHOUT DRAWINGS Scan Model BIM
  • 10. PROCESS WITH DRAWINGS CAD, PDF, Paper Copy Model Scan (Verification) BIM
  • 11. BENEFITS SCAN INFORMATION COMES IN 2 PARTS – POINT CLOUD & PANORAMIC SCAN IMAGES POINT CLOUD DATA IS SUPPORTED BY MOST BIM SOFTWARE Scans can be imported directly into the modeling software POINT CLOUD & BIM ARE 3D Point clouds can be viewed in plan, section, elevation, 3D perspective & isometric views Allows us to check the accuracy of the modeling in many different views, even if objects are obscured in some views FEWER SITE VISITS REQUIRED TO GATHER INFORMATION FOR BIM All data for Coach Delivery building BIM was gathered in about 4 hours Information that is unclear in the imported point cloud can be viewed & measured from the panoramic scan images IMPROVED COORDINATION & ACCURACY LASER SCAN INFORMATION IS VERIFIABLE. ANY DOUBTS ABOUT ACCURACY CAN BE COMPARED TO THE SCAN.
  • 12. BIM DEFINED The National Building Information Model Standard Project Committee has the following definition: Building Information Modeling (BIM) is a digital representation of physical functional characteristics of a facility. A BIM is a shared knowledge information about a facility forming a reliable basis for decisions during its cycle; defined as existing from earliest conception to demolition. Traditional building drawings rely on 2D plans, elevations, sections, etc. BIM is three-dimensional and covers more than just geometry. It also covers spatial relationships, energy & lighting analysis, geographic information, quantities and the properties of building components (manufacturer details, etc.)
  • 13. Architectural Objects Walls, doors, windows, roofs, floors, slabs, cabinets, furniture, etc. Structural Objects Columns, beams, foundations, footings, rebar, etc. Electrical Objects Receptacles, switches, panels, transformers, MCC’s, transfer switches, generators, etc. Mechanical Objects Air handlers, VAV’s, chillers, boilers, pumps, tanks, coils, ducts & duct, fittings, pipe & pipe fittings, etc. Plumbing Objects Toilets, sinks, urinals, hot water tanks, softeners, etc. BENEFITS – WORK WITH REAL OBJECTS
  • 14. In BIM, while working in plan views, you are creating also creating sections, exterior elevations, interior elevations, 3D views and schedules. Additional views can be taken or created any where in the model and will be generated automatically. Schedules are populated as schedule objects are added to the model. Door numbers Window numbers Equipment ID’s Different views of the same information. BENEFITS - PRODUCTIVITY
  • 15. Improved Accuracy - The accuracy of the model promotes more effective communication between the parties involved in a building project and reinforces reinforces understanding. Reduced number of errors and changes throughout the design and construction process. The parametric capabilities of BIM allow for for the consistent, coordinated representation of the model in all views and and drawing outputs. IMPROVED ACCURACY
  • 16. 3D visualization and analysis tools allow for earlier evaluation of the building design and performance by all parties involved. Building design and performance can easily be changed in the early stages of a project, saving both time and money. BENEFITS - EARLY DECISION MAKING
  • 17. DRAWINGS SETS Tools in the BIM software automatically fill in information that needs to be manually entered entered and verified in CAD software. Examples: Section heads, detail numbers, elevation numbers, door and window tags, equipment numbers, etc. PROJECTS BIM promotes collaboration between architects, designers, engineers and contractors by working working with the same information. Clash detection tools can be used to resolve conflicts between models before getting to the site. All parties involved will understand the entire scope of the project. BENEFITS - IMPROVED COORDINATION

Editor's Notes

  1. Model information is only as good as the existing drawings. Traditional approach assumes that the accuracy of the existing drawings are good. Site verification can be costly depending on the number of trips required.
  2. Biggest benefit is that the data is verifiable. Go to Recap and show the laser scan for the Coach Delivery Building.
  3. This approach starts with the CAD drawings. We can start with the drawings because we will verify the information with the laser scan. This workflow is quick and accurate, combining existing CAD with Scan data.
  4. Conservative Estimate for similar amount of data. 5 days, 8 hours per day, 2 people @ $26/hr = $2080 Lift Rental = $500 Return Visits? No verifiable data Questionable accuracy