Purpose•   When creating a test plan up front for what test activities to execute in a    project, creating a static plan ...
Dynamic Test Plans Basics                                               Large Test Activity             Assess risk level ...
Dynamic Test Plan Overview                                    Until Test Stop                                   Criteria a...
How to create Dynamic Test Plans•   It does not matter if you are executing scripted manual tests, exploratory    testing,...
How to create Dynamic Test Plans•   Every test activity we execute give us more information – not using this    informatio...
How to create Dynamic Test Plans•   Every test activity we execute give us more information – not using this    informatio...
Planning Estimates•   By having these branching test plans it will be more difficult to give one    figure when it comes t...
Summary•   By implementing dynamic test plans, not only will the test plans be more    accurate, but we will work in a mor...
Upcoming SlideShare
Loading in …5
×

Dynamic test plans

498 views

Published on

Published in: Technology
1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
498
On SlideShare
0
From Embeds
0
Number of Embeds
5
Actions
Shares
0
Downloads
10
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

Dynamic test plans

  1. 1. Dynamic Test PlansBuilding Flexibility into your Test Plans
  2. 2. Purpose• When creating a test plan up front for what test activities to execute in a project, creating a static plan based on known risks at the start of the project is most likely sub-optimal• The more we test, the more of the risk-space is explored – after having executed the first test activity, we know more about what we need to test than we did at the start of the project• Creating a dynamic plan with many different paths based on explored risks during a project is more flexible and efficient, but requires more of the project organization• This presentation just covers to basic concept, and it needs to be adapted to specific organizations and projects
  3. 3. Dynamic Test Plans Basics Large Test Activity Assess risk level based on outcome of initial test activity Medium Test ActivitySmall Test Activity Small Test Activity No Test Activity
  4. 4. Dynamic Test Plan Overview Until Test Stop Criteria are met Test Stop Criteria are met
  5. 5. How to create Dynamic Test Plans• It does not matter if you are executing scripted manual tests, exploratory testing, or running automated tests, you should always have a plan which has an inbuilt feedback loop• Create a branching test plan as illustrated on the previous slide, that take into account different scenarios, with their respective costs• This will require a slightly increase effort upfront, but will be much more accurate since it does not give a false sense of security that we know all risks at the start of the project
  6. 6. How to create Dynamic Test Plans• Every test activity we execute give us more information – not using this information to improve our plans incrementally is very inefficient• Not planning for that we will get this information during the project is also not very efficient• Our plans need to be created so that they use this inbuilt feedback loop efficiently• One way is to have a risk assessment after each test activity which then selects on which branch in the test plan to continue on
  7. 7. How to create Dynamic Test Plans• Every test activity we execute give us more information – not using this information to improve our plans incrementally is very inefficient• Not planning for that we will get this information during the project is also not very efficient• Our plans need to be created so that they use this inbuilt feedback loop efficiently• One way is to have a risk assessment after each test activity which then selects on which branch in the test plan to continue on
  8. 8. Planning Estimates• By having these branching test plans it will be more difficult to give one figure when it comes to cost and time• It is necessary to provide the project with a span of times and costs, which span from the first possible stop testing scenario, the most likely scenario, to the scenario with the largest cost and longest time
  9. 9. Summary• By implementing dynamic test plans, not only will the test plans be more accurate, but we will work in a more efficient way, both with regards to costs, and risk level• It will require a slightly increased effort upfront, but will reduce the amount of unnecessary testing during the project due to using the information gained from test activities to select how to proceed according to the different branches in the plan

×