• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Anna_Torriani_Lorenzo_Pagnamenta_MHBL
 

Anna_Torriani_Lorenzo_Pagnamenta_MHBL

on

  • 736 views

BIS Congres 2010 Lausanne presentation: Anna Torriani, Lorenzo Pagnamenta - "Mariners Harbor Branch Library, The award winning building for the New York Public Library"

BIS Congres 2010 Lausanne presentation: Anna Torriani, Lorenzo Pagnamenta - "Mariners Harbor Branch Library, The award winning building for the New York Public Library"

Statistics

Views

Total Views
736
Views on SlideShare
736
Embed Views
0

Actions

Likes
0
Downloads
14
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Anna_Torriani_Lorenzo_Pagnamenta_MHBL Anna_Torriani_Lorenzo_Pagnamenta_MHBL Presentation Transcript

    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I TRIP ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I SITE ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I SITE ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I SITE ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I SITE ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I NYPL SYSTEM ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I FUNCTION ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I FUNCTION ARCHITECTS PLANNERS LLP
    • A R C H I T E C T: A R C H I T E C T: DDC: DESIGN COMMISSION: M AYO R : NYPL: L . PA G N A M E N TA A. TORRIANI D. BURNEY J. STUCKEY M. BLOOMBERG P. L E C L E R C M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I T H E P L AY E R S ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R Photo by damien romanens BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I CONCEPT ARCHITECTS PLANNERS LLP
    • SCHEME 1 SCHEME 2 SCHEME 3 M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I PRE-DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • NEW YORK CITY DEPARTMENT OF DESIGN AND CONSTRUCTION (DDC) LOCAL LAW 86 FOR 2005 LEED PROJECT TIMELINE - items in bold indicate links to related reference documents posted on DDC website Construction Post Construction (One Pre-Design Pre-Preliminary Design Schematic Design Design Development Construction Documents Post Warranty Period Administration Year Warranty Period) Review Project at Strategy Structures incorporates Local Law 86/ 2005 Note: in projects where there is no Structures to register Commissioning Task Structures provides to AE all data needed Structures to educate Contractors Structures provides to AE all data Structures provides to AE all Board. Determine High LEED Project Timeline of Activities Pre-Preliminary Design Phase, all Order for fundamental building systems to complete Phase II Local Law 86 and ensure that LEED specialist needed to complete Phase III Local data needed to Complete Phase Performance Pilot/ LL86 into Project Schedule Pre-Preliminary Design activities Report up to two weeks after describes LEED requirements and Law 86 Report after USGBC certifies IV LL86 Report 12-24 months and LEED scope requirements shall be performed during the If applicable, Structures brings construction issuance of CP for construction commissioning requirements in Pre- rating level achieved and prior to end after warranty period per LL86 for 2005 Rules Structures provides to Architecture and Schematic Design Phase manager on board to address lead time issues award and Kick-off meetings of warranty period DDC TASKS Engineering (AE) all data needed to on green building materials, deconstruction, complete Phase I Local Law 86 and salvage/recycling opportunities for Structures to schedule LEED Procure design services for LEED Report up to two weeks after construction and demolition waste compliance meeting with contractors tracking and filing, quality issuance of CP for design Structures to schedule LEED Plan every 2 months energy efficient lighting , energy Structures to schedule LEED Plan Review Review Meeting at end of phase Structures to ensure commissioning modeling/analysis and Structures schedules High Performance/ Meeting at end of phase Structures to enforce contractor related tasks are completed sustainable landscaping as LEED Workshop after programming is compliance with C&D Waste, IAQ recommended at Strategy Board completed Plans, and LEED submittal requirements Structures to ensure commissioning Structures to ensure commissioning Structures to review Workshop agenda with related tasks are completed related tasks are completed Structures to ensure commissioning AE related tasks are completed Write LEED Performance and Review contractor submittals Submit final LEED Application to LEED Specialist to run High Performance/ Register Project with USGBC under Review LEED documentation requirements Submittal Requirements into for compliance to LEED specification USGBC LEED Workshop. Client agency and all New York City for all items to be included in the drawings specifications consistent with targeted language subconsultants to attend. Review drafts of and outline specifications LEED credits. Include Construction and Deliver Plaque following deliverables: Demolition Waste (C+D) Specifications Prepare HVAC Energy Analysis after w/ recycling/salvage and C+D Waste DESIGN CONSULTANT TASKS Energy Analysis Plan. Propose commissioner approval of scheme at Pre- Prepare lighting design. Analyze and Management Plan requirements. LEED Specialist to run LEED energy analysis methodology. Propose Art Commission meeting. Perform incorporate into Energy Analysis Include Commissioning Agent compliance meetings and alternative energy efficiency measures computerized analysis of HVAC central Specifications assemble remaining LEED (EEM's) and HVAC options to be analyzed. plant and distribution options in accordance Prepare EEM Energy Analysis. Investigate credit documentation Research and document occupancy schedule with DDC AE approved Energy Analysis savings of energy efficiency measures Update Energy Analysis @ 100% in and applicable energy rates. Propose Plan, indicating payback for each (EEMs) in accordance with Energy Analysis accord with EA plan. Run interactive case plan to provide data required for LL86 reporting Plan w/ selected central plant & selected EEM's Prepare Construction Management Plans. Review C+D Waste Solar Diagrams. Analyze Solar Present recommended EEM's to DDC for Update LEED Plan following LEED Management Plan and Indoor Air orientation of conceptual designs Update LEED Plan. Evaluate various approval prior to Design Development review meeting Quality (IAQ) Management Plan options for achieving LEED credits. Report submission LEED Plan. Develop a LEED Identify credits that can be targeted and Coordinate with Commissioning Agent Plan (High Performance Plan) strike those that are cost prohibitive that targets LEED credits or not applicable Update LEED Plan. Target a minimum Submit LEED Application, Part I 80% of total LEED points required to USGBC Environmental Programming Matrix Describe preferred conditions for each space Include updated Environmental Include an updated Environmental Programming Matrix, updated Include an updated LEED Plan and EEM Programming Matrix, an updated LEED Incorporate deliverables into Pre-Preliminary LEED Plan, and HVAC Energy Energy Analysis in Design Development Plan and 100% Energy Analysis in Report Analysis in Schematic Design Report Report Construction Document Report Prepare Design Intent Document with input Prepare Outline Commissioning Plan Present Commissioning at Kick-off Organize, manage and videotape training COMMISSIONING from Designer AGENT TASKS Prepare Commissioning-related Schedule Testing Activities Prepare Final Commissioning Report Review DD submission specifications for incorporation into the Construction Documents Review selected shop drawings Witness Seasonal Testing Designate shop drawing submittals to be Perform Installation Verification and Perform Near-Warranty Check-up reviewed by Commissioning Agent pre-functional testing Prepare Operation & Maintenance Review 100% CD Submission Witness Functional Testing (O&M) and Recommissioning Manuals M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • LEED for New Construction v2.2 Registered Project Checklist CONSTRUCTION DOCUMENT CHECKLIST-19 MAR 2009 Project Name: MARINERS HARBOR LIBRARY Project Address: Mariners Harbor, Staten Island Yes ? No Yes ? No 8 6 Sustainable Sites 14 Points 2 5 6 Materials & Resources 13 Points Y Prereq 1 Construction Activity Pollution Prevention Required Y Prereq 1 Storage & Collection of Recyclables Required 1 Credit 1 Site Selection 1 1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1 1 Credit 2 Development Density & Community Connectivity 1 1 Credit 1.2 Building Reuse, Maintain 100% of Existing Walls, Floors & Roof 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1 1 Credit 4.1 Alternative Transportation, Public Transportation Access 1 1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1 1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1 1 Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 1 1 Credit 3.1 Materials Reuse, 5% 1 1 Credit 4.4 Alternative Transportation, Parking Capacity 1 1 Credit 3.2 Materials Reuse,10% 1 1 Credit 5.1 Site Development, Protect of Restore Habitat 1 1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1 1 Credit 5.2 Site Development, Maximize Open Space 1 1 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1 1 Credit 6.1 Stormwater Design, Quantity Control 1 1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionall 1 1 Credit 6.2 Stormwater Design, Quality Control 1 1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionall 1 1 Credit 7.1 Heat Island Effect, Non-Roof 1 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 7.2 Heat Island Effect, Roof 1 1 Credit 7 Certified Wood 1 1 Credit 8 Light Pollution Reduction 1 Yes ? No Yes ? No 9 6 Indoor Environmental Quality 15 Points 4 1 Water Efficiency 5 Points Y Prereq 1 Minimum IAQ Performance Required 1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1 Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required 1 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1 1 Credit 1 Outdoor Air Delivery Monitoring 1 1 Credit 2 Innovative Wastewater Technologies 1 1 Credit 2 Increased Ventilation 1 1 Credit 3.1 Water Use Reduction, 20% Reduction 1 1 Credit 3.1 Construction IAQ Management Plan, During Construction 1 1 Credit 3.2 Water Use Reduction, 30% Reduction 1 1 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1 1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1 10 1 6 Energy & Atmosphere 17 Points 1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1 1 Credit 4.3 Low-Emitting Materials, Carpet Systems 1 Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required 1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1 Y Prereq 2 Minimum Energy Performance Required 1 Credit 5 Indoor Chemical & Pollutant Source Control 1 Y Prereq 3 Fundamental Refrigerant Management Required 1 Credit 6.1 Controllability of Systems, Lighting 1 9 1 Credit 1 Optimize Energy Performance 1 to 10 1 Credit 6.2 Controllability of Systems, Thermal Comfort 1 10.5% New Buildings or 3.5% Existing Building Renovations 1 1 Credit 7.1 Thermal Comfort, Design 1 14% New Buildings or 7% Existing Building Renovations 2 1 Credit 7.2 Thermal Comfort, Verification 1 17.5% New Buildings or 10.5% Existing Building Renovations 3 1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 21% New Buildings or 14% Existing Building Renovations 4 1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 Yes ? No 24.5% New Buildings or 17.5% Existing Building Renovations 5 28% New Buildings or 21% Existing Building Renovations 6 4 1 Innovation & Design Process 5 Points 31.5% New Buildings or 24.5% Existing Building Renovations 7 35% New Buildings or 28% Existing Building Renovations 8 1 Credit 1.1 Innovation in Design: Publicize project-DDC & NYPL 1 9 38.5% New Buildings or 31.5% Existing Building Renovations 9 1 Credit 1.2 Innovation in Design: Green houskeeping products & practice 1 42% New Buildings or 35% Existing Building Renovations 10 1 Credit 1.3 Innovation in Design: Exceed SSc4.1 alternative transportation requirem 1 3 Credit 2 On-Site Renewable Energy 1 to 3 1 Credit 1.4 Innovation in Design: Exceed EQc8.1 daylight and views requirement 1 2.5% Renewable Energy 1 1 Credit 2 LEED® Accredited Professional 1 7.5% Renewable Energy 2 Yes ? No 12.5% Renewable Energy 3 1 Credit 3 Enhanced Commissioning 1 37 7 25 Project Totals (pre-certification estimates) 69 Points Certified: 26-32 points, Silver: 33-38 points, Gold: 39-51 points, Platinum: 52-69 points 1 Credit 4 Enhanced Refrigerant Management 1 1 Credit 5 Measurement & Verification 1 1 Credit 6 Green Power 1 M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • S U N PAT H M A R I N E R’ S H A R B O R BRANCH LIBRARY P LU S G R O U P A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • SECTION M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • E L E VAT I O N S M A R I N E R’ S H A R B O R BRANCH LIBRARY n A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • pq- Parthenocissus quinquefolia ep- Echinacea purpurea iv- Iris versicolor pv- Panicum virgatum ‘Heavy Metal’ is- Iris silbirica ‘Ru ed Velvet’ PS Prunus Sargentii pa- Pennisetum alopecuriodes Cs- Cornus sereicea ‘Artic Fire’ M A R I N E R’ S H A R B O R n BRANCH LIBRARY SCAPE A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R n BRANCH LIBRARY SCAPE A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I USERS ARCHITECTS PLANNERS LLP Photo by anna torriani
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I USERS ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I USERS ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • 7’-6” 5’-6” 3’-9” 3’-9” 1’-8¹/₂” 3’-3¹/₂” 4’-9” varies 1’-8¹/₂” 3’-3¹/₂” varies typical typical typical typical Section Longitudinal Periodicals & Newspaper I New Books New Books I Media I I Easy Fiction and Non-Fiction I I Toys I Easy Media I Periodical Elevation - Wall Shelving Fixed Periodical Shelf (Display) M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I DESIGN ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I GROUNDBREAKING ARCHITECTS PLANNERS LLP
    • M A R I N E R’ S H A R B O R BRANCH LIBRARY A T E L I E R PA G N A M E N TA T O R R I A N I ARCHITECTS PLANNERS LLP