arch system components review

748 views

Published on

Field Review of architectural systems components of a Class 10K and Class 100K Cleanroom

Published in: Technology, Business, Design
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
748
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

arch system components review

  1. 1. Field Report: Cleanbox Fitup Architectural Cleanroom Components CLASS 10K & 100k CLEANROOMS
  2. 3. Ducted Supply Level 1 Fin. Ceiling RAF Make-up Air Air Handler
  3. 4. <ul><li>Where are the, </li></ul><ul><li>Make-Up Air Ducts? </li></ul><ul><li>Supply Air Ducts? </li></ul><ul><li>Return Air Ducts? </li></ul>
  4. 5. EQUAL EQUAL CLEANROOM GRID CORNER LOCKS PERFORATED RAF TILE
  5. 6. TUBE BASE ADJ. HEAD
  6. 7. LIQUID ADHESIVE CABLE TRAY
  7. 8. RAF PANELS GROUND CONTACT
  8. 9. PROFILE OF CUT RAF PANEL <ul><li>DISCUSS: </li></ul><ul><li>DEFLECTION AND EXPANSION TOLERANCES </li></ul><ul><li>MIN. CUT PANEL DIMENSION </li></ul>
  9. 10. COLUMN GROUND
  10. 12. BELOW FLOOR PLENUM DIVIDE
  11. 13. <ul><li>DISCUSS: </li></ul><ul><li>CLEAN SLOPE </li></ul><ul><li>FLAT SHELVES </li></ul><ul><li>DIRTY POCKETS </li></ul><ul><li>CONC. SLAB E.J. </li></ul><ul><li>LOCATE: </li></ul><ul><li>PIPE RACKS </li></ul><ul><li>CABLE TRAY </li></ul><ul><li>BUILDING GROUND </li></ul><ul><li>CLEANROOM GRID </li></ul>
  12. 14. CLEANBOX PERIMETER WALL AIR FLOW
  13. 15. ABOVE CEILING, OPEN RETURN AIR PLENUM IN OUT
  14. 17. MITER FRAMED, SINGLE PANE GLASS CLASS 10K SIDE
  15. 18. PERIMETER LINER WALL ABOVE CEILING, OPEN RETURN AIR PLENUM <ul><li>DISCUSS: </li></ul><ul><li>EXPANSION TOLERANCES </li></ul><ul><li>LEDGER ANGLE </li></ul>
  16. 19. FRAMING FOR PERIMETER LINER WALL PANELS
  17. 20. ALUM, T-GRID GASKETED SHOULDER CONT., SCREW BOSS
  18. 21. CONT., SCREW BOSS TOP VIEW, T-GRID GRID HANGER CLIP
  19. 22. CRWP HEADTRACK PRIMARY STEEL SECONDARY STEEL THROUGH-BOLT CONNECTION GRID HANGER CLIP
  20. 23. <ul><li>LOCATE: </li></ul><ul><li>PRIMARY STEEL </li></ul><ul><li>SECONDARY STEEL </li></ul><ul><li>THREADED ROD TURN-BUCKLE </li></ul><ul><li>CONDUIT ZONE </li></ul><ul><li>THROUGH BOLT CONNECTIONS </li></ul>
  21. 24. POWDER ACTUATED INSERT HEAVY GAUGE WIRE STL CEILING GRID CLASS 100K CLEANROOM

×