Your SlideShare is downloading. ×
  • Like
Jadah pics
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply
Published

 

Published in Business , Economy & Finance
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
450
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. 7/16” Plywood behind all perimeter interior walls prior to boarding and 7/16” Plywood on ceiling prior to boarding
  • 2. Bonus room option /stair lighting option
  • 3. SK ONSITE PACKAGE CONSTRUCTION TURN KEY HOME• PACKAGE 1: ICF BASEMENT PACKAGE, INCL. EXCAVATION AND BACKFILL• PACKAGE 2: GARAGE COMPLETE PACKAGE WITH GRADE BEAM, POURED PAD, JIP ROCK AND INSULATION, CONTRETE ENTRY STEPS, OVERHEAD DOORS AND OPENERS, ELECTRICAL• PACKAGE 3: MECHANICAL AND ELECTRICAL: ALL FIXTURES AND FINAL HOOK UPS• PACKAGE 4: EXTERIOR FINISH: PARGING ON EXPOSED FOUNDATION WALLS, OPTIONAL: BRICK APPLICATION, ACRYLIC STUCCO FINISH
  • 4. 1. STEEL CENTER SUPPORT BEAM TO LIMIT TELEPOSTS2. CONTINUOS SPAN FLOOR JOISTS3. ELECTRICAL INSTALLED IN ICF EXTERIOR WALLS4. JIP ROCK INSTALLATION ON ALL EXTERIOR WALLS AND STAIR WELL BY JADAH
  • 5. 1. STAKING OUT OF BASEMENT LOCATION WITH HOME OWNERS ASSISTANCE2. EXCAVATION AND BACKFILL3. 8’ OR 9’ ICF FOUDATION WITH BASEMENT PLUMBING ROUGH IN / INCL POURED FLOOR4. GARAGE GRADE BEAM AND POURED PAD5. CONCRETE FRONT ENTRY STEPS WITH PIERS / STEPS TIED INTO FOUNDATION6. PARGING ON EXPOSED FOUNDATION WALLS
  • 6. 1. COMPLETE HOME HOOK UP: GAS, WATER, HYDRO, DU CTWORK, ALL MECHANICAL ROOM FIXTURES (FURNACE, HOT WATER TANK, AIR EXCHANGER, ETC.)2. TRENCHING: ALL UTILITIES TO BE
  • 7. 1. FLOOR HEAT: (GARGE / HOME): GAS / ELECTRIC BOILER OPTION WITH ZONE TEMP CONTROLS
  • 8. 1. SEPERATE SUBPANEL OPTION FOR EMEGENCY GENERATOR HOOKUP2. WATER SOFTNER OPTION
  • 9. 1. TURN KEY
  • 10. 1. TURN KEY www. Jadahhomes.com
  • 11. JADAH 2 DAY DESIGN PROGRAM TO GUARANTEE POSSESION DATE• STEP 1: CALL OUR OFFICE TO DISCUSS YOUR NEEDS: 1.204,480.7632• STEP 2: WALK THROUGH A JADAH HOME IN YOUR AREA• STEP 3: VISIT OUR OFFICE AND BUILDING SITE IN WINKLER FOR AN EXTENSIVE TOUR• STEP 4: 2-Day Design and Product Selection Program. Meet with our architectural designer to custom design your home at no additional cost. Simply bring any and all ideas so we can design your dream home. Choose all your options with our interior decorators and experienced consultants and leave with sample of all your selections• STEP 5: Guaranteed all-inclusive contracts with no surprises to follow. www.jadahhomes.com