  1. 1. Town of Bethlehem Department of Public Works
  2. 2. Asset Management Asset Management Capital Plan Capital Plan Financial Analysis Financial Analysis
  3. 3. Asset Management • A comprehensive and structured approach to the long term management of assets as tools for the efficient and effective delivery of community benefits
  4. 4. Why Asset Management? • Aging Infrastructure • -Many assets reaching end of useful life • Increased Public Awareness • -Sewer and water line failures • Reduced funding • Plan for future demand
  5. 5. Asset Management • Inventory all assets • Assess Condition • Perform Risk Assessment • Develop Integrated Management Strategy
  6. 6. DPW Assets • Water mains • Over 1,000,000 feet
  7. 7. Replacement needs reflect an echo of earlier demographic waves Water Main Future Pipeline Construction Replacement Needs 20 20 15 $ Millions 15 $ M illio n s 10 10 5 5 0 0 1870 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2005 2015 2025 2035 2045 2055 2065 2075 2085 2095
  8. 8. DPW Assets • Water Tanks • Kenwood – 1928 • Selkirk – 1964 • Elm Ave – 1979 • Park – 1984 • New Scotland - 1984
  9. 9. DPW Assets • Sewer Mains • Over 900,000 feet
  10. 10. Sewer Line Infiltration
  11. 11. DPW Assets • Water Filtration Plant-New Salem • -1.1 billion gallon reservoir • -Filtration Plant 5MGD , 50 years old and at end of useful life
  12. 12. DPW Assets • Water Plant-Clapper Road • Wells with 6 MGD capacity • Filtration Plant with 6 MGD capacity and 12 years old
  13. 13. DPW Assets • Reservoirs and Dams • Vly Reservoir • Old Reservoir adjacent to New Salem Water Tank
  14. 14. DPW Assets • Sewer Plant - Dinmore Road • 5.9 MGD permit capacity • 33 years old
  15. 15. DPW Assets • Sewer Pumping Stations • 39 stations • Age is from over 70 years old to two years • 70% are over 20 years old
  16. 16. Future Demand • Comprehensive Plan has identified areas where we can expect additional water and sewer demand • DPW has developed a projected water system demand and has developed a long term plan to achieve adequate supply
  17. 17. Capital Improvement Plan • DPW has taken a ten year look ahead to determine the priority needs for water and sewer infrastructure • The capital plan is reviewed annually to determine if the highest priorities are being accomplished • A financial plan is necessary to support the capital plan
  18. 18. Funding • Water and Sewer Infrastructure has historically been paid for by residential and commercial development • Federal and State funding has contributed to construction of wastewater plants in the past • There is very limited federal and state funding to support rebuilding infrastructure going forward
  19. 19. Financial Plan Analysis • Operating Budgets are adequate to support routine maintenance • Water and sewer breaks will continue to erode operating budgets since they are not planned work • A Rate Analysis has been performed to determine how best to support the long term financial requirements that support the capital investment for water and sewer services
  20. 20. Next Steps • Present long range capital plan • Provide funding strategy to support capital requirements • Present Rate Analysis scenarios

×