Your SlideShare is downloading. ×
Microsoft power point   new york - manhattan3
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Microsoft power point new york - manhattan3

436
views

Published on

Published in: Technology, News & Politics

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
436
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. New York - Manhattan Mult-dike InspirationBattery Park – Brooklyn Bridge Platform Klimaatdijk Erik Luijendijk Jan Dirk van Duijvenbode
  • 2. Timeline Manhattan
  • 3. 1644
  • 4. 1660
  • 5. The Water Gate at Pearl & Wall Streets - 1691
  • 6. 1763
  • 7. 1847
  • 8. 200 years later
  • 9. HollandThe most beautiful and safest delta
  • 10. NRC 5 oktober 2006
  • 11. Highwater as a chance 2.0
  • 12. Program climate delta dike started 2008 • Water safety: 100 x safer • Spatial quality: 10 x better
  • 13. 7 triggers climate delta dike1. Climate change2. Higher sea levels3. Larger water supply in rivers4. Increased social risks in low-lying areas.5. The spatial and landscape quality.6. Knowledge Power of Dutch society.7. Competitiveness Dutch economy. 3 concepts……
  • 14. Forces climate delta dike “Safe” The "Trigger" "Beautiful" Netherlands Climate change Netherlands Higher sea levels, more Larger water in the rivers barrierWater safety Spatial Planning Need to dike Extra reinforcements land use Delta Technology
  • 15. Tripledike
  • 16. Moundsdike
  • 17. Overtoppingdike
  • 18. Climate dike Design Tiel
  • 19. Pilot climate delta dike Tiel-Oost, issues 2009
  • 20. Profile existing dike Tiel 6m 15 m +11,9 mToetspeil2011 = +11,6 m 1: 3 2,5 1: 1 : 25 1: +7,1 5 +6,3 m 48 m
  • 21. Design profile traditionel dike reinforcement Tiel 6m +13,7 SWL2050 = +12,7 m 1: 2, 3 5 1: +8,4 1 : 25 +7,8 bestaande dijk 1: +7,1 5 48 m 23 m
  • 22. Design profile Tiel climate delta dike +15,1 mSWL2100+14,1 m kernzone bestaande dijk kernzone +7,1 +6,35 27 m 48 m 50 m 120 m
  • 23. Pilot climate delta dike Tiel-Oost, situation
  • 24. Pilot climate delta dike Tiel-Oost, minimal option
  • 25. Pilot climate delta dike Tiel-Oost, maximum option
  • 26. Multi dike design Kwatijk
  • 27. HP6 – Multidike Design Katwijk
  • 28. HP6 – Multidike Design Katwijk
  • 29. Climate dike Manhattan
  • 30. Manhattan - New York
  • 31. Trace?
  • 32. Steps…Charrette / interactive design session:Day 1• Site visit• Inspiration: – Climate dike presentations NL – Presentations Manhattan• Analyzing Manhattan: multi layer approach• First sketches/impressions future situationDay 2• Group design: options for the Manhattan-situation• Final presentations• Informal closingCouple of weeks later… an inspiration map
  • 33. Charrette• Interactive design• Learning from each other• Sharing knowledge and experiences• With local stakeholders and experts• And NL-team platform Climate Delta Dike• Combining technical solutions and design options• Result: various alternatives and overall view
  • 34. Multi layer approachCurrent Ducth multi layer policy:1. Prevention (technical safety measures);2. Damage prevention through sustainable spatial planning (zoning);3. Damage response through adequate emergency management.

×