Your SlideShare is downloading. ×
Malmberg  Water    Peter  Bäckström
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Malmberg Water Peter Bäckström

408
views

Published on

Published in: Technology, Business

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
408
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. IT IS PROFITABLE TO COOPERATE WITH THE NATURE www.malmberg.se ISA Stockholm 2009-03-20
  • 2.
    • Peter Bäckström
    • Business Area Manager GeoEnergy
    • Malmberg Water AB
    ISA Stockholm 2009-03-20
  • 3. Natural solutions taking care of man and the environment Why Malmberg?
  • 4. 140 years with focus on water water treatment drilling waste management biogas geoenergy
  • 5. Biogas for green electric power
  • 6.
    • heating-/cooling plants with energy storage
    • heat pump systems
    • 30 years of experience
    • Malmberg standard
    Sustainable energy geoenergy
  • 7. Vällingby Centrum
  • 8.
    • Client - Svenska Bostäder AB
    • City modernization project 300 million EUR
    • 185 000 m 2 total area
    • Sustainable, low carbon energy
    • Replaces / completes district heating
    • Cooling demand design criteria
    Vällingby Centrum Media central heating/cooling
  • 9. Large scale rock storage Media central heating/cooling
  • 10. Vällingby Centrum Centre of Chemistry in Lund Benchmarked media central
  • 11. 153 bore holes, depth 230 m
  • 12.
    • Turnkey contract
    • 1.8 MW cooling / 1.75 MW heat
    • Investment 4,5 million EUR incl. the rock storage
    • Installation period 18 months
    • 153 bore holes, 230 m deep
    • Free cooling 1.2 MW
    Centre of Chemistry in Lund Reference Centre of Chemistry in Lund Media central heating/cooling
  • 13. Vällingby Centrum New car parking on top of the rock storage
  • 14. Vällingby Centrum Plenty of space ?
  • 15. Vällingby Centrum Crane for heavy components