• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Holy Wisdom Story
 

Holy Wisdom Story

on

  • 410 views

The windows and doors for this project were supplied by Wisconsin Building Supply's commercial division.

The windows and doors for this project were supplied by Wisconsin Building Supply's commercial division.

Statistics

Views

Total Views
410
Views on SlideShare
356
Embed Views
54

Actions

Likes
0
Downloads
1
Comments
0

2 Embeds 54

http://blog.wibuildingsupply.com 49
http://feeds.feedburner.com 5

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Sun/Sun glass COG values U = 0.25, SHGC = 0.22, Tvis = 0.20 LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Note light colored interior walls No blinds on any windows Light colored carpeting LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Note bamboo ceiling – sustainable material Light colored interior walls to reflect light LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction LEED Platinum – 63 points 2010
  • Here are the specific credits where windows and doors may possibly assist a project team to achieve their desired certification level. It should be noted that the underlined credits are “prerequisites” and therefore are mandatory requirements the project teams must meet. The thing to truly understand is that a window or door product by itself will not provide credit points. A product’s overall performance values or a certain Sustainable nature of the product can contribute value, but a majority of the credits shown are related to how the products are used in the design of the project. The following slides describe the possible merit for assistance to each of these credits.
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Note bamboo floors Light colored walls no window treatments of any kind Minimal ceiling lights Large skylight over font LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Note roof top PV array White colored roofing to reflect heat loading HP Sun/Sun glass has darker appearance and slightly more reflectance than normal Sun LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Large skylight over font at entry View to main sanctuary beyond – lit only with daylight form our windows LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Main reception gallery area light colored walls, bamboo flooring, no window treatments required due to HP Sun/Sun glass LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Green roof on portion of new structure Green roof on outer structure is on reused portion of demolished original building LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Main dinning area –note no window treatment required due to glass Light colored surfaces and bamboo flooring LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction West elevation of building – glazed with Sun/Sun in 400 Series Casement and Awning product Offices and meeting rooms on this side of building Garage doors to left is area with green roof on top PV array is visible from this side on main sanctuary roof LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction View of sanctuary interior Note motorized and fixed awning units in clerestory - these units face north and are glazed with normal HP Sun glass Basic design intent was to have all glass HP Sun/Sun except for north facing units – in this room the upper clerestory units were HP Sun and all lower units were HP Sun/Sun Note again the use of light colored walls and bamboo flooring Minimal indirect lighting Windows face SE and require no window treatments for morning services due to 20% VT property of Sun/Sun glass LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Daytime view inside sanctuary – no window treatment required due to 20%VT on our Sun/Sun glass LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction Parking lot in foreground contains 39 wells for geothermal system – each well is 300’ deep facility LEED Platinum – 63 points 2010
  • 400 series casements- Architectural Series commercial doors – special Sun Sun low E ig Hoffman Architects and Construction LEED Platinum – 63 points 2010

Holy Wisdom Story Holy Wisdom Story Presentation Transcript

  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
    • LEED Platinum – highest point total award to date
    • 63 points – awarded 2010
    • Andersen 400 series Casements, commercial doors
    • Sun/Sun Low E glass – low visible light transmission
    • Construction cost = $209.00/sqft
    • Total project cost = $246.00/sqft (includes all project related
    • costs [except land] – architect, furnishings, organ, LEED cert
    • Typical LEED platinum project cost = $366.00/sqft !!
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1 Andersen LEED contributions to project
    • The Glass Story
    • HP Sun/Sun glass was used on east, south and west elevations – * Tvis = 0.20
    • HP Sun was used on north elevation only – Tvis = 0.30
    • * Center of glass values
    • The use of low Tvis product allows for a more constant interior light level and artificial light use ( no energy spikes)– no blinds or interior shades required on project – maintaining clear views on the brightest of days!
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1 Andersen LEED contributions to project
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • USGBC LEED-NC Fenestration Assistance in LEED-NC
    • Energy & Atmosphere (EA)
    • EA Prerequisite 2 Minimum Energy Performance
    • EA 1 Optimize Energy Performance
    • EA 2 On-site Renewable Energy
    • EA 6 Green Power
    • Materials & Resources (MR)
    • MR 2.1 & 2.2 Construction Waste Management
    • MR 4.1 & 4.2 Recycled Content
    • MR 5.1 & 5.2 Regional Materials
    • MR 7 Certified Wood (FSC)
    • Indoor Environmental Quality (EQ)
    • EQ Prerequisite 1 Minimum IAQ Performance
    • EQ 2 Increased Ventilation
    • EQ 3.2 Construction IAQ Management Plan: Before Occupancy
    • EQ 4.1, 4.2 & 4.4 Low-emitting Materials
    • EQ 6.1 Controllability of Systems: Lighting
    • EQ 6.2 Controllability of Systems: Thermal Comfort
    • EQ 7.1 Thermal Comfort: Design
    • EQ 8.1 Daylight & Views: Daylight 75% of Spaces
    • EQ 8.2 Daylight & Views: Views 90% of Spaces
    Prerequisites are mandatory requirements!
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1
  • Holy Wisdom
    • Holy Wisdom Monastery, Madison, WI
    Title Here and Here and Here Andersen Corporation Company Confidential 1