2nd philippine german solar energy forum manila 2013 may 6-10
Upcoming SlideShare
Loading in...5
×
 

2nd philippine german solar energy forum manila 2013 may 6-10

on

  • 561 views

The presentation was given at the 2nd Philippine-German Solar Energy Forum in Manila organized by GPCCI describing PV-Hybrid solutions and benefits for existing and green field telecom cell sites.

The presentation was given at the 2nd Philippine-German Solar Energy Forum in Manila organized by GPCCI describing PV-Hybrid solutions and benefits for existing and green field telecom cell sites.

Statistics

Views

Total Views
561
Views on SlideShare
561
Embed Views
0

Actions

Likes
0
Downloads
4
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

2nd philippine german solar energy forum manila 2013 may 6-10 2nd philippine german solar energy forum manila 2013 may 6-10 Presentation Transcript

  • page 12nd Philippine-German Solar Energy ForumPV Hybrid Systems6-10 May 2013, ManilaIngo Meyer I VP Sales & Marketingb+w Electronics Systems GmbH & Co. KGOberhausen, Germany
  • page 2 May 14, 2013PV-Hybrid DC Power Solutions For UnstableGrids On Telecom Wireless Sites
  • page 3Established in 1980Central design and manufacturing in OberhausenProduction of power systems opened in 1992Nokia OEM partner for power units since 1992Delivered over 100.000 power distribution unitssince 1992Delivered over 70.000 systems since 1992Quality Standards: ISO 9001:2000, ISO 14001Up to maximum 1.000 Systems per monthMay 14, 2013b+w Experience
  • page 4Headquarters, OberhausenMay 14, 2013b+w Experience
  • page 5b+w FacilityMay 14, 2013• 4.700m² production• 3.500m² storage• 2.100m² offices• 190m² laboratory• 170m² training center• Technologies: AWT, Integration• Quality Standards:• DIN EN ISO 9001:2000• DIN EN ISO 14001• 200 up to maximum 1.000 Systems per month
  • page 6*Source: Capgemini, Telecom, Media & EntertainmentOperating costs of tower infrastructure, like diesel generators,air-conditioning equipment, and security and site rentals, form a significantportion of nearly 60% of site expenses.*60%of site expensesMay 14, 2013Situation On Telecom Wireless Sites
  • page 7Source: Money Week 2012 4 17Oil prices have been on everyones mind, having spiked 141%over the last 3 years.USD141%May 14, 2013Oil Prices Go Up
  • page 8Existing Site Solution: With PV-Hybrid PowerComponents Adapting To InfrastructureMay 14, 2013
  • page 9OPEX calculation shows more than 70% energy saving with a PV-Hybrid powersolution vs. a shelter powered by diesel genset 24/7.70%energy savingMay 14, 2013Case Study Nigeria: PV-Hybrid Solution Vs. Shelter70% savings
  • page 10 May 14, 2013Green Field Site Solution: With SolarCube LowEnergy Passively Cooled Outdoor Cabinet
  • page 11Material lifting Cabinet installedMay 14, 2013Case Study India: SolarCube Installation
  • page 12Equipment installed in progressEquipment installedMay 14, 2013Case Study India: SolarCube Installation
  • page 13Final integrated cabinet with equipmentMay 14, 2013Case Study India: SolarCube Installation
  • page 14Note: Battery Capacity for Conventional shelter is High to cater to 8 hrs Backup. In case if Integratedshelter is having the same BB AH, the Consumption will increase by 0.35W/ Day as float charging.ON GRID SITE- GSM SOLO ( Solar+Battery Bank+SEB)May 14, 2013Case Study India: SolarCube Vs. Shelter50% savings
  • page 1550%energy savingMay 14, 2013Case Study India: SolarCube Vs. Shelter50% savings
  • page 16Shelter, Brazil SolarCube, BrazilMay 14, 2013Case Study Brazil: SolarCube Vs. Shelter87% savings
  • page 17W h kWh Shelter/Y SolarCube/Y DeltaBase station 600 24 14,4 5.256 5256Aircon 5.000 24 120 43.800 0Fan 100 24 2,4 0 876Transformer 38 24 0,91 332,9 0Transformer HE 17 24 0,41 0 148,9Battery Lead 92 24 2,2 805,9 0Batter Li-Ion 23 24 0,55 0 201,48Rectifier (losses) 60 24 1,44 525,6 0Rectifier LP(losses)36 24 0,86 0 315,4Total kWh/Y 50.720,4 6.797,78 -87%0 201,48525,6 00 315,40.720,4 6.797,78 -87%May 14, 2013Case Study Brazil: SolarCube Vs. Shelter87% savings
  • page 18OPEX calculation from EADS shows a 87% energy saving with SolarCubevs. a Shelter.87%energy savingMay 14, 2013Case Study Brazil: SolarCube Vs. Shelter87% savings
  • page 19 May 14, 2013Green Field Site Solution: SolarCube +HybridCube Independent DC Power Supply
  • page 20The b+w HybridCube is a compact independent off grid DC powersupply system for outdoor telecom equipment utilising solar panels,diesel generator and batteries.May 14, 2013HybridCube Independent DC Power Supply
  • page 21 May 14, 2013Break Even Expected At 2-3 Years
  • page 22Conventional Shelters with DG Sets SolarCubeLow EnergyPassively CooledOutdoor CabinetHybridCubeHybrid PowerIndependentDC PowerSupplyMay 14, 2013Our Solution For A Typical Green Field TelecomTower Infrastructure
  • page 23Your questions please?May 14, 2013The Customer Benefits
  • page 24 May 14, 2013Contact: Ingo MeyerVP Sales & Marketingb+w Electronic Systems GmbH & Co. KGZur Eisenhuette 11D-46047 OberhausenMobile: +49 163 2626675Mail to: ingo.meyer@b-w.comwww.b-w.com