Comitetul de Monitorizare, noiembrie 2013 - Stadiul implementării Regio - Programul Operaţional Regional

Comitetul de Monitorizare, noiembrie 2013 - Stadiul implementării Regio - Programul Operaţional Regional

Published in Economy & Finance
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
302
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Miliarde Euro
  • 2. 30% 20,35% 15,72% 13,48% 17,80% 2,65%
  • 3. PROGRAMUL OPERAȚIONAL REGIONAL - proiecte depuse, aprobate, contractate, finalizate – 18 octombrie 2013 Alocari Proiecte depuse Proiecte aprobate* Proiecte contractate Proiecte finalizate Axe prioritare FEDR (Mil. EURO) Nr. FEDR (Mil. EURO) % din alocat Nr. 1. Urban 1117.8 746 1,805 161.5% 543 2. Transport 758.4 329 2,275 299.9% 3. Social 585.6 1,248 1,443 4. Mediul de afaceri 502.4 4,866 5 Turism 663.3 6 AT Total FEDR (Mil. EURO) % din alocat Nr. 1,326 118.6% 482 160 1,048 138.2% 246.4% 594 690 2,003 398.8% 2,070 1,313 1,676 252.6% 98.6 78 115 3726.0 8,580 9,316 FEDR (Mil. EURO) % din alocat Nr. FEDR % din (Mil. EURO) alocat 1,206 107.9% 98 108 9.6% 146 999 131.7% 69 392 51.6% 117.9% 546 663 113.2% 225 192 32.8% 557 110.8% 1,791 446 88.8% 1,346 210 41.8% 632 762 114.9% 538 595 89.6% 125 127 19.2% 116.6% 67 106 107.3% 67 99 100.4% 53 47 47.5% 250.0% 4,066 4,489 120.5% 3,570 4,007 107.5% 1,916 1,076 28.9% * Proiectele care au primit punctaj ≥ 3,50 puncte la evaluarea tehnică şi financiară si care nu au fost respinse ulterior Euro = 4,4692 RON
  • 4. PROGRAMUL OPERAȚIONAL REGIONAL - proiecte depuse, aprobate, contractate, finalizate şi plăţi – 18 octombrie 2013 PROIECTE CONTRACTE ALOCĂRI PROIECTE DEPUSE 2007 - 2013 PROBATE* SEMNATE (FEDR) Axă prioritară/ Domeniu (FEDR) (FEDR) (FEDR ) major de intervenţie/ Operaţiune lansată mil euro mil euro % mil euro % mil euro % 1,325.7 118.6% 1,206.06 107.9% 2 1,325.7 161.5% 118.6% 1,206.06 107.9% 2 FINALIZATE (FEDR) Fonduri CE plătite către beneficiari (prefinaţări + rambursări) FEDR FEDR autorizat rambursate de de AMPOR CE mil euro % mil euro % mil euro 107.74 9.6% 320.27 28.7% 283.04 25.3% 107.74 9.6% 320.27 28.7% 283.04 mil euro % 25.3% DMI 1.1 Dezvoltare Urbană 1,117.81 1,804.85 Axa prioritară 1 1,117.81 1,804.85 DMI 2.1 Infrastructură rutieră 758.36 2,274.64 299.9% 1,047.6 138.2% 8 998.98 131.7% 391.63 51.6% 551.49 72.7% 498.83 65.8% 1,047.6 299.9% 138.2% 8 998.98 131.7% 391.63 51.6% 551.49 72.7% 498.83 65.8% 161.5% Axa prioritară 2 758.36 2,274.64 DMI 3.1 Ìnfrastructura de sanătate 174.20 291.58 167.4% 213.02 122.3% 200.97 115.4% 30.44 17.5% 67.47 38.7% 60.27 84.58 192.66 227.8% 97.67 115.5% 91.04 107.6% 40.68 48.1% 46.17 54.6% 45.10 84.58 96.52 114.1% 81.76 96.7% 84.93 100.4% 50.33 59.5% 58.90 69.6% 57.67 68.2% DMI 3.4 Infrastructură educaţională 242.19 861.98 355.9% 297.89 123.0% 285.70 118.0% 79.05 32.6% 129.37 53.4% 120.90 49.9% Axa prioritară 3 585.55 1,442.73 246.4% 690.34 117.9% 662.64 113.2% 200.51 34.2% 301.90 51.6% 283.95 48.5% DMI 4.1 Infrastructura de afaceri 246.55 1,294.90 525.2% 292.46 118.6% 185.65 75.3% 40.67 16.5% 71.25 28.9% 65.05 26.4% 26.71 48.47 181.5% 34.39 128.7% 33.84 126.7% 0.00 0.0% 5.66 21.2% 3.18 11.9% 229.09 659.82 288.0% 229.82 100.3% 226.43 98.8% 169.45 74.0% 184.66 80.6% 180.75 78.9% 502.35 2,003.20 398.8% 556.66 110.8% 445.91 88.8% 210.11 41.8% 261.57 52.1% 248.99 49.6%   53.3% DMI 3.3 Echipamente servicii de urgentă DMI 4.2 Sit-uri industriale DMI 4.3 Microîntreprinderi Axa prioritară 4 * Proiectele care au primit punctaj ≥ 3,50 puncte la evaluarea tehnică şi financiară si care nu au fost respinse ulterior   253.9 34.6% DMI 3.2 Infrastructură servicii sociale   % 22.7%   525.1 69.2%                 275.9 47.1%             252.8 50.3% Euro = 4,4692 RON
  • 5. PROGRAMUL OPERAȚIONAL REGIONAL - proiecte depuse, aprobate, contractate, finalizate şi plăţi – 18 octombrie 2013 ALOCĂRI PROIECTE 2007 - PROIECTE DEPUSE PROBATE* 2013 (FEDR) (FEDR) Axă prioritară/ Domeniu (FEDR) major de intervenţie/ Operaţiune lansată mil euro mil euro DMI 5.1 Patrimoniul cultural 241.89 530.72 DMI 5.2 Cazare şi agrement turistic 293.63 DMI 5.3 Promovarea turismului % mil euro CONTRACTE SEMNATE (FEDR ) PROIECTE FINALIZATE (FEDR) Fonduri CE plătite FEDR către beneficiari FEDR autorizat de rambursate de (prefinaţări + AMPOR CE rambursări) % mil euro % mil euro % mil euro % mil euro % 219.4% 315.83 130.6% 261.60 108.1% 46.24 19.1% 102.02 42.2% 93.30 38.6% 1,000.25 340.6% 334.46 113.9% 230.04 78.3% 72.05 24.5% 91.36 31.1% 88.56 30.2% 127.80 144.73 113.2% 112.05 87.7% 102.86 80.5% 8.82 6.9% 20.33 15.9% 18.02 14.1% Axa prioritară 5 663.33 1,675.69 252.6% 762.33 114.9% 594.51 89.6% 127.11 19.2% 213.71 32.2% 199.87 30.1% DMI 6.1 Implemetare, management şi evaluare POR 90.39 101.97 112.8% 91.85 101.6% 91.85 101.6% 43.83 48.5% 45.78 50.6% 40.07 44.3% DMI 6.2 Publicitate şi informare POR 8.24 13.02 158.1% 7.20 87.4% 7.20 87.4% 3.01 36.6% 2.78 33.8% 2.78 33.8% Axa prioritară 6 98.63 114.99 116.6% 99.05 100.4% 99.05 100.4% 46.84 47.5% 48.56 49.2% 42.85 43.4% 27.3 27.7% TOTAL POR la 18.10.2013 3,726.02 9,316.11 120.3% 4,007.16 107.5% 1,083.94 29.1% 1,697.51 45.6% 1,557.53 41.8% 1,532.9 41.1% 250.0% 4,481.8 * Proiectele care au primit punctaj ≥ 3,50 puncte la evaluarea tehnică şi financiară si care nu au fost respinse ulterior mil euro % 198.0 29.9% Euro = 4,4692 RON
  • 6. PROGRAMUL OPERAȚIONAL REGIONAL - gradul de realizare a indicatorilor de program– 18 octombrie 2013 Axa Prioritara Denumire Indicator UM Ținta POR Indicatori aferenti proiectelor contractate Indicatori aferenti proiectelor finalizate financiar AP1 Planuri integrate de dezvoltare urbană acceptate nr 30 95 317% 0 0% AP1 Proiecte care asigură îmbunătăţirea infrastructurii urbane şi serviciilor urbane, inclusiv transportul urban nr 60 325 542% 60 100% AP1 Proiecte care promovează dezvoltarea durabilă a mediului de afaceri nr 15 25 167% 2 13% AP1 Proiecte care asigură reabilitarea infrastructurii sociale, inclusiv locuinţe sociale şi îmbunătăţirea serviciilor sociale nr 25 132 528% 43 172% AP1 Locuitori care beneficiază de implementarea planurilor integrate de dezvoltare urbană nr 400,000 28,440,571 7110% 5,509,805 1377% AP1 Companii atrase in structuri de afaceri nr 400 314 79% 13 3% AP1 Locuri de munca nou create nr 1,500 1,683 112% 29 2% AP2 Lungime drum reabilitat/ modernizat-Drum Judean km 877 2,351 268% 1098 125% AP2 Lungime drum reabilitat/ modernizat-Strazi km 411 291 71% 123 30% AP2 Lungime drum reabilitat/ construit-Centuri km 219 91 42% 22 10% AP2 Creşterea traficului de marfă şi pasageri pe drumurile reabilitate, modernizate, construite % 10 0 0% 0 0%
  • 7. PROGRAMUL OPERAȚIONAL REGIONAL - gradul de realizare a indicatorilor de program– 18 octombrie 2013 Indicatori aferenti proiectelor contractate Indicatori aferenti proiectelor finalizate financiar Axa Prioritara Denumire Indicator UM Ținta POR AP3/DMI3.1 Unitati medicale reabilitate/ modernizate/ echipate-Spitale/Ambulatorii nr 53 88 166% 27 50.9% AP3/DMI3.2 Centre sociale reabilitate/ modernizate/ echipate nr 270 205 76% 95 35.2% AP3/DMI3.3 Unitati mobile echipate nr 510 826 162% 499 97.8% min 12 24 50% 24 50.0% min 8 13 62% 13 61.5% nr 130 215 165% 107 82.3% nr 30 13 43% 4 13.3% nr 35 1 3% 0 0.0% nr 15 8 53% 2 13.3% nr 30,000 505,557 1685% 274,628 915.4% nr 10,000 52,712 527% 23,646 236.5% nr 5,000 0 0% 0 0.0% nr 40,000 88,125 220% 40,501 101.3% nr 3,000 1,000 33% 0 0.0% nr 2,000 10,654 533% 547 27.4% AP3/DMI3.3 AP3/DMI3.3 AP3/DMI3.4 AP3/DMI3.4 AP3/DMI3.4 AP3/DMI3.4 AP3/DMI3.1 AP3/DMI3.2 AP3/DMI3.4 AP3/DMI3.4 AP3/DMI3.4 AP3/DMI3.4 Timpul mediu de răspuns al unităţilor mobile in mediul rural Timpul mediu de răspuns al unităţilor mobile inmediul urban Unităţi şcolare, aparţinând învăţământului obligatoriu, reabilitate/echipate Campusuri pre-universitare reabilitate / echipate Centre pentru formare profesională continuă reabilitate/ echipate Campusuri universitare reabilitate / echipate Persoane care beneficiaza de infrastructura de sanatate reabilitata Persoane care beneficiaza de centrele sociale reabilitate Copii dezavantajati care beneficiaza de infrastructura reabilitata Elevi care beneficiaza de unitati de invatamint reabilitatePersoane care beneficiaza de centrele vocationale reabilitate Studenti care beneficiaza de campusurile reabilitate
  • 8. PROGRAMUL OPERAȚIONAL REGIONAL - gradul de realizare a indicatorilor de program– 18 octombrie 2013 Axa Prioritara Denumire Indicator UM Ținta POR AP4/DMI4.1 Structuri de sprijinire a afacerilor asistate nr 17 AP4/DMI4.1 Locuri de munca nou create nr 3,000* AP4/DMI4.1 IMM atrase in structuri de afaceri nr  * AP4/DMI4.1 Rata de ocupare in structuri de afaceri % AP4/DMI4.1 AP4/DMI4.2 Suprafata utila nou creata a structurilor de afaceri Site-uri industriale poluate şi neutilizate reabilitate şi pregătite pentru noi activităţi economice Indicatori aferenti proiectelor contractate Indicatori aferenti proiectelor finalizate financiar 50 76 9,892 1210 0 447% 330% na 0% 20 1928 287 0 117.6% 64.3% na 0.0% mp  na 80,697 na 22,075 na ha 75 113 151% 0 0.0% 103% 264% 115% 82% 57% 37% 253% 19% 63% 450% 0 5,949 1319 17 22 48 674 43 188,298 31 0.0% 198.3% 87.9% 17.0% 11.0% 16.0% 84.3% 12.3% 47.1% 310.0% AP4/DMI4.2 Locuri de munca nou create nr 1,000 AP4/DMI4.3 Locuri de munca nou create nr 3,000 AP4/DMI4.3 Microintreprinderi asistate financiar nr 1,500 AP5/DMI5.1 Proiecte în turism-Patrimoniu nr 100 AP5/DMI5.1 Locuri de munca nou create nr 200 AP5/DMI5.2 Proiecte în turism-Agrement nr 300 AP5/DMI5.2 Locuri de munca nou create nr 800 AP5/DMI5.2 IMM asistate financiar nr 350 AP5/DMI5.2 Turisti sositi in structuri de cazare nr 400,000 AP5/DMI5.3 Campanii de promovare a brandului turistic nr 10 1034 7,925 1,731 82 114 112 2,027 68 252,066 45 AP5/DMI5.3 Centre Naţionale de Informare şi Promovare Turistică sprijinite nr 10 8 8% 2 2.0% AP5/DMI5.3 Accesari pagina web nr 1,500,000 AP5/DMI5.3 Materiale de informare si publicitate nr 1,000,000 2,144,562 26,284,097 143% 2628% 556,237 4,703,867 37.1% 470.4% *monitorizarea indicatorului se va realiza la 2 ani de la finalizarea proiectului
  • 9. PROGRAMUL OPERAȚIONAL REGIONAL Stadiul implementării Programului Operațional Regional 2007-2013 Regiuni de dezvoltare și OI Turism 18 octombrie 2013 ALOCĂRI 2007 - 2013 Axă prioritară/ (FEDR) Domeniu major de intervenţie/ Operaţiune lansată mil euro 0 NORD EST* SUD EST* SUD* SUD VEST* VEST* NORD VEST* CENTRU* BUCUREŞTI ILFOV* OI TURISM* Total POR (fără Asisenţă Tehnică) la 18.10.2013 Fonduri CE plătite către beneficiari (prefinaţări + rambursări) Plăţi efectuate (FEDR) % mil euro % mil euro %   215.27 155.93 155.97 138.42 96.92 114.31 109.89   37.7% 33.6% 31.3% 28.2% 26.8% 27.0% 28.8% 6 315.00 217.18 207.26 247.82 166.33 191.86 187.82 7=6/1 55.2% 46.8% 41.6% 50.5% 46.0% 45.3% 49.2% 8 308.83 211.30 191.58 239.65 153.26 178.29 181.88 9=8/1 54.1% 45.6% 38.5% 48.9% 42.4% 42.1% 47.7% 97.4% 41.58 13.4% 83.43 26.9% 76.02 24.5% 80.5% 8.82 6.9% 20.16 15.8% 18.94 14.8% 28.6% 1,636.9 45.1% PROIECTE FINALIZATE (FEDR) PROIECTE DEPUSE (FEDR) PROIECTE APROBATE* (FEDR) CONTRACTE SEMNATE (FEDR) mil euro % mil euro % mil euro % mil euro 1 571.15 463.69 497.98 490.28 361.87 423.11 381.45 2 1,394.92 942.91 1,240.17 1,090.44 1,024.87 1,120.97 1,320.42 3=2/1 244.2% 203.3% 249.0% 222.4% 283.2% 264.9% 346.2%   705.39 554.09 625.41 624.11 455.37 490.01 448.31   123.5% 119.5% 125.6% 127.3% 125.8% 115.8% 117.5% 4 632.67 458.53 571.71 536.04 422.95 463.89 417.54 5=4/1 110.8% 98.9% 114.8% 109.3% 116.9% 109.6% 109.5% 310.06 921.50 297.2% 368.00 118.7% 301.92 127.80 144.92 113.4% 112.05 87.7% 102.86 3,627.39 9,201.11 253.7% 4,382.74 120.8% 3,908.11 107.7% 1,037.10 * Proiectele care au primit punctaj ≥ 3,50 puncte la evaluarea tehnică şi financiară si care nu au fost respinse ulterior 1,559.8 43.0% Euro = 4,4692 RON
  • 10. Stadiul implementării proiectelor finantate din POR 2007-2013 • • • • Număr total de proiecte contractate* - 3570 Număr total de proiecte finalizate –2194, respectiv 62% Număr total de proiecte în implementare – 1376, respectiv 38% Din totalul proiectelor aflate în implementare 19% au întârzieri în derularea procedurilor de achiziție **, 13 % au probleme tehnice în implementare***, iar 68% respectă graficul de implementare. ____________________ * la calculul numărului total de proiecte contractate nu au fost introduse contractele reziliate, respectiv 321 (9%) ** întârzieri în derularea procedurilor de achizitie - validarea de ANRMAP a documentatiei de licitatie, perioada îndelungată de evaluare a ofertelor, contestatii la CNSC ale operatorilor economici, invalidarea rezultatului procedurii de UCVAP, etc.; *** Probleme tehnice în implementare - suprapunerea cu proiecte finantate din alte surse, diferente între situatia actuală din teren şi documentatia tehnică, întârzieri în executie ale contractorilor (inclusiv rezilieri ale contractelor de executie/furnizare), probleme financiare ale Beneficiarilor/Contractorilor, lipsa de coordonare a beneficiarilor în contractarea sub-proiectelor, contracte reziliate etc.; 18 octombrie 2013 - cut off date (perioada de analiză)
  • 11. Situatie centralizata implementare POR (fara DMI 4.3 si DMI 5.3) Proiecte cu Proiecte cu Proiecte in întârzieri în Nr. Total de Proiecte in probleme Total finalizate graficul de derularea proiecte implementare tehnice in implementare procedurilor implementare de achiziție Nr. Crt. Regiune 1 Nord Est 219 123 96 34 26 36 2 Sud Est 229 106 123 30 10 83 3 Sud Muntenia 188 70 118 27 30 61 4 Sud Vest 204 107 97 24 17 56 5 Vest 159 74 85 21 22 42 6 Nord Vest 186 97 89 27 18 44 7 Centru 168 80 88 28 17 43 8 Bucuresti Ilfov 95 25 70 31 19 20 1448 682 766 222 159 385 47% 53% 29% 21% 50% Total %
  • 12. Situatie centralizata implementare POR fata de contracte reziliate
  • 13. Număr Data emiterii Instrucțiunea nr 107 29.04.2013 Domeniu de referință privind modificarea manualului de Proceduri – Procedura de Monitorizare a proiectelor finanțate din POR 2007-2013 privind modificarea procesului de evaluare, selecţie şi contractare pentru proiectele depuse în cadrul Programului Operaţional Regional 2007 – 2013, respectiv modificarea prevederilor specifice ale procedurilor de evaluare, Instrucțiunea nr 108 12.06.2013 selecţie şi contractare, în funcţie de schemele de ajutor de stat aplicabile și modificarea prevederilor generale ale procedurilor de evaluare, selecţie şi contractare, indiferent de schemele de ajutor de stat aplicabile Instrucțiunea nr 109 16.09.2013 privind aplicarea mecanismului cererilor de plată pentru beneficiarii privați ai POR 2007-2013
  • 14. MINISTERUL DEZVOLTĂRII REGIONALE ȘI ADMINISTRAȚIEI PUBLICE Autoritatea de Management pentru POR Tel: 0372 111 412, Fax: 0372 111 630 email: info@mdrap.ro www.inforegio.ro