0
© KMD A/S
Infinit den 4.06.2013
13. AUGUST 2013
TEST AF DRIFTSPLATFORM
DIAS 1
DOKUMENT NR.1 /VERSION 1.0
© KMD A/S
AGENDA
_Organisation og Analyseprojektet
_Hvor er vi nu og hvor vil vi hen?
_Kan vi anvende V-modellen?
_Sammenh...
© KMD A/S
We Design,
Build
and Manage
Infrastructure to add
value to Your business
KMD PRÆSENTATION
INDSÆT DATO FOR OPRETT...
© KMD A/S
13-08-2013
© KMD A/S
DATACENTER:
UP-TO-DATE. TIER LEVEL 3 OG 4
Main centers in Copenhagen area
3.400 M2 RAISED F...
© KMD A/S
REFERENCES – SELECTED CUSTOMERS
Coop
It Outsourcing , WAN, Integration
Services (EDI) of Mainframe systems
and S...
© KMD A/S
KMD PRÆSENTATION
INDSÆT DATO FOR OPRETTELSE
DIAS 6
© KMD A/S
ANALYSEPROJEKTET
_Projektet og dets karakteristika
_Projektorganisering
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 20...
© KMD A/S
HVOR ER VI NU & HVOR SKAL VI HEN? DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 8
Karakteristika:
En kunde – m...
© KMD A/S
Tuesday, 13 August 2013
DIAS 9
V-model
Test af software
Architecture System integration test
Design System test
...
© KMD A/S
13. AUGUST 2013
DIAS 10V-MODEL
TEST AF NY DRIFTSPLATFORM
Architecture & Design Application Readiness Verificatio...
© KMD A/S
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 11
PRØVER / TESTNIVEAUER / TESTTYPER
Tekniske Driftsforberedende...
© KMD A/S
EKSEMPEL: TEST AF EN APPLIKATION (1) DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 12
Step
Name
Description Ex...
© KMD A/S
EKSEMPELEKSEMPEL: TEST AF EN APPLIKATION (2) DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 13
Step
Name
Descri...
© KMD A/S
EKSEMPEL PÅ RAPPORTERING OAT FØR APPLICATION
READINESS VERIFICATION
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
D...
© KMD A/S
EKSEMPEL
IBRUGTAGNINGSPRØVERAPPORTERING
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 15
1 Indledning, formål ...
© KMD A/S
KONKLUSION (-1)
ERFARINGER FRA ANALYSEPROJEKTET
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 16
_Tidsforbrug ...
© KMD A/S
KONKLUSION(-2)
INDSTILLING
DOKUMENT NR.1 /VERSION 1.0
13. AUGUST 2013
DIAS 17
En fælles testmodel – (V-modellen)...
Upcoming SlideShare
Loading in...5
×

Test af driftsplatform af Vibeke Kvist, KMD A/S

358

Published on

Oplægget blev holdt ved et seminar i interessegruppen Softwaretest, der blev afholdt den 4. juni 2013. Læs mere om arrangementet her: http://www.infinit.dk/dk/arrangementer/tidligere_arrangementer/seminar_i_interessegruppen_softwaretest_02.htm

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
358
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "Test af driftsplatform af Vibeke Kvist, KMD A/S"

  1. 1. © KMD A/S Infinit den 4.06.2013 13. AUGUST 2013 TEST AF DRIFTSPLATFORM DIAS 1 DOKUMENT NR.1 /VERSION 1.0
  2. 2. © KMD A/S AGENDA _Organisation og Analyseprojektet _Hvor er vi nu og hvor vil vi hen? _Kan vi anvende V-modellen? _Sammenhæng Prøver / Testniveauer / Testtyper _Eksempler: _Test af testtype (installationstest af en applikation) _Rapportering pr. testniveau _Rapportering på en prøve _Konklusion 13. AUGUST 2013 DIAS 2 DOKUMENT NR.1 /VERSION 1.0
  3. 3. © KMD A/S We Design, Build and Manage Infrastructure to add value to Your business KMD PRÆSENTATION INDSÆT DATO FOR OPRETTELSE DIAS 3
  4. 4. © KMD A/S 13-08-2013 © KMD A/S DATACENTER: UP-TO-DATE. TIER LEVEL 3 OG 4 Main centers in Copenhagen area 3.400 M2 RAISED FLOOR, approx. 700 RACKS DATACENTER FACILITIES AND KEY NUMBERS Main Services: MAINFRAME - +40.000 MIPS UNIX/SAP +800 Servers WINTEL +6000 Servers Largest Printing vendor in Denmark Largest independent Network provider
  5. 5. © KMD A/S REFERENCES – SELECTED CUSTOMERS Coop It Outsourcing , WAN, Integration Services (EDI) of Mainframe systems and Systems Monitoring of all systems Q8 Full It-outsourcing, Applications management in Compleks Server platforms – ie Solaris and Wintel Louis Poulsen Lighting It-outsourcing & SAP FDC It Outsourcing of Mainframe Capacity and BPO on Customer services(LD) Danske Spil WAN outsourcing with 3900 Dealers Large financial customer IT Operations of Mainframe and Complex Server portfolio – spanning , Z/OS/Wintel/AIX Platforms eBoks It Outsourcing Mainframe og Server platforms and AMS on systems Synoptik It outsourcing , WAN in Denmark, Sweden and Norway AP Pension It outsourcing on Selected Server systems Bankinvest It outsourcing Server platforms
  6. 6. © KMD A/S KMD PRÆSENTATION INDSÆT DATO FOR OPRETTELSE DIAS 6
  7. 7. © KMD A/S ANALYSEPROJEKTET _Projektet og dets karakteristika _Projektorganisering DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 7
  8. 8. © KMD A/S HVOR ER VI NU & HVOR SKAL VI HEN? DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 8 Karakteristika: En kunde – mange brugere En leverandør – mange teknikere En tekniker – flere opfølgningsværktøjer 3. Parter (Kunde og Leverandør) Flere testmodeller Flere testmanagementværktøjer Projektgrp. på flere geografiske lokationer Skarp dead-line Stor kommunikationsopgave Uensartet rolle- og ansvarsfordeling Lang Turn around tid Manuel versionstyring Oplæring af teknikere pr. projekt En testmodel Et testmanagementværktøj En tekniker – et værktøj Ensartet rolle- og ansvarsfordeling Kort turn around tid Versionsstyring Oplæring, én gang
  9. 9. © KMD A/S Tuesday, 13 August 2013 DIAS 9 V-model Test af software Architecture System integration test Design System test Testniveauer Requirement Accepttest - Pilot operation - User accept test - Release accept test Development Development test Specifikationsniveauer - Customization test (SAP) - Software component test - Software Unit test Release test
  10. 10. © KMD A/S 13. AUGUST 2013 DIAS 10V-MODEL TEST AF NY DRIFTSPLATFORM Architecture & Design Application Readiness Verification (ARV) Testniveauer Requirement Arbejdspakker Operational Acceptance Test (OAT) Specifikationsniveauer Installationstest: - Application - Middleware - Infrastructure - Basis DOKUMENT NR.1 /VERSION 1.0 - Pilot Driftsprøve - User Acceptance Test (UAT) - Flytteprøve / Release - Pre-User Acceptance Test (Pre- UAT) Nuværende drift Afklaringsrapport Ændringsanmodn. Integrationstest Accepttest
  11. 11. © KMD A/S DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 11 PRØVER / TESTNIVEAUER / TESTTYPER Tekniske Driftsforberedende Brugeraccept Flytte Drift Data- migrering Cut-over Regression OAT (Fall-back) Pilottest Integrations- test UAT SLA
  12. 12. © KMD A/S EKSEMPEL: TEST AF EN APPLIKATION (1) DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 12 Step Name Description Expected Result Step 1 Tjek distribution via SCCM At programmet er distribueret via SCCM uden fejl Step 2 Tjek installation At programmet er installeret uden fejl Step 3 Tjek opstart af program Programmet startes op Step 4 Tjek specielle opsætninger Ved opstart af programmet verificeres det om de specielle opsætninger er kommet med som forventet, hvis der er nogle. Step 5 Tjek brugerspecifikke opsætninger Specielle brugerspecifikke opsætninger(Current user registries og filer) kontrolleres med en testbruger, med almindelige brugerrettigheder. Step 6 Tjek login-billede og fortsæt til næste step Hvis der under opstart kommer et login billede, kan der ikke testes yderligere. Testen går videre til næste step Step 7 Tjek afslutning af programmet Programmet afsluttes korrekt
  13. 13. © KMD A/S EKSEMPELEKSEMPEL: TEST AF EN APPLIKATION (2) DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 13 Step Name Description Expected Result Step 8 Tjek genstart af PC PC genstarter. Step 9 Tjek opstart af program Programmet startes op. Step 10 Tjek specielle opsætninger Ved opstart af program tjekkes det om de specielle opsætnnger er kommet med, hvis der er nogle Step 11 Tjek brugerspecifikke opsætninger Specielle brugerspecifikke opsætninger(Current user registries og filer) kontrolleres med en testbruger, med almindelige brugerrettigheder. Step 12 Tjek login billede Hvis der under opstart kommer et login billede, kan der ikke testes yderligere. Testen går videre til næste step Step 13 Tjek afinstallation af program via SCCM Programmet kan afinstalleres via SCCM Step 14 Kontroller afinstallation Programmet er afinstalleret
  14. 14. © KMD A/S EKSEMPEL PÅ RAPPORTERING OAT FØR APPLICATION READINESS VERIFICATION DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 14 Operational Acceptance Test (OAT) på komponenter Område Planlagte Gennemførte Ej gennemførte Not completed Bemærkninger Basis: Servere 125 125 0 0 Infrastructure: BigIP 10 10 0 0 Middleware: DB2 1040 1038 2 0 Udestående er knyttet til ÆA39, som ikke skal udføres endnu hvorfor testcases først gennemføres i forbindelse med ÆA39 UAM 12 12 0 0 MS-SQL- server 0 0 0 0 Er i produktion og testet under Spor X i fase 2. IBM- testcases 21 15 4 2 Sæt af testcases fremsendt af 3.part som vejledende inspiration til KMD. KMD har verificeret de cases som er vurderet relevante for KMD set-up. Udestående cases kan bl.a. skyldes afstubninger i KMD set-uppet Applikation: Desktop manageme nt 5 5 0 0 ULS2 10 (13) 10 (3) KMD tekniker har konstateret, at der er mere der skal rettes end først oplyst af kunden. KMD har derfor efterspurgt flere testcases, der dokumenterer hvor fejlene er. KMD har efterfølgende modtaget yderligere 3 testcases fra kunden for uddybende forretningstest.
  15. 15. © KMD A/S EKSEMPEL IBRUGTAGNINGSPRØVERAPPORTERING DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 15 1 Indledning, formål og résumé 1.1 Résumé 3 1.1.1 Konklusion af verifikationen af flyttebølge 2C 4 1.1.2 Anbefalinger vedr. ibrugtagning 4 1.1.3 Korrigerende handlinger 4 2 Resultater 2.1 Operational Acceptance Test (OAT) 6 2.2 User Acceptance Test (UAT) 7 2.3 Delkonklusion 10 3 Defects 3.1 Status på åbne defects 11 3.2 Delkonklusion 11 4 Organisering 5 Status på risici 5.1 Status på risici der kræver ledelsesfokus 14 5.2 Delkonklusion 14 6 Log
  16. 16. © KMD A/S KONKLUSION (-1) ERFARINGER FRA ANALYSEPROJEKTET DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 16 _Tidsforbrug er flyttet fra at skabe overblik til at analysere og korrigere _Teknikere får ro til defect-rettelser – ”der er mere ro på telefonen !” _Testopgaverne for teknikerne er blevet synlige _Oplæringstiden for teknikere i anvendelse af ALM-defectmodul og proces ca. 1 time – derefter sælger værktøjet sig selv _Samlet og hurtigt overblik leverandør/kunde og internt hos leverandør/kunde _Både model og værktøj vel modtaget – efterspurgt på andre projekter i I/O _Kundens testmanager behersker testmanagementværktøjer _Application Readiness Verification kan være en faldgrube i forhold til tidsplan (husk det er en ny platform)
  17. 17. © KMD A/S KONKLUSION(-2) INDSTILLING DOKUMENT NR.1 /VERSION 1.0 13. AUGUST 2013 DIAS 17 En fælles testmodel – (V-modellen) _Specifikationsniveauer er stort set ens _Testniveauer – er ens, indholdet er forskelligt _Testtyper – er ens, indholdet er forskelligt Et testmanagementværktøj og fælles metode _HP ALM, indstilles _Referenceproject _Guide opdelt på roller _Hvem-Hvad-Hvornår _Afvigelser fra og tilpasninger til metode dokumenteres i projekthåndbog Implementering _Forandringsprojekt _Indsamling / udarbejdelse af generiske testcases fra alle områder _Uddannelse/oplæring pr. projekt – små skridt
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×