5 year cip 083011 if cut

1,102 views

Published on

Published in: Travel
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,102
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

5 year cip 083011 if cut

  1. 1. Bid Year or PType SType PNumber PName PDescription Total Study YearTransport 56th Street over Eagle Deck and Railing 2011 Bridges/ Culverts BM-08-016 $1,298,660.00 ation Creek Replacement Guion Road over Guion BM-09-002 Bridge Deck Overlay $456,515.00 Creek (0908F) 57th Street over BM-10-074 Bridge Rehabilitation $1,024,590.00 Crooked Creek (1012L) Guilford over Canal BM-11-095 Bridge Rehabilitation $700,300.00 (1109L) Meridian St. over White BM-11-096 Bridge Rehabilitation $8,002,900.00 River & Riverview Dr. 56th Street over Fall BM-12-040 Bridge Rehabilitation $561,877.92 Creek (1202F) Country Club Road over BM-15-029 Brdige Removal $1,364,400.00 Abandoned R/R (1502F) 34th Street over Dry BM-16-073 Bridge Rehabilitation $528,430.00 Run (1608F) Gateway Drive over Dry BM-16-074 Bridge Rehabilitation $701,205.00 Run (1619L) Meridian Street over Fall BM-18-074B Bridge Rehabilitation $3,061,000.00 Creek Girls School Road over Remove the existing BM-22-050 Abandoned RR 2000N $878,971.73 bridge (2209F) Lansdowne Road over BM-22-051 Bridge Rehabilitation $492,930.04 Cox Ditch (2208L) Bridge repair. Replace 10th Street over White BM-24-109 missing bolts and $63,471.58 River (Quote) damaged splice plates Washington Street & Rehab railroad BM-25-012 College Avenue under $325,328.35 overpass CSX CSX Bridge over 10th CSX Bridge over 10th BM-25-013 $182,478.27 Street Beautification Street Beautification Aesthetic repairs and pedestrian lighting Downtown CSXT instalation for the CSXT BM-25-178 Overpass Bridges bridges over Capitol $1,502,977.09 Beautification St., Illinois St., Meridian St., and Pennsylvania St. Executive Drive over BM-30-066 Sam Jones Parkway Bridge Rehabilitation $1,022,034.76 (3011L) Southeastern Avenue BM-42-022 Bridge Rehabilitation $576,600.00 over Buck Creek (4212L) 79th Street over BR-05-064 Bridge Replacement $834,670.00 Wadsworth Ditch Grandview Drive over BR-10-075 Bridge Rehabilitation $936,257.00 Crooked Creek(1006F) Eastbourne Drive over BR-19-071 Bridge Replacement $291,548.00 Devon Creek (1913L) Morris Street over Avon BR-29-024 Bridge Replacement $250,310.00 Creek (2904F) Delaware Streetover BR-46-085 Bridge Replacement $592,456.00 Buffalo Creek (4611L) Baker Road over Maze BR-49-001 Bridge Replacement $251,951.00 Creek Culvert Inventory CL-00-001 Inventory Update $500,000.00 Update 2011 Wilson Road (9112W) CL-01-015 Culvert replacement $280,500.00 Culvert Replacement Keystone Avenue over Traffic crossover for Haverstick Creek culvert on Keystone CL-04-006A $0.00 Crossover (Emergency Avenue over Haverstick Quote) Creek Keystone Avenue over Replacement of NB Haverstick Creek CL-04-006B Keystone Avenue over $719,081.00 Replacement Haverstick Creek (Emergency Quote) 79th Street (1410E) CL-04-072 Culvert replacement $49,000.00 Culvert Replacement Culvert Replacement Culvert Replacements CL-11-004 $0.00 Program (2011) for calendar year 2011 16th Street (6620W) CL-23-059 Culvert replacement $40,500.00 Culvert Replacement Marion County Small Marion County Small CL-25-001 Structure Inventory - Structure Inventory - $0.00 2011 2011 Brill Road (2911S) CL-32-131 Culvert replacement $44,387.00 Culvert Replacement Arlington Avenue CL-33-071 (2650S) Culvert Culvert replacement $44,076.00 Replacement High School Road CL-37-035 (5530S) Culvert Culvert replacement $42,400.00 Replacement Karen Drive (5844S) CL-42-020 Culvert replacement $41,800.00 Culvert Replacement Pentecost Road CL-42-021 (10200E) Culvert Culvert replacement $44,076.00 Replacement Hayworth Road (7946S) CL-44-001 Culvert replacement $44,387.00 Culvert Replacement Hayworth Road (8130S) CL-44-002 Culvert replacement $44,387.00 Culvert Replacement Franklin Road (7860S) CL-48-009 Culvert replacement $44,387.00 Culvert Replacement Carroll Road (6400N) CL-51-003 Culvert replacement $41,100.00 Culvert Replacement Northbrook Drive over Northbrook Drive over Howard Johnson Ditch BM-03-001 Howard Johnson Ditch $25,800.00 Superstructure (0313L) Replacement
  2. 2. 82nd Street over Mud Superstructure BM-06-001 $34,682.00 Creek (0601F) rehabilitation Lakeside Drive over BM-08-017 birdge deck overlay $10,000.00 Bushs Run (0804L) Sunset Avenue over Sunset Avenue over BM-10-075 IWC Canal Bridge Deck $65,300.00 IWC Canal (1015L) Overlay 42nd Street over 42nd Street over BM-17-005 Crooked Creek Bridge Crooked Creek Bridge $60,000.00 Deck Overlay (1718L) Deck Overlay (1718L) Ritter Avenue over Ritter Ave. over Devon Devon Creek BM-19-079 $48,296.00 Creek (1914L) Superstructure Replacement 30th Street over 30th Street over Pogues BM-19-080 Pogues Run Bridge $57,200.00 Run (1908F) Deck Overlay German Church Road German Church Road BM-21-041 over Steele Ditch over Steel Ditch Bridge $44,324.94 (2103F) Deck Overlay 42nd Street over Indian 42nd over Indian Creek BM-21-042 $91,557.40 Creek (2106L) Bridge Deck Overlay 10th Street over White 10th Street over White Lick Creek (2203F) 0.12 BM-22-052 Lick Creek Bridge Deck $36,766.00 M west of Country Club Overlay. Rd Dr. Martin Luther King Dr. MLK Jr. Drive and Jr. Drive and 16th BM-24-012 16th Street over Dry $61,500.00 Street over Dry Canal Canal (2410F) Bridge Removal. Bridge Beautification CSX Bridges over for CSX Bridges over BM-25-014 Delaware and South $0.00 Delaware and South Streets Streets Mitthoeffer Road over Mitthoeffer Road over BM-28-001 Morris Ditch Bridge $54,100.00 Morris Ditch (2805F) Deck Overlay Bradbury Avenue over Bradbury Avenue over BM-30-067 State Ditch Bridge Deck $30,000.00 State Ditch (3005L) Overlay Bridge rehabilitation - Kitley Avenue over Lick superstructure BM-34-001 $108,760.00 Creek (3403L) replacement and widening Prospect Road over Bridge Rehabilitation - BM-35-015 Grassy Creek (3508F) Deck Replacement and $42,900.00 CBG bridge widening. Derbyshire Road over Derbyshire Road over BM-46-085 Little Buck Creek Little Buck Creek Bridge $30,000.00 (4608L) Deck Overlay Southport Road over Southport Road over BM-46-086 Little Buck Creek Little Buck Creek Bridge $72,724.00 (4601F) Rehab (4601F) Linden Street over BR-32-131A Bridge Replacement $43,700.00 Pleasant Run (3213F) Mendenhall Road over Mendenhall Road BR-43-001 $95,000.00 Goose Creek (4306L) Bridge Replacement Restoration of the wetland mitigation site Fall Creek Road and at Fall Creek Road and SD-13-047B Shadeland Ave Wetland Shadeland Avenue, in Mitigation Restoration compliance with CoE requirements Bridges/ Culverts Total $28,894,553.08 Emerson Ave. overBridges/ Culverts- Massachusetts Ave & Des. No. 0900011 BM-19-069 $7,367,309.00Fed Aid Conrail (Bid by State) Bridge Rehabilitation DES,INS, CN Illinois Street over Fall Bridge Rehabilitation - BM-25-175 Creek (Bid by State) CN, $300,000.00 Des No. xxxxxxx INS Lafayette Road over Lafayette Road over CSX CSX - 0.45 Miles NW of BR-16-073 (STR. No. 1615F) (Bid 30th Street- Des No. $400,000.00 by State) 1173064 Bid by State Bridges/ Culverts- Fed Aid Total $8,067,309.00 Indy Access Curb, Quote #4 ADA 2010,&Curb/Gutter/ CW-10-006 Sidewalk & Ramp added 20 TO 30 $498,967.00Sidewalks contract BID locations; now is a bid. Indy Access Curbs, ADA quote #1 2011 SIdewalks & Ramps with curb, sidewalk and CW-11-100 $120,000.00 Related Items in Various ramp repairs place Township holder Curb, sidewalk & ramp Indy Access Curbs, repairs, quote #2, ADA CW-11-101 Sidewalks & Ramps with locations (20). in cen, $123,500.00 Related Items. frank, law, war, wash, & way tnsps Indy Access Curbs, ADA quote #3 2011 SIdewalks & Ramps with CW-11-102 curb, sidewalk & ramp $120,000.00 Related Items in Various repairs. Township Indy Access Curbs, SIdewalks & Ramps with CW-11-103 ADA quote #4 2011 $120,000.00 Related Items in Various Township Indy Access Ramps with CW-11-104 Related Items in Center ADA ramp contract $247,519.00 & Perry Townships ADA ramp contract to Indy Access Ramps with W.= Meridian, to E. = CW-11-105 Related Items in Monon Trail, to N. = $378,218.00 Washington Township 46th St., & to S. = 38th St.
  3. 3. Indy Access Ramps Indy Access Ramps w/Related Items in with related items in CW-11-106 $238,300.00 Center and Perry Center and Perry Townships Townships Indy Access Curbs, Curbs, sidewalks and Sidewalks Ramps and CW-11-107 ramp repairs and $587,281.00 Resurfacing in CEN, resurfacing. PERY & WAR Indy Access Curbs, Indy access curbs, Sidewalks & Ramps in sidewalks, and ramps CW-11-200 with related items in $2,520,572.36 Center, Perry, & Warren Townships Center, Perry, and Warren Townships Indy Access Curbs, Curbs, sidewalks and Sidewalks and Ramps in CW-11-201 ramps; See comments $350,000.00 Various Townships below for locations. (CEG) Indy Access Curbs, Curbs, sidewalks and Sidewalks and Ramps in CW-11-202 ramps. See comments $390,000.00 Various Townships below for locations. (CEG) Curb/Gutter/ Sidewalks Total $5,694,357.36 Downtown brick Downtown brick streetStreets BK-25-026 street/brick sidewalk and brick sidewalk $1,283,900.00 rehabilitation superB rehabilitation Michigan Road from RS-10-054B Kessler Blvd. to 75th Sidewalk trail/drainage $2,662,458.66 Street Pedestrian Trail This contract is for private contractors to assist in repairing potholes an chuckholes in various locations Pothole and Chuckhole RS-11-003 within Marion County. $113,709.75 Repairs This contract covers sectors 2, 3, and 11. This project was previously named MCH- 11-001. This contract is for private contractors to assist in repairing potholes an chuckholes Pothole and Chuckhole in various locations RS-11-004 $97,025.68 Repairs within Marion County. This contract covers sectors 7 and 8. This contract was previously named MCH-11-002. This contract is for private contractors to assist in repairing potholes an chuckholes Pothole and Chuckhole in various locations RS-11-005 $107,937.80 Repairs within Marion County. This contract covers sectors 9 and 10. This contract was previously named MCH-11-003. This contract is for private contractors to assist in repairing potholes an chuckholes in various locations Pothole and Chuckhole RS-11-006 within Marion County. $112,413.68 Repairs This contract covers sectors 4 through 12. This contract was previously named MCH- 11-004 This contract is for private contractors to assist in repairing potholes an chuckholes Pothole and Chuckhole in various locations RS-11-007 $108,291.85 Repairs within Marion County. This contract covers sector 56. This contract was previously named MCH-11-005. This contract is for private contractors to assist in repairing potholes an chuckholes Pothole and Chuckhole in various locations RS-11-008 $108,178.70 Repairs within Marion County. This contract covers sector 1. This contract was previously named MCH-11-006. Resurfacing in Center, Resurfacing in Center, Franklin and Perry RS-11-500 Franklin and Perry Townships (see $2,810,500.00 Townships comments for street listing) Resurfacing in Wayne, Resurfacing in Wayne, Decatur, and Perry RS-11-501 Decatur, and Perry Townships (see $3,625,022.38 Townships comments for street listing)
  4. 4. Resurfacing in Resurfacing in Lawrence Lawrence andRS-11-502 and Washington Washington Townships $3,021,300.51 Townships (see comments for street listing) Resurfacing in Pike Resurfacing in Pike Township (seeRS-11-503 $3,267,890.20 Township comments for street listing) Resurfacing in Pike and Resurfacing in Pike and Washington TownshipsRS-11-504 $2,408,530.06 Washington Townships (see comments for street listing) Resurfacing in Resurfacing in Washington TownshipRS-11-505 $3,643,599.00 Washington Township (See comments for project limits) Resurfacing in Warren Resurfacing in Warren Township (SeeRS-11-506 $269,600.00 Township comments for project limits) Resurfacing in Warren Resurfacing in Warren and Franklin TownshipsRS-11-507 $5,926,400.00 and Franklin Townships (See comments for project limits) Resurfacing in Center Resurfacing in Center Township (SeeRS-11-508 $197,000.00 Township comments for project limits) Resurfacing in Center Resurfacing in Center Township (SeeRS-11-509 $203,000.00 Township comments for project limits) Resurfacing in Center Resurfacing in Center and Wayne TownshipsRS-11-510 $5,083,443.76 and Wayne Townships (See comments for project limits) Resurfacing with Resurfacing in Center, related items in Center, Franklin, Pike and Franklin, Pike andRS-11-511 $3,549,700.00 Washington Townships Washington Townships (CEG) (See Comment section for locations) Resurfacing with Resurfacing in Pike, related items in Pike, Warren, Washington, Warren, WashingtonRS-11-512 $2,926,024.00 and Wayne Townships and Wayne Townships (CEG) (See Comment section for locations) PR-2 Residential Resurfacing in Various Resurfacing; SeeRS-11-513 $5,376,260.00 Townships (CEG) comments below for locations. Resurfacing in Center Resurfacing in Center Township (SeeRS-11-514 $3,379,478.40 Township comments for project limits) Resurfacing in Center, Pike, Lawrence, See comments belowRS-11-515 $5,523,629.41 Washington, and Wayne for locations. Townships Resurfacing and RelatedRS-11-516 Items in Pike and Priority One Parks $486,448.00 Washington Townships Resurfacing in VariousRS-11-517 Mill-n-Fill $1,200,000.00 Townships Resurfacing in VariousRS-11-518 Mill-n-Fill $1,200,000.00 Townships Resurfacing in VariousRS-11-519 Mill-n-Fill $1,200,000.00 Townships Resurfacing in VariousRS-11-520 Mill-n-Fill $1,200,000.00 Townships Resurfacing in VariousRS-11-521 Mill-n-Fill $1,200,000.00 Townships Addition of a 5 striped Broad Ripple Avenue bike lane to BroadST-03-051 Ripple Avenue from the $34,180.00 Bike Lanes Monon Trail to Keystone Avenue Hague Road From 82nd Hague Road addedST-06-055 $900,000.00 Street to 96th Street travel lanes Economic Development Economic DevelopmentST-11-012 $0.00 Assistance 2011 2011 Residential Street construction - AdamsST-19-054 East Village at Avondale St, Avondale Park Dr. $599,922.11 and Dearborn St. construction at Avondale Meadows Indiana Ave. Indiana Ave. from 10th StreetscapeST-24-018 Street to 16th Street $3,459,989.00 Improvements from Streetscape 10th to 16th Streets Life Sciences cooridorST-24-019 Life Sciences Corridor $0.00 placeholder Part of the Central Cenrtral Greens Blvd- greens developmentST-24-020 $1,000,000.00 Construction project at the old Central State Facility.
  5. 5. New Street Light replacement on Monument Circle, Monument Circle Street Market St (between ST-25-076 Capitol Ave and $25,082.50 Lights IPALCO Alabama St) and along Meridian St (between Washington St and Ohio St). Streetscape enhancement ("Gateway") along 10th St btwn Bellefontaine St & Dorman St. 30% 10th Street Superbowl design of streetscape ST-25-078 Legacy Gateway & along 10th St btwn $1,219,738.00 Streetscape Dorman St & Hamilton Ave. Gateway to be built in fall 2011, east section may be built in 2012 pending funding availability. Streetscape Improvements on South Street & Delaware Delaware from McCarty ST-25-176 $1,500,000.00 Street Improvements to Maryland and South Street from Delaware to East Street Streetscape and intersection Fountain Square Phase improvements at ST-32-005 $2,262,167.00 II Virginia Avenue, Shelby Street, and Prospect Street Madison Ave./East St. Gateway South ST-32-006 $104,360.00 South Gateway Initiative Streets Total $73,397,180.45 62nd. from Keystone to Multi use trail linking Allisonville Multi UseStreets-Fed Aid ST-11-015 Allisonville to Glendale $1,515,790.00 Trail (Bid By State) DES Mall- Des. No. 1005704 INS Des # 0901706 - HARMONI neighborhood streetscape and HARMONI Neighborhood pedestrian safety for ST-18-050 Streetscape (Bid by $991,269.00 Meridian Street from State) CN, INS 54th to the Canal Bridge, Westfield Blvd along Alice Carter Park, and Alice Carter Park. Lafayette Road Bike Lafayette Road Bike Lane - 71st Street to ST-24-101 Lane CN, INS (DOE $3,637,471.00 White River Parkway Grant) West Drive Des. No. 9981140 Conversion of viaduct to pedestrian only use. Provides for primary connection between Merrill Street Viaduct Lilly main campus and ST-25-011E Lilly (Bid by State) $1,206,257.28 their expansion. CN/INS Pavement revisions, drainage, lighting, security elements, facade, portions of structural removal Des No. 0902003 Indpl Cultural Trail Cultural Trail ST-25-034E Phase 7 Central (Bid by $5,998,544.00 Streetscape State) CN Washington Street Des No. 0902004 Indpl Cultural Trail Cultural Trail West ST-25-034P Phase 6 West (Bid by $4,300,243.40 segment Blackford State) CN Street Des. No. 0401189 Washington Street Streetscape ST-26-049 Corridor Project Phase 1 Improvements on $1,708,670.00 (Bid by State) Washington Street from Audubon to Emerson Shelby Street and Shelby Street and Madison Avenue Bike Madison Avenue Bike ST-46-081 Lanes - County Line $3,326,333.00 Lanes CN, INS (DOE Grant) Road to Virginia Avenue Emerson Ave, I-65 to Des No.0600364. ST-47-044 Shelbyville Rd. (Bid by Added Travel Lane $10,507,110.00 State) DES, INS, CN Project 21st Street from Dr. Street Rehabilitation - SR-24-001 MLK to Senate Avenue $50,000.00 Des. No.1173047 (Bid by State) Allisonville Road from Road Rehabilitation - ST-05-018 86th Street to 96th $175,500.00 Des xxxxxx Street (Bid by State) 71st.St. Multi-Use Trail Des No. 1172459 ST-12-006 Cricklewood to Hague 10 Multi-Use Trail on $190,360.00 Rd.(Bid by State) 71st Street Des. No. 0810323 McFarland/Des. Edgewood Ave. /Gray 0810324 Gray Rd./McFarland Intersection ST-40-009 improvement. Local $550,000.00 Intersections (Bid by State), DES,INS, CN Funded Inspection. Revise IRTIP Jan. 2010. bid 2012. r/w issues anticipated. xxxxxx xxxxxxxxx xxxxxxxxxx $0.00
  6. 6. Streets-Fed Aid Total $34,157,547.68 Physical Condition Inventory of approximately one third Pavement Management (700 miles) of the Citys Studies ST-00-020 Residential Inventory $0.00 Residential Streets (10 Phase 2 year frequency) - Perry, Warren, and Lawrence townships RebuildIndy Program RebuildIndy Program SY-11-003 $8,000,000.00 Management 2011 Management 2011 Studies Total $8,000,000.00 Burdsal and Harding Actuation for ped, Traffic TS-24-011 Traffic Signal vehicles, bicycle. All $105,300.00 Modernization new equipment. Traffic Total $105,300.00 HSIP project to Castleton Interconnect upgrade the Castleton Traffic- Fed Aid TS-05-008 $638,110.00 System Improvements area interconnect DES# 1173116 Miscellaneous Traffic Des. No. xxxxxx TS-11-008 Signal CMAQ Projects Placeholder for 2011 $0.00 (2011) CN/INS CMAQ Construction HSIP Sign Inventory Traffic Sign Inventory Preparation. (90/10 TS-11-011 $1,000,000.00 for Marion County Split for Construction): Des. # 1172118 Upgrade of Fall Creek Fall Creek Lane Control Lane Control Signs to TS-11-013 LEDs (Central to $165,080.00 Upgrade Evanston) 100% Funded by DOE Grant Miscellaneous Traffic TS-11-014 HSIP Projects to be bid Placeholder for HSIP $0.00 in 2011 Miscellaneous Federal TS-11-015 Aid Traffic Projects to be Placeholder for 2011 $0.00 bid in 2011 HSIP Project to begin installing Push Button Pedestrian Push Button Crossings at areas TS-18-010 located within Safe $114,224.00 Crossings Routes to School Areas DES# 1173168 Des No. 1005259 Andrew J. Brown, Traffic System Commerce Signal Improvements LOCAL TS-24-006 $452,344.57 System (Bid by State) FUNDED INSPECTION; CN, INS INDOT Contract #T- 33632. HSIP Project to repair Downtown Signal portions of the TS-25-011 downtown signal $0.00 Interconnect Repair interconnect DES # 1173112 HSIP Project to replace Indianapolis Panel Sign outdated Panel Signs at TS-25-012 $25,000.00 Replacement various locations DES #1173113 HSIP Projet to install New Pedestrian New Pedestrian Cossings on the Monon TS-25-013 $25,300.00 Crossings Trail and on Ohio Street DES# 1173167 INDOT HSIP intersection improvements (90/10 funding) Des. No. 1172120 - intersections listed below in Various Intersection comments. TS-34-087 Signal Improvements in $1,027,800.00 Marion County INDOT HSIP procurement of countdown ped heads (90/10 funding) Des. No. 1172119 - DPW ops will install heads in CBD Traffic- Fed Aid Total $3,447,858.572011 Total $ 161,764,106 Northbrook Drive over Northbrook Drive over Howard Johnson Ditch 2012 Bridges/ Culverts 1 BM-03-001 Howard Johnson Ditch $496,700.00 Superstructure (0313L) Replacement Lakeside Drive over 2 BM-08-017 birdge deck overlay $344,709.00 Bushs Run (0804L) 42nd Street over 42nd Street over 3 BM-17-005 Crooked Creek Bridge Crooked Creek Bridge $181,859.00 Deck Overlay (1718L) Deck Overlay (1718L) Ritter Avenue over Ritter Ave. over Devon Devon Creek 4 BM-19-079 $419,204.00 Creek (1914L) Superstructure Replacement 30th Street over 30th Street over Pogues 5 BM-19-080 Pogues Run Bridge $653,900.00 Run (1908F) Deck Overlay 10th Street over White 10th Street over White Lick Creek (2203F) 0.12 6 BM-22-052 Lick Creek Bridge Deck $646,866.00 M west of Country Club Bridge Construction in Overlay. $6,809,384.34 Rd Jeopardy Bridge Beautification CSX Bridges over for CSX Bridges over 7 BM-25-014 Delaware and South $0.00 Delaware and South Streets Streets
  7. 7. Bridge Construction in $6,809,384.34 Jeopardy Bridge rehabilitation - Kitley Avenue over Lick superstructure 8 BM-34-001 $857,797.40 Creek (3403L) replacement and widening Prospect Road over Bridge Rehabilitation - 9 BM-35-015 Grassy Creek (3508F) Deck Replacement and $1,105,858.00 CBG bridge widening. Southport Road over Southport Road over 10 BM-46-086 Little Buck Creek Little Buck Creek Bridge $956,066.00 (4601F) Rehab (4601F) Linden Street over 11 BR-32-131A Bridge Replacement $840,700.00 Pleasant Run (3213F) Mendenhall Road over Mendenhall Road 12 BR-43-001 $305,724.94 Goose Creek (4306L) Bridge Replacement Pentecost Road 1 CL-42-021 (10200E) Culvert Culvert replacement $220,000.00 Replacement Hayworth Road (7946S) 2 CL-44-001 Culvert replacement $360,000.00 Culvert Replacement Culvert Construction In $1,640,000.00 Hayworth Road (8130S) Jeopardy 3 CL-44-002 Culvert replacement $340,000.00 Culvert Replacement Franklin Road (7860S) 4 CL-48-009 Culvert replacement $420,000.00 Culvert Replacement Carroll Road (6400N) 5 CL-51-003 Culvert replacement $300,000.00 Culvert Replacement Keystone Avenue over Deck Replacement for 1 BM-04-003 86th Street (0407F and both North and South $200,000.00 0408F) bound bridges Lyons Avenue over Lyons Avenue over State 2 BM-30-068 State Ditch Bridge Deck $30,000.00 Ditch (3007L) Overlay Keystone Avenue over Keystone Avenue over Pleasant Run 3 BM-32-129 $200,000.00 Pleasant Run (3205F) Superstructure Replacement Sloan Avenue over Sloan Avenue over Bean 4 BM-33-073 Bean Creek Bridge $33,803.00 Creek (3316L) Deck Overlay Moore Road over Sheets 5 BR-01-020 Bridge Replacement $92,843.00 Creek Bridge Designs in Evanston Avenue over $794,045.50 6 BR-11-094 Bridge Replacement $64,516.50 Jeopardy Bailey Creek (1113L) Bolton Avenue over Bolton Avenue over Pleasant Run Bridge 7 BR-26-055 Removal and $29,523.00 Pleasant Run (2611L) Pedestrian Bridge Construction Barth Avenue over Barth Avenue over Pleasant Run Bridge 8 BR-32-132 Removal and $30,360.00 Pleasant Run (3228L) Replacemnt with a Pedestrian Structure. Southport Road over 9 BR-47-043 Bridge Replacement $80,000.00 Bunker Knapp Road over Flat 10 BR-48-005 Bridge Replacement $33,000.00 Branch (4801L) Bridges/ Culverts Total $9,243,429.84 Illinois Street over Fall Federal Aid BridgeBridges/ Culverts- Bridge Rehabilitation - 1 BM-25-175 Creek (Bid by State) CN, $2,650,000.00 Construction inFed Aid Des No. xxxxxxx INS Jeopardy Lafayette Road over Lafayette Road over CSX CSX - 0.45 Miles NW of 2 BR-16-073 (STR. No. 1615F) (Bid 30th Street- Des No. $4,780,000.00 by State) 1173064 Bid by State Moller Road over Dry Moller Road over Dry Run Creek 3 BM-16-070 Run Creek (1609F) - Superstructure $870,000.00 Local Match = $ 2,538,644.44 (Bid by State) Replacement - Desxxxxxxx Sherman Drive over Superstructure 4 BM-26-065 Pleasant Run (Bid by replacement - Des $840,000.00 Federal Match = $ 8,113,200.00 State) XXXXXX College Avenue over Bridge Replacement 5 BR-04-001 Williams Creek (Bid By $1,511,844.44 Total = $10,651,844.44 Bridge No. B-0401F State) Bridges/ Culverts- Fed Aid Total $10,651,844.44 Indy Access Curb,Curb/Gutter/ ADA Quotes and Ramp 1 CW-12-001 Sidewalk and Ramps $2,000,000.00Sidewalks only contracts 2012 Indy Access Curbs, Curbs, sidewalks and Curb & Gutter & Sidewalks and Ramps in 2 CW-11-201 ramps; See comments $4,150,000.00 Various Townships Sidewalk Construction $10,700,000.00 below for locations. (CEG) in Jeopardy Indy Access Curbs, Curbs, sidewalks and Sidewalks and Ramps in 3 CW-11-202 ramps. See comments $4,550,000.00 Various Townships below for locations. (CEG) Curb/Gutter/ Sidewalks Total $10,700,000.00 Placeholder for alley Alley Construction inStreets 1 AL-12-001 2012 Alley Program $500,000.00 $500,000.00 program Jeopardy Monument Circle/Market Monument Circle Brick Maintenance of Circle 1 BK-25-022 Street Brick Paver $90,000.00 $90,000.00 Repair in Jeopardy Repair 2012 (Quote) Resurfacing in Various Placeholder for 2012; 1 1 RS-12-601 $5,000,000.00 Townships of 10; Locations: TBD Resurfacing in Various Placeholder for 2012; 2 2 RS-12-602 $5,000,000.00 Townships of 10; Locations: TBD Resurfacing in Various Placeholder for 2012; 3 3 RS-12-603 $5,000,000.00 Townships of 10; Locations: TBD Resurfacing in Warren Resurfacing Project Resurfacing in Warren Township (See construction in $28,130,000.00 4 RS-11-506 $4,460,000.00 Township comments for project Jeopardy limits)
  8. 8. Resurfacing Project construction in $28,130,000.00 Jeopardy Resurfacing in Center Resurfacing in Center Township (See 5 RS-11-508 $3,920,000.00 Township comments for project limits) Resurfacing in Center Resurfacing in Center Township (See 6 RS-11-509 $4,750,000.00 Township comments for project limits) Bicycle lane project Bike Lane Project 1 ST-09-030 71st Street Bike Lanes from Marsh Road to the $2,956,900.00 construction in $2,956,900.00 Monon Trail Jeopardy Economic Development Economic Development 1 ST-12-003 $500,000.00 Assistance 2012 Assistance 2012 2 Fall Creek Greenway Greenways $1,000,000.00 W. 10th Street from 3 Roadway Relocation $1,000,000.00 Main to Holt Road Southeastern from 4 Franklin Road to 9100 Streetscape $1,000,000.00 East Lafayette Road Transit Multi-modal transit 5 $500,000.00 Stop facility Minnesota Street from 6 Roadway Relocation $1,200,000.00 High School to I-465 Economic Development Madison Ave./East St. Gateway South Construction Projects $15,401,640.00 7 ST-32-006 $715,640.00 South Gateway Initiative in Jeopardy Placeholder for East East Washington Washington 8 ST-26-010 Neighborhood $4,000,000.00 Neighborhood Improvements Improvements Life Sciences cooridor 9 ST-24-019 Life Sciences Corridor $1,986,000.00 placeholder Streetscape Improvements on South Street & Delaware Delaware from McCarty 10 ST-25-176 $3,500,000.00 Street Improvements to Maryland and South Street from Delaware to East Street County Line Road and Intersection Railroad Road 1 ST-45-008 improvement and new $2,019,900.00 Intersection traffic signal. Improvement Hague Road From 82nd Hague Road added 2 ST-06-055 $2,100,000.00 Intersection / Corridor Street to 96th Street travel lanes Construction Projects $8,940,900.00 Intersection in Jeopardy improvement for 42nd German Church & German Church, 46th 3 TS-21-002 Intersection $4,821,000.00 & German Church and Improvements 52nd & German Chruch Rd Streets Total $61,621,384.00 Des# 1006361 - Immaculate Heart/Center for Inquiry for sidewalks, Safe Routes to School - crosswalks, ADAStreets-Fed Aid 1 CW-11-150 Immaculate compliance, & bicycle $250,000.00 Heart/Center for Inquiry infrastructure for increased pedestrian safety on 57th Street from Meridian Street to Guilford. Des# XXXXXXX - Sidewalks, crosswalks, ADA compliance, and Safe Routes to School - 2 CW-11-151 bicycle infrastructure $250,000.00 Place Holder for increased These are not in pedestrian/student Jeopardy. 100% $1,000,000.00 safety on XX Street. federally funded Des# XXXXXXX - Sidewalks, crosswalks, ADA compliance, and Safe Routes to School - 3 CW-11-152 bicycle infrastructure $250,000.00 Place Holder for increased pedestrian/student safety on XX Street. Des# XXXXXXX - Sidewalks, crosswalks, ADA compliance, and Safe Routes to School - 4 CW-11-153 bicycle infrastructure $250,000.00 Place Holder for increased pedestrian/student safety on XX Street. 21st Street from Dr. Street Rehabilitation - 1 SR-24-001 MLK to Senate Avenue $484,000.00 Des. No.1173047 (Bid by State) Allisonville Road from Road Rehabilitation - 2 ST-05-018 86th Street to 96th $1,774,500.00 Des xxxxxx Street (Bid by State) Des # 1006591 Federal Sidewalks along Earmark money for Michigan Rd, Westlane Sidewalks and ADA 3 ST-10-031 ramps in Crooked $553,681.00 Rd (Bid by State) CN/INS Creek neighborhood - 90/10 match on $500,000.00 Des # 0900030 - Curb, Crooked Creek sidewalk, and ADA 4 ST-10-045 Sidewalks & ADA (Bid by $490,000.00 ramp connections to State) CN, INS transit bus shelters 71st.St. Multi-Use Trail Des No. 1172459 5 ST-12-006 Cricklewood to Hague 10 Multi-Use Trail on $1,710,800.00 Rd.(Bid by State) 71st Street

×