Your SlideShare is downloading. ×

InTechnology Reading Data Centre

530

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
530
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. reading daTa CenTre /550 RACK CAPACITY /UP TO 8KW PER RACK /3MW POWER AVAILABLE /24-365 MANNED SECURITY /HANDS & EYES SUPPORT /PCI & ISO COMPLIANT /CARRIER NEUTRAL /FREE PARKING /CHALLENGE US /
  • 2. READING DATA CENTRE AT A GLANCE /NEW NEXT GENERATION DATA CENTRE: READING /InTechnology has always invested in leading edge technology and facilities. As one of the UK’s leading ManagedService Providers, we hold a firm commitment to best-in-class innovation, and we’ve now added a nextgeneration, industry leading data centre facility to our portfolio.It’s just one element of our high availability, highly resilient core network and forms part of our multi-millionpound rolling investment programme. As an energy efficient hosting facility, it represents an exciting opportunityfor customers looking to save money quickly and build agility over the long-term.OUR NEXT GENERATION DATA CENTRE PROPOSITION / AVAILABLE Q1 DATA CENTRE SPEC: Secure facility with best-of-breed, energy efficient technology. 2012 ADDRESS: Commensus House, Worton Drive, Reading, RG2 OTG. LOCATION: M4 Junction 11 (1 mile), London Heathrow Airport (30 miles), Central London (40 miles), Gatwick Airport (65 miles). PARKING: Free on-site parking available.
  • 3. POWER FIRE PROTECTIONUp to 3MW of power will be available, with between 1.5 and 8KW per cabinet. The site will have an inert gas fire suppression system, in addition to aThe facility will also have N+1 backup generation, with an N+N UPS system. network-monitored fire detection system to enable proactive prevention.COOLING CONNECTIVITYAn ultra efficient ‘Free Air’ cooling system, including cold aisle Our Reading data centre will be embedded within InTechnology’s highlycontainment, will reduce cooling costs and environmental impact. resillient national network, with additional connectivity available to and from all other major network providers.SECURITYSecurity guards will man the Reading facility 24/365, while CCTV will CERTIFICATIONmonitor our data centre from the site itself, and also in our Harrogate HQ. The data centre will be engineered for concurrent maintenance, withinPhoto ID and access cards will be required as part of a ‘single person’ Tier 3 guidelines. From Q1 2012, the facility will be ISO and PCI compliant.entry system, while an intruder alarm will be fitted for full reassurance. InTechnology will offer a 100% power availability guarantee, made possible through our strategic design and extensive infrastructure investment. Up to 8KW of power will always be available per cabinet via redundant feeds. CHALLENGE US / Data centre hosting is just one of the value-adding propositions within our managed services portfolio. To learn more about how our new facility could help you cut cost, build agility and increase productivity put us to the test and ask for a FREE Spend & Strategy Review. Call: 0800 983 2522MIKE HEAPS / email: challenge@intechnology.comDIVISIONAL DIRECTOR /DATA CENTRES / Visit: www.intechnology.com
  • 4. InTechnology Head Office InTechnology Reading InTechnology LondonCentral House Commensus House 17 St. Helen’s PlaceBeckwith Knowle 3 – 5 Worton drive BishopsgateHarrogate reading LondonHg3 1Ug rg2 0Tg eC3a 6dgTel: +44 (0)1423 850 000 Tel: +44 (0)870 777 7778 Tel: +44 (0)20 30 40 50 00Fax: +44 (0)1423 850 001 Fax: +44 (0)870 777 7779 Fax: +44 (0)20 30 40 50 01challenge@intechnology.com challenge@intechnology.com challenge@intechnology.comwww.intechnology.com www.intechnology.com www.intechnology.com N DR WORTO READING DATA B3033 CENTRE WOR TON WO RT DR A33 AY ON IAL W How to find us: IMPER DR exit the M4 at Junction 11. AY Take the a33 towards reading. W AL RI PE IM 33 B30 Follow the a33 for a quarter of a mile, turning A33 right at the roundabout signposted Worton grange Business Park onto imperial Way. Follow imperial Way and take 1st left onto M4 Worton drive. A33 inTechnology data centre is approximately B3270 half a mile along the road, on the right, opposite Static Control Components Ltd. M4 SATNAV ref: A33 rg2 0Tg Network Data Data Unified Calls Instant IP Telephony Management Centres Comms & Lines Comms

×