• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
P6 r8
 

P6 r8

on

  • 6,531 views

 

Statistics

Views

Total Views
6,531
Views on SlideShare
5,432
Embed Views
1,099

Actions

Likes
1
Downloads
317
Comments
1

7 Embeds 1,099

http://p6analytics.com 658
http://projectsanalytics.com 399
http://www.projectsanalytics.com 25
http://translate.googleusercontent.com 10
http://www.748inc.com 5
http://wildfire.gigya.com 1
http://projectsanalytics.web12.hubspot.com 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel

11 of 1 previous next

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • Good presentation
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Dick and I were recently at starefarm and Motorola When they learned of the planned capabilities in R8,spoecaully the web based deployability.. they decided they were going to skip v7 and move stratignt to r8. With an increased ease of use and more web based capabilities, they feel more comfortable pushing P6 out to a larger community. They feel the web-based solution can scale without needing more back end support and end user help.
  • Protoype flow for initiationSwimlanes for roles
  • It provides a central location for indentifying, assessing, and managing risks (threats and opportunities) for a single project, multiple projects or a portfolio
  • The new schedule checker is a tool that assists planners, project managers and the PMO to ensure project plans are built within the guidelines of industry and organizational best practices. The schedule checker performs a 14-point analysis to ensure that activities and dependencies of the project schedule are following desired standards. The schedule checker adheres to the DCMA 14-point assessment check and produces a report that list all opportunities for corrective action or improvement when aspects of the project schedule fall outside the quality guidelines. The report includes a summary and detailed sections displaying activities falling outside your configured thresholds.
  • When they ask us how we better fit into the enterprise architecture and want more details, start with these discussion points.
  • FindGrouping inheritColumns for ModulesFill downModule access
  • Enterprise Manager 11gHP Itanium as Server platformPossible Apple Mac Support
  • Enterprise Manager 11gHP Itanium as Server platformPossible Apple Mac Support

P6 r8 P6 r8 Presentation Transcript

  • Oracle's Primavera P6 Road Map Yasser MahmudSenior Director, Product StrategyOracle Primavera Global Business UnitAugust 16, 2010
    The most comprehensive Oracle applications & technology content under one roof
  • The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decision. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
    2
    Safe Harbor Statement
    © 2010 Oracle Corporation
  • Oracle Primavera P6 Transformation
    P6 as a Platform:
    Complete EPPM for the Extended Enterprise
    Enterprise Governance: Workflow and ERP Integrations
    Expand Best in Class PPM Solution to Enterprise:
    Role based, Web based
    Best in Class
    Project and Program Management
    Best in Class
    Scheduling
    Time
    *Timeframes are subject to change at any time and not a commitment to deliver.
  • P6 R8
  • Governance
  • Governance
    Oracle confidential internal only
    • Oracle BPM 11g R1
    • Business Process Management
    • Released April 2010
    • Business friendly BPM experience
    • Unifies latest SOA & process modeling technologies
    • Rich, visual design environment for forms
    • Web 2.0 collaborative capabilities for process tasks
    • Replaces current workflow engine
    • Interwoven (6.1)
    • JBPM (6.2, 70)
    Oracle confidential internal only
    The newengine for Primavera P6 Workflow
  • Oracle confidential internal only
    Planned Enhancements: Process Composer
    Business Users can modify workflow templates
  • Planned Enhancements: BPM studio
    IT users model & execute processes in visual, integrated development interface
  • Oracle confidential internal only
    Planned Enhancements: Rich Form Support
    Rich form design & formatting
  • © 2010 Oracle Corporation
    Planned Enhancements: BPM Workspaces in P6
    Participants can fully manage their processes in P6.
  • Replaces Methodology Manager
    Added Templates to P6 PMDB
    Single point of administration within P6
    Security
    Users, Profiles, OBS
    Admin Preferences
    Admin Categories
    User Preferences
    Templates and projects share common dictionaries
    Roles
    Resources
    Resource Codes, Project Codes, Activity Codes
    UDFs
    Activity Step Templates
    Resource Curves
    Currencies
    Cost Accounts
    Oracle confidential internal only
    Planned Enhancements: Project Templates
  • Oracle confidential internal only
    Planned Enhancements: Creating Templates
    Templates reside within EPS nodes
    Save existing project as template
  • Oracle confidential internal only
    Planned Enhancements: Creating Templates
    Select which data from project to copy to template
  • Oracle confidential internal only
    Planned Enhancements: Managing Templates
    Manage template content in same familiar, interface as projects
    Establish savable, sharable Views for templates
    Callout Text Here
    Callout Text Here
    Callout Text Here
    Callout Text Here
    Complete project structure saved to template (WBS, activities, steps, assignments, expenses etc)
  • Oracle confidential internal only
    Planned Enhancements: Managing Templates
    Templates have Project Status of “Template”
    Templates won’t appear in project portfolio views/reports
    Resource & role usage on templates is hidden from analysis views
    (Templates not Summarized)
  • Oracle confidential internal only
    Planned Enhancements: Managing Templates
    Callout Text Here
    Callout Text Here
    Callout Text Here
    Callout Text Here
    All project default & settings can be
    pre-defined in templates
  • © 2010 Oracle Corporation
    Planned Enhancements: Templates
    Templates streamline scope additions to
    in-flight projects
  • Provide Oracle BI Publisher with P6 for web based reporting
    Bundled at no extra cost
    Access reports through P6 Web
    View list of reports, Run reports on demand
    Report format options
    Tabular, Graphical, MS Word, PDF, Excel
    Automated delivery / notification
    Pre-defined user access list & controls
    Enable users to subscribe to available reports
    Email reports, send to printer, save to repository, FAX
    © 2010 Oracle Corporation
    Planned Enhancements: Enterprise Reporting
  • P6 ODS
    © 2010 Oracle Corporation
    BI Publisher provides robust reporting architecture
  • Planned Enhancements: Enterprise Reporting
    Report section within P6 to view, run and schedule reports
    Publish reports in multiple formats
    Multiple delivery methods
  • © 2010 Oracle Corporation
    Planned Enhancements: Enterprise Reporting
    Report Scheduling
    Ability to pass parameters
    Secure
  • Predictability
  • Predictability
    Oracle confidential internal only
  • Multiple response plans per risk
    © 2010 Oracle Corporation
    Planned Enhancements: Risk Register
    Risk register moves risk management out of Excel and into the system of record
  • © 2009 Oracle Corporation
    Planned Enhancements: Risks for Multiple projects
    Manage risks across multiple projects
  • © 2010 Oracle Corporation
    Planned Enhancements: Risk Scoring Matrix
    Scoring matrix delivers framework for evaluating overall risk exposure
  • Planned Enhancements: Activity View Risk Details
    Oracle confidential internal only
    Assign, edit or create risks without leaving the activity view
  • Planned Enhancements: Integrated Risk Management
    Improved integration with Primavera Risk Analysis
    All qualitative risk management in P6  imported into PRA for quantitative assessment.
    No need to maintain separate risk registers.
    On import into PRA, the project risk register including the linked activities, active response plans, and risk scoring matrix will be included.
    Additional capabilities
    Custom risk categories
    Copy and paste risks
    Export to Excel
    Oracle confidential internal only
  • Planned Enhancements: Schedule Checker
    Oracle confidential internal only
    Schedule check’s 14 point assessment with configurable thresholds
    Schedule check report
  • Automatic schedule calculations enable you to conduct quick impact analysis
    Oracle confidential internal only
    Planned Enhancements: Schedule Preview
    Turn on automatic scheduler to do quick, what-if analysis.
  • Inclusivity
  • Inclusivity
    Oracle confidential internal only
  • © 2010 Oracle Corporation
    Planned Enhancements: EPS View
    Strategic view of all projects including a timeline
  • © 2010 Oracle Corporation
    Planned Enhancements: EPS View
    Group by multiple hierarchical fields
  • © 2010 Oracle Corporation
    Planned Enhancements: Resource Assignment View
    Plan & Analyze work by departments, skills and individual resources
    Resource managers can personalize view for their team.
  • Planned Enhancements: Resource Assignment View
    Quickly view calendar used to schedule each assignment
    Neck bars based on calendars non-work time
  • © 2010 Oracle Corporation
    Planned Enhancements: Resource Assignment View
    Evaluate resource performance and accurately forecast resource demand
  • © 2010 Oracle Corporation
    Planned Enhancements: Portfolio Filtering
    Define up to 10 levels of filter criteria
    Automatic refresh of filtered portfolios
  • © 2010 Oracle Corporation
    Planned Enhancements: Robust Activity Filtering
    Unlimited, nested criteria
    Shared filters
    Apply to previewchanges
  • © 2010 Oracle Corporation
    Planned Enhancements: ImprovedUsability
    Type ahead search in columns
    Configurable toolbars
  • © 2010 Oracle Corporation
    Planned Enhancements: ImprovedUsability
    Email Views to other users
    Issues added from directly within Activities view
  • Planned Enhancements: Personal Calendars
    Maintain Personal calendar in P6 Web
  • Planned Enhancements: Services on web
    • Scheduling of all jobs
    • Faster Scheduler
    • Leveling
    • Apply Actuals
    • Summarize
    • Recalculate Assignment Costs
    • Store Period Performance
    © 2010 Oracle Corporation
  • © 2010 Oracle Corporation
    Planned Enhancements: Enterprise Administration
    Enterprise data is centrally managed for effective administration
  • © 2010 Oracle Corporation
    Planned Enhancements: User Admin & Access
    Copy/paste users
    Export to Excel
  • © 2010 Oracle Corporation
    Planned Enhancements: Web Calendars
    Easy to use, 100% web administration
     
  • P6 R8 Windows Client Improvements
    Time Scaled Logic Diagram
    Split screen views
    Customizable toolbars
    Page breaks on grouping bands
    Line numbers on printed layouts and reports
    Easier installation
    No requirement for administrator privileges
    Easy to push installs to large set of desktops
    © 2010 Oracle Corporation
    Other Planned Enhancements:
  • Planned Enhancements: Time Scaled Logic Diagram
    TimeScaled Logic Diagrams improve schedule analysis
  • Planned Enhancements: Split Screens
    Single-screen management for planners
    © 2010 Oracle Corporation
  • © 2010 Oracle Corporation
    Planned Enhancements: Customizable toolbars
    Personalization of toolbars increase productivity and adoption
  • Value Optimization
  • Value Optimization
    Oracle confidential internal only
  • Value Optimization
    Oracle confidential internal only
  • Q/A
    Oracle confidential internal only