Your SlideShare is downloading. ×
0
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Open data centers corp intro feb 2013
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Open data centers corp intro feb 2013

336

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
336
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Welcome
  • 2. About The Facility•  Located 16 miles south of New York City•  8,000 square feet of usable raised floor•  24x7 Network Operations Center (NOC)•  Fully-redundant electrical and mechanical systems
  • 3. ODC’s PhilosophyODC takes possession of single-tenantdata centers, modernizes them, andconverts them to carrier neutral,commercial colocation facilities.
  • 4. Electrical Systems•  Dual feeds from the utility off of separate power grids•  Dual Caterpillar generators•  Redundant ATS providing true A/B power.•  Two internally redundant UPS systems feed 8 PDUs
  • 5. Generators and UPS systems
  • 6. Mechanical Systems• 100 watts/square feet capacity• Dual Glycol Loops on Separate Sources• Redundant Dry Coolers• N+1 HVAC Systems
  • 7. Pumps, HVAC units, and dry coolers
  • 8. Pre-Renovation Condition of the Facility
  • 9. Renovation of the FacilityCable Remediation Batteries being staged
  • 10. Final Piles of Copper and Fiber (1.5 tons of copper!)
  • 11. Floor tiles being staged and installed New floor
  • 12. Floor tiles being staged and installed New floor
  • 13. Customers Moving InBuilding the Meet-Me Room
  • 14. Introducing Open Data Centers’ 15 Corporate Place South!
  • 15. www.opendatacenters.netEmail: odc@imillerpr.com

×