Deerns - Towards Future Proof Data Centers

  • 762 views
Uploaded on

Innovative design of new & operational (hot) upgrades of existing data centers. Deerns\' engineers help operators maximize energy efficiency, assure uninterrupted availability, mitigate risk, …

Innovative design of new & operational (hot) upgrades of existing data centers. Deerns\' engineers help operators maximize energy efficiency, assure uninterrupted availability, mitigate risk, support diverse configurations and ensures the scalability of your facility(s).

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
762
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Towards Future ProofData CentersDeerns Data Center ConsultancyInfrastructure Green & Upgrade Scan Services August 2011
  • 2. Deerns consulting engineersDeerns Consulting Engineers Multidisciplinary engineering company: Energy & Sustainability, MEP, Building Science, Master planning, R&D Founded in 1928 Over 500 employees worldwide: Netherlands, UK, Germany, France,Spain, USA, UAE, China Over $65 million revenue International client base Specialized in energy efficient design of critical operational facilities like: o Airports o Data Centers o Hospitals o Level 4 bio hazard labs and Clean Rooms
  • 3. Deerns’ Proven references last 5 yearsTotal White Space Area: > 2,300,000 ft2 world wideTotal IT power: > 670 MWExperience: > 500 man-years of datacenter working experience Total White Space Area: > 100,000 m2Personnel: > 60 datacenter M&E > 350 MWand consultants Total IT power: specialist
  • 4. What We Do…Innovative design of new & operational(hot) upgrades of existing data centers to: Maximize Energy Efficiency Assure Uninterrupted Availability Mitigate Risk (Tier levels 1, 2, 3, 4) Support diverse configurations (racks, suites, cages, containers, “special projects”) Ensure scalability of facility
  • 5. Service Offerings Overall datacenter design Green Scan (Energy Efficiency) High level design and specification, SLA development Single Point of Failure (SPOF)/Availability analysis Site selections Risk assessments Innovative Cooling Solution development Tier Level audits Facility construction liaison & management (PM)Working in partnership with our customersto ensure tangible results
  • 6. Services for New Data Centers
  • 7. What we deliver…bottom line: Highest ROI Total Investment: 10% Optimized Phased Cooling Energy Costs: 80% Investment Total Energy Costs: 30%Short Ramp-Up-Time Reduced OPEX Minimum RiskGreenest Data Center Optimized Proven Technologies Short Phased Scalable Growth Supports Highest Levels of Redundancy & Survivability Implementable Anywhere in the World Average PUE as low as 1.12
  • 8. Green Cooling for Data Centers© 80 % Reduction of Cooling Energy Save $ 1,750,000 p.a. on 25,000 sq.ft. Data Center (5 MW)Highly Adaptable Phased Investment GC-DC© Standardized Proven TechnologySustainability through enhanced Data Center Value Proposition
  • 9. GC-DC© Free Cooling Cell: How it Works
  • 10. Case study ROI for the GC-DC© 25,000 ft2, 200W/ft2 DX CRAC GC-DC© TIER IIIInvestment $ 33,750,000 $ 30,500,000DC IT Power 5 MW 5 MWCooling Power (% IT Power) 50% 10%Average per year 2.5 MW 0.5 MWCooling Energy Consumption per 21.9 GWh 4.4 GWhYear $100K/GWh $100K/GWhCooling Energy Costs $ 2,190,000 $ 440,000 $ 1,750,000 /annumSaving per year 80 %
  • 11. Contact Deerns Consulting Engineers3455 Ringsby Court 155 Gibbs StreetSuite 104 Suite 552Denver, CO Rockville, MD www.deernsamerica.com info@deernsamerica.com