Your SlideShare is downloading. ×
Lean product development implementation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Lean product development implementation

1,141
views

Published on

Simple tools how to implement lean product development

Simple tools how to implement lean product development

Published in: Business, Technology

1 Comment
1 Like
Statistics
Notes
No Downloads
Views
Total Views
1,141
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
81
Comments
1
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. LEAN Product Development Implementation Itzhak Ben-Levy - LEAN Expert itzhak@benlevy.co.il www.benlevy.co.il August 2012Itzhak Ben-Levy LEAN Expert © 1
  • 2. The Traditional way It is Too many parts expensive Nobody gave me The target cost I cant assemble it The requirements were changedItzhak Ben-Levy LEAN Expert © 2
  • 3. The Development Problems • Long development cycle times • Many redevelopment cycles • High development costs • Long production cycle times • High production costsItzhak Ben-Levy LEAN Expert © 3
  • 4. LEANLEAN Manufacturing LEAN Product DevelopmentItzhak Ben-Levy LEAN Expert © 4
  • 5. The main Principles Of Lean Product Development • Establish customer-defined value • Front-load the product development process • Create a level product development information flow • Organize to balance functional expertise and cross-functional integration • Align your project through simple visual communicationItzhak Ben-Levy LEAN Expert © 5
  • 6. LPD workshopItzhak Ben-Levy LEAN Expert © 6
  • 7. Outcome of LPD workshop Reducing development production lead time and cost by: • Templates for capturing new data and information • A focus on value creating activities • New insights into the development process • Real time reallocation and synchronization of activities • Team identity and emotional commitment • Common language among team members • To do list identifying new corrective actionsItzhak Ben-Levy LEAN Expert © 7
  • 8. Itzhak Ben-Levy LEAN Expert © 8
  • 9. Value to the customer • Solving customer Problems • Exploiting Opportunities • The product should Look good • The Customer should Feel good 9Itzhak Ben-Levy LEAN Expert © 9
  • 10. QFD shorten cycle time by: 1. Understanding value to the customer 2. Exploiting customer needs 3. Deriving and consolidation of the requirements from customer needs 4. Prioritizing requirements 5. Allocating requirements to the project team 10Itzhak Ben-Levy LEAN Expert © 10
  • 11. NPI - New Product Introduction IPT METHODOLOGIES (Integrated Product IPT Leader - Project Manager Team)  System Engineering QFD  Logistics REUSE  Production Engineering DFMA  Contracting PROCESS MAPPING  Customer PHASE DTC  Strategic Suppliers  Finance MAKE-BUY GATE  Planning RISKS MITIGATION  Customer Service ARO Design Readiness DRR MANAGEMENT PLAN RISKS  PRODUCTION & SPEC REQUIREMENTS  CONFIGURATION DEVELOPMENT POLICY TECHNOLOGIES DEVELOPMENT  PROTOTYPE  PROGRAM  PURCHASING  PERFORMANCE  MATERIAL RESOURCES  TIME TABLES  ARCHITECTURE  ENVIRONMENT  COMPONENTS  MANPOWER  ORGANIZATION CHART  REUSE  INFRASTRUCTURE BUDGET PLAN   TESTS  MAKE-BUY TARGET COSTS  CUSTOMER  QUALITY  ILS  SUB CONTRACTORS  DEVELOPMENT REQUIREMENTS  PRODUCTION  CUSTOMER DELIVERIES  MAINTAINABILITY  LCC  PRODUCT TESTS OUTPUTS  DEVELOPMENT TOOLSItzhak Ben-Levy LEAN Expert © 11
  • 12. LPD Gates 1. SRR – SYSTEM REQUIREMENT REVIEW 2. DRR – DESIGN READINESS REVIEW 3. PDR – PELIMINARY DESIGN REVIEW. 4. CDR –CRITICAL DESIGN REVIEW. 5. TRR– TESTS READINESS REVIEW 6. TRDR– TEST RESULT DESIGN REVIEW 7. PRR– PRODUCTION READINESS REVIEW 8. FAI – FIRST ARTICLE INSPECTIONItzhak Ben-Levy LEAN Expert © 12
  • 13. DTC PRICE - PROFIT = COST Determined by the competitors Determined Determined by the to the project corporate managerItzhak Ben-Levy LEAN Expert © 13
  • 14. How the engineer now how ?to design Sub contracting riveting casting welding forging machining The cost target determined itItzhak Ben-Levy LEAN Expert © 14
  • 15. Reduce requirements And cost Requirements (QFD) challenge Accept all Important Consider to delete Not delete Implementation important Cost High (DTC) LowItzhak Ben-Levy LEAN Expert © 15
  • 16. Suppliers costs reduction Supplier Engineering Costs drivers Requirements PrioritiesCost Reduction Requirements ReductionItzhak Ben-Levy LEAN Expert © 16

×