Menarid: Behvard Underground Dams
Upcoming SlideShare
Loading in...5
×
 

Menarid: Behvard Underground Dams

on

  • 126 views

 

Statistics

Views

Total Views
126
Views on SlideShare
126
Embed Views
0

Actions

Likes
0
Downloads
1
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Menarid: Behvard Underground Dams Menarid: Behvard Underground Dams Presentation Transcript

  • SPEED GROUNDWATER STORY – MENARID Projects Your Name: Ardeshir Sayah- Acting NPM in MENARID project I.R.Iran Title of your story: Behvard Underground dam Answer 1: Final Workshop for GEF MENARID Projects “Scaling-up Integrated Natural Resource Management, furthering knowledge on groundwater resources management and strengthening Monitoring and Evaluation systems” 16 - 18 June 2014 Beirut, Lebanon • Iran – Iran average annual raining: 240 mm – Iran average annual evaporation: 800 mm – 17 billion cubic meter raining – 10.2 BCM evaporation  6 BCM is usable
  • SPEED GROUNDWATER STORY – MENARID Projects Your Name: Ardeshir Sayah- Acting NPM in MENARID project I.R.Iran Title of your story: Behvard Underground dam Answer 1: Final Workshop for GEF MENARID Projects “Scaling-up Integrated Natural Resource Management, furthering knowledge on groundwater resources management and strengthening Monitoring and Evaluation systems” 16 - 18 June 2014 Beirut, Lebanon • Water management & Dams – If we constructing dams  increase evaporation – It needs a technique to conserve water flow and under surface water in soil layers • Qanat , Etc
  • Behvard Village – Behavard had lots of fruitful gardens – Because of climate change – Behvard converted to a Dry land large immigration of rural areas happened – Story of Constructing Behvard Underground dam
  • • Behvard Underground water dam – Measures • 50 participatory workshop for – Problem statement – Stakeholder analysis – Defining measures – constructing dam
  • • Behvard Underground water dam – Measures • Biological rehabilitation measures in upstream (150 Hec.) • Mechanical watershed management measures (130 cases) • Population 50  500 people • Organic production of pomegranate gardens is exporting to other part of the country • Economical impact assessment: Benefit/ Cost =1.49
  • • Behvard Underground water dam – Participatory process of establishing, Managing, operating, and water allocations – Now we have a little lake by  transferring water from underground dam by wells and pipes
  • • Highlights – It was First experience in I.R.Iran – Replicate it to three other sites in Iran like Kermanshah Razin and etc.
  • What is INRM? • National and governmental integration • Local level integration • Legislation • Institutionalization • Dynamic model • …
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment
  • Current situation Future Tools and Technique Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • Study Planning Implementation Monitoring and Evaluation Impacts Impact assessment Current situation Future Tools and Technique
  • )(                       )(
  • It needs to have proper interactions between real stakeholders (not only managers but also experts and communities) ICARDA facilitate these movement of MENARID projects and we got lots of ideas from each other  now its time to Shift the approach from table top to field visit of best practices to sharing MENARID filed knowledge properly.