    Macleans - NZ Business taking on the world with a world class IT infrastructure solution. - Presentation Transcript

    1. Taking on the world with a world class IT Infrastructure Solution Adam Zame & Gerhard Richards Maclean Computing IBM Insight Forum 09 Make change work for you ®
    2. 2 Agenda A d • Who is our client? • Prior state of their IT? • Client’s requirements? C e s equ e e s • What Maclean Computing did? • Then what happened?... • How we fixed it? • The future? future?... IBM Insight Forum 09 Make change work for you ®
    3. 3 Af few questions? ti ? • Who has had to press the “BIG RED BUTTON” and p initiate a disaster recovery process in the last 2 yrs? 1 = Yes 2 = No • Do you think virtualisation is still too expensive for a 25 – 75 user small to meduim business? 1 = Yes 2 = No • Have you moved your data centre in the last 2 yrs? 1 = Yes 2 = No IBM Insight Forum 09 Make change work for you ®
    4. 4 Who i th li t? Wh is the client? • Southern Hemisphere’s leading textile and interior p g design company • Operates in US , NZ and Australia • 100 users globally, 6 locations • Invited Maclean Computing in to assist with technology p g gy recommendations and strategy IBM Insight Forum 09 Make change work for you ®
    5. 5 Prior St t f P i State of IT • Main IT services ran on separate aging hardware, some p g g , servers 4+ yrs old • Terminal Server dependent g p globally y • Large WAN with limited redundancy • MS Dynamics NAV site supported by Intergen ISV Intergen, Partner • Limited backup and no Disaster Recovery planning Business Risk and High Maintenance IBM Insight Forum 09 Make change work for you ®
    6. 6 Prior St t f P i State of IT Email Server Domain Controller Terminal Server NAV Server File Server Backup tape IBM Insight Forum 09 Make change work for you ®
    7. 7 Client’s Cli t’ requirements i t • They needed to replace their old hardware y p • Also needed flexibility, due to nature of their business • DR and “Backup and Restore” was critical to reduce Backup Restore risk • Virtualisation and Consolidation proved successful • Site needed some infrastructure upgrades with regards to the server room IBM Insight Forum 09 Make change work for you ®
    8. 8 What M l Wh t Maclean Computing did? C ti • Maclean Computing p p p g proposed a p phased virtualisation solution to reduce business risks • IBM x3850 and x3650 hardware, DS3400 SAN, TS3200 , , Tape Library and VMware ESX Enterprise 3.5 • DR provided by all p p y production systems now VMs and y easily restored to any hardware • Solution completed in early Dec 08 p y IBM Insight Forum 09 Make change work for you ®
    9. 9 What M l Wh t Maclean Computing did? C ti Email Server Domain Controller Terminal T i l Server Terminal Server File Server NAV Server IBM x3850 IBM x3650 Virtual Host Mgmt Fibre Server Switch IBM Tape Library T Lib DS3400 SAN IBM Insight Forum 09 Make change work for you ®
    10. 10 What M l Wh t Maclean Computing did? C ti • Key technologies • IBM x3850 Virtual Hosts • Highly redundant hardware, with built in remote management • Vizioncore vRanger Pro • U d to create backup i Used t t b k images of VM f VMs • Client has a week of backups on disk for fast p recovery IBM Insight Forum 09 Make change work for you ®
    11. 11 What M l Wh t Maclean Computing did? C ti IBM x3850 Server Overview : • Mission-critical availability to help prevent interruptions in day-to- day enterprise operations • Hot-swap power supplies, fans, memory, hard disk drives and 2 x PCI- Express adapters. • Active Memory™ with features such as Memory ProteXion™, hot-add memory and Chipkill™ memory provide a level of reliability and availability that helps reduce downtime and maintain data integrity. • Up to 4 sockets able to be installed and 32 DIMM slots allowing up to 256GB of RAM • Predictive Failure Analysis® on hard disk drives, processors, VRMs, fans and memory. • http://www-03.ibm.com/systems/data/flash/systemx/hardware/enterprise/x3850m2/tour/ IBM Insight Forum 09 Make change work for you ®
    12. 12 What M l Wh t Maclean Computing did? C ti IBM x3850 Server Overview : • Ability to upgrade to scalable system with the ScaleXpander Option kit allowing customers the flexibility to scale as their business needs change. • Six-core and four-core processor options with up to 2.66 GHz (six- core) and 2 4 GHz (four core) speeds with up to 16 MB L2 cache 2.4 (four-core) cache. • Seven PCI-Express x8 high-performance I/O expansion slots, two support hot-swap capabilities. • ScaleXpander Option kit offers customers the flexibility to scale from 4 sockets all the way to 16 sockets. • Memory options are 4 GB or 8 GB/256 GB max PC2-5300 DDR II REMOTE SUPERVISOR ADAPTER OVERVIEW IBM Insight Forum 09 Make change work for you ®
    13. 13 RSA Sli li II Overview Slimline O i IBM Insight Forum 09 Make change work for you ®
    14. 14 RSA Sli li II Overview? Slimline O i ? IBM Insight Forum 09 Make change work for you ®
    15. 15 Then h t h Th what happened? d? • Air conditioning unit failed and water flooded the server g rack • IBM x3850 hardware, DS3400 SAN, x3650 , , management server, tape library and fibre switches all water damaged • The impact is company wide, authentication being the main problem. There was no backup domain controllers other than those at head office • Sydney/Melbourne/Brisbane couldn't even work with just locally stored documents documents. IBM Insight Forum 09 Make change work for you ®
    16. 16 Then h t h Th what happened? d? IBM Insight Forum 09 Make change work for you ®
    17. 17 Then h t h Th what happened? d? IBM Insight Forum 09 Make change work for you ®
    18. 18 Then h t h Th what happened? d? IBM Insight Forum 09 Make change work for you ®
    19. 19 How we fi d it? H fixed • A replacement server was sourced, the offsite tapes p , p were retrieved • An ESX host was provisioned in 30 minutes. p • Vizioncore vRanger Pro was used to restore images to bare VM’s. • 5 Servers were restored in less than 5 hours. This included Exchange 2007, DC, F&P and two Terminal Servers. • Client predicted that recovering the 5 physical servers would h ld have taken up to 4 d k days and could h d ld have cost i in excess of $50,000 lost business and productivity IBM Insight Forum 09 Make change work for you ®
    20. 20 The F t Th Future? ? • Client is discussing the p g possibility of office relocation y • Physical hosting is an option which will reduce risk of system outages due to p y g power and environmentals (water) • Investing in a second virtual host and fibre switching g g when expansion is required, improving redundancy and high availability further • Migrations/upgrades are now very easy, testing and development can be achieved on cloned “live” systems too IBM Insight Forum 09 Make change work for you ®
    21. 21 Thing t t k Thi to take away • Virtualisation is affordable and can give instant benefits • Management tools shouldn’t be overlooked shouldn t • If you are virtualising your systems, definitely look at imaged based backup solutions • Phased deployments are achievable but you need to balance risks and have a DR plan • Redundancy is key but if you can waterproof key, servers that’s better.... IBM Insight Forum 09 Make change work for you ®
    22. 22 Thank you o Questions? IBM Insight Forum 09 Make change work for you ®

    + IBM New ZealandIBM New Zealand, 3 months ago

    custom

    165 views, 0 favs, 0 embeds more stats

    Macleans - NZ Business taking on the world with a w more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 165
      • 165 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 5
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories