• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
PCTY 2012, Smarter Physical Infrastructure Strategy v. Jens Cajus
 

PCTY 2012, Smarter Physical Infrastructure Strategy v. Jens Cajus

on

  • 378 views

Præsentation fra PCTY 2012 v. Jens Cajus

Præsentation fra PCTY 2012 v. Jens Cajus

Statistics

Views

Total Views
378
Views on SlideShare
376
Embed Views
2

Actions

Likes
0
Downloads
4
Comments
0

2 Embeds 2

http://w3.nordic.ibm.com 1
http://www.slashdocs.com 1

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Content to be Finalized – potentially including: Supply Chain Enhancements Mobile/Everyplace Enhancements

PCTY 2012, Smarter Physical Infrastructure Strategy v. Jens Cajus PCTY 2012, Smarter Physical Infrastructure Strategy v. Jens Cajus Presentation Transcript

  • Smartere fysisk infrastruktur - agenda11.15 – 12.00 IBM Smarter Physical Infrastructure strategy Speaker: Jens Cajus (IBM)12.00 – 12.30 Kundecase: Metsä Tissue Maximo Implementation Speaker: Jonas Lindeqvist (IBM)12.30 – 13.30 Frokost13.30 – 14.00 Maximo/TRIRIGA update Speaker: Jens Cajus (IBM)14.00 – 14.45 IBM Smarter Buildings Speaker: Claire Penny - Tivoli Smarter Buildings (IBM)14.45 – 15.15 Pause15.15 – 15.45 Kundecase: IKEA facility management Speaker: Helena Ohlsson, IKEA Global Facility Manager15.45 – 16.30 TRIRIGA Space og Energy Management Speaker: Jens Cajus (IBM) 1
  • IBM Smarter PhysicalInfrastructure Strategy Jens Cajus Consulting IT Specialist© 2012 IBM Corporation
  • Please note:• IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion.• Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision.• The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion.• Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon many factors, including considerations such as the amount of multiprogramming in the users job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve results similar to those stated here. 3
  • Focusing on Smarter Physical Infrastructure 4
  • https://www.ibm.com/developerworks/servicemanagement/ 5
  • Other resources....• The Integrated Service Management Library is providing "Ready to Deploy" integration modules and solutions• Integrations like solution agents, adaptors, smart monitors, system sensors, energy modules, automation profiles and other resources• Improve the time to operational value• Provided by IBM and IBM Business Partners, https://www-304.ibm.com/software/brandcatalog/ismlibrary/ 6
  • IBM Smarter Physical Infrastructure Capabilites IBM Asset and Facilities Management Asset Management MAXIMO Operations Health, Safety Supply Chain Service Management Environment Management Management Facilities Management TRIRIGA and IIBMFacilities & Space Real Estate Environmental Capital & Project Management Management Sustainability Management 7
  • 8
  • Product Roadmap for Maximo, TRIRIGA and Intelligent Building Management 2011 2012 2013 2014/2015 Maximo 7.5 Maximo 7.5.x Maximo 7.x RELEASED May 2011 2H 2012 Asset Management • Integrated TRIRIGA modules for • Customer and Market driven and Industry Solution Space and Capital Project mgmt Enhancements enhancements • Advanced Scheduling Consolidated • Additional Integrations with TRIRIGA • Industry Solution enhancements Modules Solution • Maximo and TRIRIGA Solution TRIRIGA 10.2 TRIRIGA 10.x TRIRIGA 10.x RELEASED Dec 2011 2Q/4Q 2012• FASB Lease Accounting • Reservation Management • Customer and Market driven Compliance Enhancements • Sustainability Management• Translations: French, enhancements Italian, Spanish, Brazilian • Building Mgmt System Integration Portuguese • Additional Translations (11 in 2Q) • Integrated with TRIRIGA TREES and • Energy Analytics becomes part of TRIRIGA portfolio • Building Systems Integration • TRIRIGA user interface • Real Time MonitoringThe information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new productis for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver anymaterial, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. 9 9
  • Maximo and TRIRIGA Product Strategy• Investment in both Maximo and TRIRIGA solutions will continue with enhancements delivered in new future versions – New enhancements of Maximo and TRIRIGA are expected to release in 2012 and 2013• The unified product will offer customers the Maximo Enterprise Asset Management (EAM) capabilities combined with the breadth of the TRIRIGA Integrated Workplace Management Systems (IWMS) capabilities into a single comprehensive solution for managing facilities, real estate, energy and environmental sustainability• Consolidation of both TRIRIGA and Maximo technology and capabilities benefit from a legacy of similar design philosophy – Both are J2EE Java-based and web-architected – Same approach to use of meta-data that preserves configuration data – Similar use of role-based user experience The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. 10 10
  • What is a Consolidated Solution?• Provides capabilities for EAM, IWMS and Integrated Service Management• Has intuitive usability, navigation features and a role driven user experience• Is highly configurable and extendable without having to code• Provides insights for business improvements through graphical reports, maps and analysis• Can be easily integrated with third party systems like ERP’s or BMS’s• Is easy to maintain, administer and has a low total cost of ownership long term 11
  • Maximo serves the Enterprise Asset Management market. Asset Management Work Management Inventory Management Procurement Service Management Management • Work order mgmt• Location, component • Service desk • Labor mgmt • Material, parts and • Purchasing hierarchy, and • Service level maintenance history • Skills, certifications tools usage mgmt • Supply chain agreements• Condition Monitoring and qualifications • Inventory • Requisitioning • Contracted services • Scheduling, resource optimization• Calibration • Customer billing optimization Capital Project Real Estate Portfolio Energy & Environmental Facility Space Contract Management Management Sustainability Mgmt Management Management • Strategic RE portfolio• Condition • Utility tracking planning • Space utilization • Vendor contracts assessment • Carbon output • RE budgeting & • Capacity planning • Lease/rental• Capital planning measurement forecasting RE • • Labor• Budgeting • Environmental Move, add, change • Lease & contract • Warranties• Project mgmt opportunity analysis • Reservations administration Health, Safety & Datacenter Infrastructure Asset Configuration Field Service Service Provider Environmental Mgmt Management Management Management• Incidents • Power, cooling & • Multi-customer • Current & historical • Advanced scheduling• Investigations space optimization management configuration tracking • Dispatch• Action Tracking • Allocation planning • Customer • Design change • Real-time• Management of • Datacenter energy agreements tracking communication Change mgmt • Customer billing 12
  • Maximo serves the Datacenter Infrastructure Management market. Asset Management Work Management Inventory Management Procurement Service Management Management • Work order mgmt• Location, component • Service desk • Labor mgmt • Material, parts and • Purchasing hierarchy, and • Service level maintenance history • Skills, certifications tools usage mgmt • Supply chain agreements• Condition Monitoring and qualifications • Inventory • Requisitioning • Contracted services • Scheduling, resource optimization• Calibration • Customer billing optimization Capital Project Real Estate Portfolio Energy & Environmental Facility Space Contract Management Management Sustainability Mgmt Management Management • Strategic RE portfolio• Condition • Utility tracking planning • Space utilization • Vendor contracts assessment • Carbon output • RE budgeting & • Capacity planning • Lease/rental• Capital planning measurement forecasting RE • • Labor• Budgeting • Environmental Move, add, change • Lease & contract • Warranties• Project mgmt opportunity analysis • Reservations administration Health, Safety & Datacenter Infrastructure Asset Configuration Field Service Service Provider Environmental Mgmt Management Management Management• Incidents • Power, cooling & • Multi-customer • Current & historical • Advanced scheduling• Investigations space optimization management configuration tracking • Dispatch• Action Tracking • Allocation planning • Customer • Design change • Real-time• Management of • Datacenter energy agreements tracking communication Change mgmt • Customer billing 13
  • TRIRIGA serves the Integrated Workplace Management market. Asset Management Work Management Inventory Management Procurement Service Management Management • Work order mgmt• Location, component • Service desk • Labor mgmt • Material, parts and • Purchasing hierarchy, and • Service level maintenance history • Skills, certifications tools usage mgmt • Supply chain agreements• Condition Monitoring and qualifications • Inventory • Requisitioning • Contracted services • Scheduling, resource optimization• Calibration • Customer billing optimization Capital Project Real Estate Portfolio Energy & Environmental Facility Space Contract Management Management Sustainability Mgmt Management Management • Strategic RE portfolio• Condition • Utility tracking planning • Space utilization • Vendor contracts assessment • Carbon output • RE budgeting & • Capacity planning • Lease/rental• Capital planning measurement forecasting RE • • Labor• Budgeting • Environmental Move, add, change • Lease & contract • Warranties• Project mgmt opportunity analysis • Reservations administration Health, Safety & Datacenter Infrastructure Asset Configuration Field Service Service Provider Environmental Mgmt Management Management Management• Incidents • Power, cooling & • Multi-customer • Current & historical • Advanced scheduling• Investigations space optimization management configuration tracking • Dispatch• Action Tracking • Allocation planning • Customer • Design change • Real-time• Management of • Datacenter energy agreements tracking communication Change mgmt • Customer billing 14
  • TRIRIGA / Maximo combinedTogether Maximo and TRIRIGA are a portfolio of solutions that helps customersoptimize the performance and value of their enterprise infrastructure. Asset Management Work Management Inventory Management Procurement Service Management Management • Work order mgmt • Location, component • Service desk • Labor mgmt • Material, parts and • Purchasing hierarchy, and • Service level maintenance history • Skills, certifications tools usage mgmt • Supply chain agreements • Condition Monitoring and qualifications • Inventory • Requisitioning • Contracted services • Scheduling, resource optimization • Calibration • Customer billing optimization Capital Project Real Estate Portfolio Energy & Environmental Facility Space Contract Management Management Sustainability Mgmt Management Management • Strategic RE portfolio • Condition • Utility tracking planning • Space utilization • Vendor contracts assessment • Carbon output • RE budgeting & • Capacity planning • Lease/rental • Capital planning measurement forecasting RE • Move, add, change • Labor • Budgeting • Environmental • Lease & contract • • Warranties • Project mgmt opportunity analysis Reservations administration Health, Safety & Datacenter Infrastructure Asset Configuration Field Service Service Provider Environmental Mgmt Management Management Management • Incidents • Power, cooling & • Multi-customer • Current & historical • Advanced scheduling • Investigations space optimization management configuration tracking • Dispatch • Action Tracking • Allocation planning • Customer • Design change • Real-time • Management of • Datacenter energy agreements tracking communication Change mgmt • Customer billing 15
  • 16