SlideShare a Scribd company logo
1 of 6
Program Procedures
 • Apply between January 4 - February 5, 2013.

 • If applications exceed available capacity, an independent
   third-party will select projects by random drawing.

 • If capacity is not reached, applications will continue to be
   accepted beyond 02/05/2013 (first-come, first-served.)
Program Categories
Program Steps
 •   Submit a complete application packet with all
     required documents.
 •   Pay for all applicable fees and deposits.
 •   Be accepted by GRU and assigned capacity in the
     upcoming year.
 •   Receive GRU Engineering approval of the project
     plan in a timely manner.
 •   Submit proof of insurance documents.
 •   Sign and execute the SEPA.
 •   Meet payment obligations for any GRU electrical
     distribution system upgrades that may be required
     to accommodate the PV system.
Program Steps (Cont’d)
 • Satisfy all applicable permitting, building
   code, planning and land use requirements.
 • Pass GRU system review and be
   interconnected to the distribution system.
 • Complete the project by the completion date
   specified in the SEPA.
 • Provide documentation of final system cost and
   capacity to GRU.
Act Fast, Time & Capacity Are Limited. . .

  To apply to the GRU Solar FIT Program contact:




   Fill out the GRU Solar FIT Info Request online
        wp.me/P2SmtF-s1
        We will contact you within 24 hours

More Related Content

Viewers also liked

Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled PresentationTann Molko
 
CEO Pyramid Scheme Objection
CEO Pyramid Scheme ObjectionCEO Pyramid Scheme Objection
CEO Pyramid Scheme ObjectionJim Ball
 
How to streamline facebook feed
How to streamline facebook feedHow to streamline facebook feed
How to streamline facebook feedJim Ball
 
Isabella clair
Isabella clairIsabella clair
Isabella clairLanie9669
 

Viewers also liked (6)

Untitled Presentation
Untitled PresentationUntitled Presentation
Untitled Presentation
 
El cargol
El cargolEl cargol
El cargol
 
CEO Pyramid Scheme Objection
CEO Pyramid Scheme ObjectionCEO Pyramid Scheme Objection
CEO Pyramid Scheme Objection
 
Mandibular Anesthesia : Inferior alveolar nerve block
Mandibular Anesthesia : Inferior alveolar nerve blockMandibular Anesthesia : Inferior alveolar nerve block
Mandibular Anesthesia : Inferior alveolar nerve block
 
How to streamline facebook feed
How to streamline facebook feedHow to streamline facebook feed
How to streamline facebook feed
 
Isabella clair
Isabella clairIsabella clair
Isabella clair
 

Recently uploaded

Spiritual Life Quote from Shiva Negi
Spiritual Life Quote from Shiva Negi Spiritual Life Quote from Shiva Negi
Spiritual Life Quote from Shiva Negi OneDay18
 
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?Mikko Kangassalo
 
English basic for beginners Future tenses .pdf
English basic for beginners Future tenses .pdfEnglish basic for beginners Future tenses .pdf
English basic for beginners Future tenses .pdfbromerom1
 
The 5 sec rule - Mel Robins (Hindi Summary)
The 5 sec rule - Mel Robins (Hindi Summary)The 5 sec rule - Mel Robins (Hindi Summary)
The 5 sec rule - Mel Robins (Hindi Summary)Shakti Savarn
 
integrity in personal relationship (1).pdf
integrity in personal relationship (1).pdfintegrity in personal relationship (1).pdf
integrity in personal relationship (1).pdfAmitRout25
 
Call Girls Dubai O525547819 Favor Dubai Call Girls Agency
Call Girls Dubai O525547819 Favor Dubai Call Girls AgencyCall Girls Dubai O525547819 Favor Dubai Call Girls Agency
Call Girls Dubai O525547819 Favor Dubai Call Girls Agencykojalkojal131
 
Benefits of Co working & Shared office space in India
Benefits of Co working & Shared office space in IndiaBenefits of Co working & Shared office space in India
Benefits of Co working & Shared office space in IndiaBrantfordIndia
 

Recently uploaded (7)

Spiritual Life Quote from Shiva Negi
Spiritual Life Quote from Shiva Negi Spiritual Life Quote from Shiva Negi
Spiritual Life Quote from Shiva Negi
 
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?
Virtue ethics & Effective Altruism: What can EA learn from virtue ethics?
 
English basic for beginners Future tenses .pdf
English basic for beginners Future tenses .pdfEnglish basic for beginners Future tenses .pdf
English basic for beginners Future tenses .pdf
 
The 5 sec rule - Mel Robins (Hindi Summary)
The 5 sec rule - Mel Robins (Hindi Summary)The 5 sec rule - Mel Robins (Hindi Summary)
The 5 sec rule - Mel Robins (Hindi Summary)
 
integrity in personal relationship (1).pdf
integrity in personal relationship (1).pdfintegrity in personal relationship (1).pdf
integrity in personal relationship (1).pdf
 
Call Girls Dubai O525547819 Favor Dubai Call Girls Agency
Call Girls Dubai O525547819 Favor Dubai Call Girls AgencyCall Girls Dubai O525547819 Favor Dubai Call Girls Agency
Call Girls Dubai O525547819 Favor Dubai Call Girls Agency
 
Benefits of Co working & Shared office space in India
Benefits of Co working & Shared office space in IndiaBenefits of Co working & Shared office space in India
Benefits of Co working & Shared office space in India
 

How To Apply For GRU F.I.T. Solar Program

  • 1.
  • 2. Program Procedures • Apply between January 4 - February 5, 2013. • If applications exceed available capacity, an independent third-party will select projects by random drawing. • If capacity is not reached, applications will continue to be accepted beyond 02/05/2013 (first-come, first-served.)
  • 4. Program Steps • Submit a complete application packet with all required documents. • Pay for all applicable fees and deposits. • Be accepted by GRU and assigned capacity in the upcoming year. • Receive GRU Engineering approval of the project plan in a timely manner. • Submit proof of insurance documents. • Sign and execute the SEPA. • Meet payment obligations for any GRU electrical distribution system upgrades that may be required to accommodate the PV system.
  • 5. Program Steps (Cont’d) • Satisfy all applicable permitting, building code, planning and land use requirements. • Pass GRU system review and be interconnected to the distribution system. • Complete the project by the completion date specified in the SEPA. • Provide documentation of final system cost and capacity to GRU.
  • 6. Act Fast, Time & Capacity Are Limited. . . To apply to the GRU Solar FIT Program contact: Fill out the GRU Solar FIT Info Request online wp.me/P2SmtF-s1 We will contact you within 24 hours