Your SlideShare is downloading. ×
BP Don ‘Live Well Abandonment’ - Application Of Post Project Actions For 2nd Phase Success
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

BP Don ‘Live Well Abandonment’ - Application Of Post Project Actions For 2nd Phase Success

1,032
views

Published on

Published in: Business

1 Comment
0 Likes
Statistics
Notes
  • Congratulations !!! This is an excellent work.Thank you for sharing. We have selected your presentation for the reference in our group Slideshare 'BANK OF KNOWLEDGE'. We would be honored by your support through your membership. You are invited to join us ! I wish you a nice weekend. Greetings from France. Bernard

    http://www.slideshare.net/group/bank-of-knowledge

    PS: I also added you Slidecast to my others groups :
    - SOUND and MUSIC, the best (Number one of groups Slideshare) -
    http://www.slideshare.net/group/sound-and-music-the-best-slideshows
    - YOUTUBE,SLIDECAST & VIDEO -
    http://www.slideshare.net/group/you-tube-slidecast
       Reply 
    Are you sure you want to  Yes  No
    Your message goes here
  • Be the first to like this

No Downloads
Views
Total Views
1,032
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
1
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. BP Don ‘Live Well Abandonment’ Application Of Post Project Actions For 2nd Phase Success “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 2. Project Overview “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 3. Choice of Vessel • Vessel Specific Safety Case (Hydrocarbon handling capabilities) • Light Well Intervention Package: Wireline Pumping / Cementing Coiled Tubing • Integral Saturation Diving Spread “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 4. Project Detail 5” Vertical Tree “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 5. Project Detail Diver Work Platform “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 6. Project Detail Diver Work Platform “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 7. Project Detail Hydraulic Prong Removal Tool “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 8. Project Detail 10 Core / 8 Core Hook Up “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 9. Project Detail Mechanical Tree Cap “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 10. Project Detail Tree ROV Hot Stab Panel (Divers Required) “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 11. Project Detail Diver Cold Cutting Equipment (Basic) “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 12. ‘Lessons Learned’ Summary • Acknowledge and address all debrief actions • Redesign HPRT with annulus circulation capabilities • Design more diver work platforms for concurrent operations • Reduce connect / disconnect operations to reduce timely testing • Consider heave state for E-fire tool sensitivity • Reduce number of 3rd party operators / equipment where practicable • Redesign procedure pack (make user friendly) • Increase PRV release pressures for increased pumping rates • Review MOC documentation and implement changes in revised procedures • Incorporate all additional small changes / typos • Incorporate larger procedures (site instructions) written up in the field • Risk assess previous site instructions / MOC’s at phase 2 level 1 • Incorporate SJA’s into live project risk assessment “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 13. Phase 1 Indicators & Actions Safe Job Analysis 3 Management of Change 15 Level 1 Risk Assessments 1 Level 2 Risk Assessments 1 Time Out For Safety 68 TRAC Cards 1063 Area Inspections 9 ER Drills 186 Safety Observations 344 (17% - Improvement Suggestions) (30% - Positive Observations) (53% - At Risk Observations) Other Indicators Debrief Actions Addressed and Closed 31 “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”
  • 14. Lessons Learned Operation Specific Time Comparison Table (Hrs) “All information contained in this document is confidential and proprietary to Helix Well Ops UK Ltd. No information may be divulged in whole or in part to any company or person without written permission of Helix Well Ops UK Ltd.”