River Road Meeting 7-22-04
Upcoming SlideShare
Loading in...5
×
 

River Road Meeting 7-22-04

on

  • 463 views

 

Statistics

Views

Total Views
463
Views on SlideShare
463
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

River Road Meeting 7-22-04 River Road Meeting 7-22-04 Presentation Transcript

  • River Road Area Sewer Improvements Neighborhood Advisory Committee July 22, 2004
  • Today’s Meeting
    • Program Review
    • River Road Projects
      • EQ Basin/Pump Station - Brookford Park
      • Sewer installation
      • Force main installation
    • Next Meeting Date
  • Program Review
    • 4 Sanitary Sewer Overflows in River Road Area
    • Must be eliminated by November of 2006
      • Stiff penalties for missed deadlines
  • Proposed River Road Area Projects
    • Underground Equalization Basin – River Road Park
    • Underground Pump Station – River Road Park
    • New Force Main Sewer – Brookford Drive
    • New Relief Sewer– Beverly and River Road
    • Beverly Pump Station – West of Trail
  • Project Schedules
    • Projects will be built concurrently
    • Construction bids – October/November 2004
    • Break Ground – Spring 2005
    • Completed by November 2006
  • Equalization Basin
    • Underground facility
      • 3 million gallon storage capacity
      • 120 ft. x 240 ft.
      • 17 ft. deep
    • To be located at River Road Park ball diamond site
      • Tanks from old Toledo Water Plant currently located there
  • Equalization Basin
  • Equalization Basin Issues & Discussion
    • Construction Access Road
      • From River Road to site (between playgrounds)
      • Reduces amount of construction equipment entering site from Brookford
    • Grading
        • Part of Treatment Plant project
      • Fill to reorient sledding hill
      • Fill to shift baseball diamond to west
      • Fill to improve park-like setting
  • Issues and Discussion Continued
    • Baseball diamond
      • Will be lost for one season due to construction
      • Options for replacement of the field
        • Outfield
        • Parking
        • Bleachers
    • Maintenance building
      • City reviewing options
  • River Road Park Pump Station
    • Located next to Equalization Basin
    • Bulk of facility underground
    • Electrical panel above ground
  • Force Main Sewer
    • New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
    • To be located on south side of Brookford
    • Shouldn’t disturb street – except for crossings at OLPH and Island Avenue
    • Traffic maintained
      • Will work with committee to minimize disruption
  • New Relief Sewers
    • From River Road, Midland or Hemlock down River Road to Brookford
      • New water line will be installed at same time
        • Should help resolve water pressure problems
      • Preferred sewer location is in east lane of River Road
  • New Relief Sewers
    • On Beverly from Brookford to Medford
    • Both relief sewer lines should help reduce basement flooding in area
    • Traffic control
  • Beverly Pump Station
    • Underground – with electrical panel(s) above ground
    • Will pump waste from Beverly sewer to new EQ basin
  • Comment
    • Questions
    • Discussion
  • Future Meetings
    • Next meeting date?
    • Best time and location?