• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
CPAC Meeting 9-8-04
 

CPAC Meeting 9-8-04

on

  • 460 views

 

Statistics

Views

Total Views
460
Views on SlideShare
460
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    CPAC Meeting 9-8-04 CPAC Meeting 9-8-04 Presentation Transcript

    • Wednesday, September 8, 2004 River Road Area Sewer Improvements
    • Today’s Meeting
      • Program Update
      • River Road Improvements
      • Next Meeting Date
    • Program Update – Financing
      • Took out $34 million in loans this year
        • Extremely favorable terms
        • Paid back after project is completed
        • Borrowed as needed
      • Will take out approximately $110 million in loans next year
      • Not selling bonds this year
        • Doing well with low-interest loans
    • Program Update – Metroparks Partnership
      • Wetland mitigation
        • If we use wetlands for construction (mooring basin at plant) must restore wetlands 2 to 1
        • City reimbursing Metroparks for $45,00 toward purchase of 10 acres of land in Spencer Township (Angola and Eber Roads)
      • Stream bank mitigation
          • $12,000 for improvements at SideCut Metropark
    • River Road SSOs
      • 4 in the River Road Area
      • Must be eliminated by November of 2006
        • Stiff penalties for missed deadlines
    • Past & Ongoing River Road Area Projects
      • Sanitary sewer study – 2000/2001
      • Storm sewer study – 2002/2003
      • Sewer lining – 2002/ongoing
      • Copland storm sewer – 2002
      • Beverly/Medford storm sewer – 2004/ongoing
    • Proposed River Road Area Projects
      • Underground Equalization Basin – River Road Park
      • Underground Pump Station – River Road Park
      • New Force Main Sewer – Brookford Drive
      • New Relief Sewer– Beverly and River Road
      • Beverly Pump Station – West of Trail
    • Project Schedules
      • Projects will be built concurrently
      • Construction bids – October/November 2004
      • Break Ground – Spring 2005
      • Completed by November 2006
    • Equalization Basin
      • Underground facility
        • 3 million gallon storage capacity
        • 120 ft. x 240 ft.
        • 17 ft. deep
      • To be located at River Road Park ball diamond site
        • Tanks from old Toledo Water Plant currently located there
    • Equalization Basin
    • EQ Basin Issues & Discussion
      • Construction Access Road
        • From River Road to site (between playgrounds)
        • Reduces amount of construction equipment entering site from Brookford
        • Could disrupt playground areas
    • Issues and Discussion
      • Baseball field
        • Will be lost for one season due to construction
        • Alternative options for replacement of the field
    • River Road Park Pump Station
      • Located next to Equalization Basin
      • Bulk of facility underground
      • Control panel above ground
      • Will pump waste from River Road sewer to equalization basin
    • Beverly Pump Station
      • Underground – with control panel(s) above ground
      • Will pump waste from Beverly sewer to new EQ basin
    • Force Main Sewer
      • New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
      • To be located on south side of Brookford
      • Shouldn’t disturb street – except for crossings at OLPH and Island Avenue
      • Traffic maintained
        • Will work with committee to minimize disruption
    • New Relief Sewers
      • From River Road, Midland or Hemlock down River Road to Brookford
        • New water line will be installed at same time
          • Should help resolve water pressure problems
        • Preferred sewer location is in east lane of River Road
    • New Relief Sewers
      • On Beverly from Brookford to Medford
      • Both relief sewer lines should help alleviate basement flooding in area
    • Future Meetings
      • Next meeting date?
      • Best time and location?