Community Program  Advisory Committee Monday, March 21, 2005
Today’s Meeting <ul><li>Program Update </li></ul><ul><ul><li>River Road </li></ul></ul><ul><ul><li>Point Place </li></ul><...
Program Update –  River Road <ul><li>Contracts have been awarded </li></ul><ul><ul><li>E.S. Wagner </li></ul></ul><ul><ul>...
Program Update –  River Road continued <ul><li>Projects will be built concurrently  </li></ul><ul><li>Construction contrac...
Program Update –  River Road continued
Program Update –  Point Place <ul><li>290 th  Street Pump Station </li></ul><ul><ul><li>Nearly complete </li></ul></ul><ul...
Program Update –  Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Postponed construction on Edgewat...
Program Update –  Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Currently installing force main a...
Program Update –  Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Starting April 4 th , contractor ...
Program Update – BVWWTP <ul><li>Grit facility has been bid  </li></ul><ul><ul><li>Rudolph Libbe low bid </li></ul></ul><ul...
LTCP Public Meetings <ul><li>Potential sites </li></ul>
Next meeting <ul><li>Other issues </li></ul><ul><li>Next meeting date, time </li></ul>
Upcoming SlideShare
Loading in...5
×

CPAC Meeting 3-21-05

280

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
280
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

CPAC Meeting 3-21-05

  1. 1. Community Program Advisory Committee Monday, March 21, 2005
  2. 2. Today’s Meeting <ul><li>Program Update </li></ul><ul><ul><li>River Road </li></ul></ul><ul><ul><li>Point Place </li></ul></ul><ul><ul><li>Bay View Wastewater Treatment Plant </li></ul></ul><ul><li>LTCP Public Meetings </li></ul><ul><li>Next Meeting </li></ul>
  3. 3. Program Update – River Road <ul><li>Contracts have been awarded </li></ul><ul><ul><li>E.S. Wagner </li></ul></ul><ul><ul><li>Anderzack Pitzen </li></ul></ul>
  4. 4. Program Update – River Road continued <ul><li>Projects will be built concurrently </li></ul><ul><li>Construction contracts being finalized </li></ul><ul><ul><li>River Road sewer and water line </li></ul></ul><ul><ul><ul><li>Start in next two weeks </li></ul></ul></ul><ul><ul><ul><li>Completed by fall </li></ul></ul></ul><ul><ul><li>Basin and pump station and Brookford sewer </li></ul></ul><ul><ul><ul><li>Begin in April </li></ul></ul></ul><ul><ul><ul><li>Completed by Fall 2006 </li></ul></ul></ul>
  5. 5. Program Update – River Road continued
  6. 6. Program Update – Point Place <ul><li>290 th Street Pump Station </li></ul><ul><ul><li>Nearly complete </li></ul></ul><ul><li>Edgewater Pump Station </li></ul><ul><ul><li>About 2 months behind schedule </li></ul></ul><ul><ul><li>Complete early summer </li></ul></ul>
  7. 7. Program Update – Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Postponed construction on Edgewater Drive between 131 st Street and 136 th Street until March 24 th , the day before Spring Break, because of concern for children and traffic </li></ul></ul>
  8. 8. Program Update – Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Currently installing force main and gravity sewer on Edgewater Drive from 131 st Street to 129 th Street </li></ul></ul><ul><ul><li>Starting March 24 th , will begin to install gravity sewer south from school to 131 st Street </li></ul></ul><ul><ul><ul><li>Next will install force main north from 131 st Street to school </li></ul></ul></ul><ul><ul><ul><li>Then will install gravity sewer north from school to 136 th Street </li></ul></ul></ul>
  9. 9. Program Update – Point Place <ul><li>Edgewater Drive construction </li></ul><ul><ul><li>Starting April 4 th , contractor will shift work scheduled to begin at 9 a.m. to minimize the impact on morning commutes to work and school </li></ul></ul><ul><ul><li>A safe walkway with a visible barrier between the roadway and the walk will be created for children walking to school as well as other foot traffic </li></ul></ul>
  10. 10. Program Update – BVWWTP <ul><li>Grit facility has been bid </li></ul><ul><ul><li>Rudolph Libbe low bid </li></ul></ul><ul><li>Wet weather grit facility bid </li></ul><ul><ul><li>Mosser low bid </li></ul></ul><ul><li>Equalization basin will be bid first week of April </li></ul><ul><li>Could see groundbreaking as early as first week of April </li></ul>
  11. 11. LTCP Public Meetings <ul><li>Potential sites </li></ul>
  12. 12. Next meeting <ul><li>Other issues </li></ul><ul><li>Next meeting date, time </li></ul>