Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Upcoming SlideShare
Loading in...5
×
 

Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011

on

  • 965 views

 

Statistics

Views

Total Views
965
Views on SlideShare
963
Embed Views
2

Actions

Likes
0
Downloads
1
Comments
0

1 Embed 2

http://www.linkedin.com 2

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011 Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011 Document Transcript

    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Dear HR Executive Recruiter 12 October 2011RE: Project Director, ICI Architecture and ConstructionArchitecture should extend our expectations, be probative, but be measurable to be managed andaccounted for success. My leadership engages AEC team design effort to such pragmatics serving clientneeds. Managing complex projects in private, D+B or P3 procurements, I deliver the AEC teamworkneeded for realization and measurable success. My focus delivers the clarity of goals needed to achieve.My designs have won prizes and citations for mixed-use and complex project work. Project Manager forAtlantis, Dubai from start to finish timely delivering 190 member AEC team’s efforts over half the globe.Pragmatic necessities have hold in my career, as I work to successfully getting things built, from housingto hospitality, delivering agreement, resolving project goals, extending the possibilities. Skilfulpragmatism has led to my leading and delivering Big projects; mentoring teamwork in complex contexts;taking project design thought-experiment to service business needs and make the project real.My career is an unusually consistent string, exceeding expectations, stewarding teamwork, gaining clientsatisfaction while achieving: design quality, effective teamwork, and, measured value in results. Leadingproject design and construction teams to successful and profitable delivery is my achievement.Leadership is marshalling all team efforts, to clear purpose. People invest effort in leaders they trust, invalues and vision shared in project directives. Challenge the AEC team vision, with every milestone setclearly. Focus light, essential and effective management, through directing clear goals, compliance,review, schedule and objectives are all diligently in place with stakeholder accounted needs. Focuseddecisions, building goals clarity, mentored field teamwork these add-up to purpose, performance, andprofits, my win-win-wins, delivering the project measurably to the bottom-line.Profitable project execution I produce at the AEC interface, delivered into the field. -Hans GoetzePage |1 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Professional Experience Hans Goetze has over 30 years experience in architecture, construction management, design-2007 -2009Poon MacKenzie Architects/NORR build procurements and project development.Calgary, AB His experience includes leading institutionalManager, Project Development corporate and developer client teams for2002 -2007 commercial, institutional, residential, industrial,Giffels Associates Limited/NORR healthcare, resorts, hotels, in high rise, mixed-Toronto, ON use, complex or multi-phased projects.Project Manager / Senior Architectural Project Leader Hans’s technical knowledge and design skills1994 - dateARCHITYPES Inc. Architectural Projects Management provide clarity of direction to AEC engineeringToronto, ON teams enabling achievement of clear goals onPresident complex projects with exceptional profits.1981 – date His project teams have been distinguished by TMArchitypes / Kastania Construction Ltd. design awards and citations.Toronto, ON Hans is certified BCIN for complex building codePresident diligence, and fully experienced with Canadian,1990 – 1993 US and International building codes, and LEEDAnnau Associates Architects Inc.Toronto, ON Accredited Professional.Director, Contract Administration Hans focuses AEC project teams delivering realDirector, Technical Services value to client real property portfolios.1988 – 1990Kirshenblatt Korman Associates His win-win-win, purpose, performance, profits.Toronto, ONAssociate / Chairman, Project Management Committee / Team Leader, High-Rise and Mixed-Use Projects1984 – 1988Anthony Kemp Architects Inc.Toronto, ONSenior Project Manager / Project Manager/Designer1977 – 1981Page & Steele ArchitectsToronto, ONAssistant Designer / Junior DesignerEducationMount Royal University 2009- PMI-PMP SeminarsLEED-AP, 2009BCIN, Complex Buildings, 2005RAIC Syllabus 1984-94Architectural Association School of ArchitectureLondon, UK, 1973 - 1976+ A.A. Intermediate, candidate RIBA Part 1 (1976)Brunel University, Uxbridge, UK+ Doctoral Cybernetics Seminars (1976)University of Toronto, Toronto, ON+ School of Architecture (1972)+ Arts and Sciences (1971) Math and EconomicsPage |2 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0 Portfolio of Experience 2007 -2009 Poon MacKenzie Architects/NORR Calgary, AB Manager, Project Development Haiku Tower, Calgary Leadership is achieved by Design - with results in hard Production Documents.DELIVERING COMPLEX HEALTHCARE, INDUSTRIAL, COMMERCIAL, HOTELS AND RESORTS Atlantis Hotel, Waterpark and Conference Centre The Palm Island, Dubai - While relocated to Calgary to aid in high-rise projects efforts of NORR new affiliate firm PMA, Hans continued his Project Manager rôle in ensuring the Atlantis Construction Team “stayed-on-mission” at, 2 Palm Island, Dubai, UAE - Feature international destination water-themed 47 hectare US$1.5 bn 220,000m resort on the premier manmade island chain of the Dubai coast. Project Director confided “you give a clinic” with Hans e- mails ensuring RFI’s and alternative proposal’s compliance was achieved. That vigilance paid-off in highest ever profit margins for the firm in those years. Then, when a welding accident started a major fire in the nearly complete hotel, the insurers could find no cause to avoid paying under their coverage. As the very grateful client said, ``everything had performed as it was designed to do! Thank you.” Kilmorey Lodge, Glacier and Waterton Lakes, International Parks Parks Canada, Waterton, Alberta –gateway property to the town across the bay world-famous Prince of Wales, replacement of renowned boutique-sized 2254 m2 heritage 26 room hotel destroyed by fire in January 2009 - Project Manager including client liaison, design and awarding AEC team contracts; and, facilitated negotiated redevelopment agreement reached with Parks Canada and its tenant- operator within 3 months, including programming, codes compliance, schematic design guidance, Parks Canada negotiations for agreement and oversight at public meetings for community proposal acceptance. Proposals: The Cove, Hotel Residential Condominium Towers and Villas, Dubai 2 The Palm Island, Dubai – Kerzner proposed 584 keys hotel, and 170,220 m 506 luxury residential apartments in four 33 and 23 storey towers providing spa and retail facilities podium and 28 beach front villas. Kerzner requested Hans Project Manager rôle providing preparatory codes analysis prior to schematic design approvals with Istithmar on this US$1.9 bn project. Jumeirah Gardens, Residential Hotel, Villas, and The Club Marina, Dubai 2 WATG requested Hans participation in providing life safety systems and codes services, on this 250,000 m US$2.6 bn 312 suites hotel with 6 33 storey apartment towers, 41 villas project, and marina clubhouse with berthing for 40 yachts. Worlds of Discovery Resort, The World, Dubai NORR Director request Hans for Project Manager rôle on AEC team additionally providing life safety systems and codes services, on this proposed LEED-Gold US$5.0 bn project on The World Islands for JV with Nakheel. Page |3 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0RESIDENTIALCristal, Tower, Calgary, AB 233 storey, 26,300 m , $76.6 mn, 214-unit residential condominium tower with mixed-use retail podium located inthe Beltline, adjacent downtown core - Project Manager, including client liaison design and stewarding AEC teamfor shovel ready production documents and completing municipal approvals, alternative designs for municipalapprovals including neighbourhood liaison, and shovel ready production document. Alternative design studied for 2mixed-use retail office residential, 24 storeys, 25,400 m - achieved fee yield 3.99IDENTIALHaiku Tower Calgary, AB 225 storey, 21,200 m , $64.4 mn, 254-unit residential condominium tower with office and retail, mixed-use 4 storeypodium located in the Beltline, adjacent downtown core - Project Manager including client liaison design andstewarding AEC team for value-engineering design and completing municipal approvals, including neighbourhoodliaison, and shovel ready production documents – achieved fee yield 4.12Aura Tower Calgary, AB 224storey, 19,800 m , $56.8 mn, 148 unit residential condominium tower located in the Beltline, adjacentdowntown core.. Project Manager liaising JV partners commitments, systems design oversight, appointment andstewarding AEC team and completing municipal approvals, for shovel ready production documents (using off-shore production studio) – achieved fee yield 4.33Panorama on Prospect Hill, Calgary, AB148 unit, $32.9 mn, grade related townhouse blocks paradigm as slope-adapted to foothills site – Project Managerincluding client liaison design, stewarding AEC team for shovel ready production documents and completingmunicipal approvals – recovered fee extras for achieved fee yield 6.13Walker Lake Sandstones, Edmonton, AB138 unit, $30.6 mn, grade related townhouse blocks paradigm as slope-adapted to foothills site – Project Managerincluding client liaison design and stewarding AEC team for shovel ready production documents completedmunicipal approvals, and commenced first phase construction – recovered fee extras for fee yield 4.13Treo Cidex, Calgary, AB154 unit, $34.2 mn, stacked townhouse blocks paradigm slope adapted tofoothills site – Project Manager including client liaison design andstewarding AEC team for shovel ready production documents (using off-shore production studio) and completing municipal approvals – achievedfee yield 4.07Riverside Quays Phases 1 – 3, Calgary, ABeight six storey apartment towers providing 607 units rimmed by 76townhouses on 5.9 ha reclaimed industrial brownfield site in the 2Inglewood community on the banks of the Bow River, 79,745m $168 mn -Project Manager on phases 1 and 2 from construction start, and, liaisingAEC team completing shovel ready documents to phases 3 and 4Page |4 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0HERITAGE thBank of Montreal, 8 Avenue, Calgary AB Project Manager, Designer – Proposed redevelopment of a listed four storey th heritage property on Stephen Avenue (8 ) pedestrian precinct retaining the original building facades and interior banking floor remediating the ASR failing concrete structure and replacing obsolete MEP systems to suit tenant needs. King Edward Hotel, The House of Blues, Proposal Calgary, AB Project Manager, designer, Proposed redevelopment of famed blues cabaret venue to reclaim the heritage shell from interior condemned for structural damage as a music school incorporating development of adjacent block with condominium towerHEALTH CAREBeaver Dam Lodge, Calgary, AB,Retrofit existing seniors housing wing for early stageAlzheimer residents’ special needs. Project Manager,designer, AEC team contracts appointments, completingprovincial funding and municipal approvals productiondocuments and contract administration.2002 -2007Giffels Associates Limited/NORRToronto, ONProject Manager/Senior Architectural Project LeaderAtlantis, The Palm, DubaiHOTELS AND RESORTSAtlantis Hotel, Waterpark and Conference Centre,Palm Island, Dubai, UAE - Featured internationaldestination water-themed 47 hectare resort on the premier manmade island chain of the Dubai coast. This USD1.5 billion project comprised 1539 suite linked twin hotel towers, convention centre, aquarium and retail village ina one kilometer long building complex in a 3 kilometer long site with 108 building Waterpark, Aquaria andamenities. First performing diligence review of WATG design at outset for Kerzner, Hans continued as ProjectManager, Codes, for the entire project, for five years while construction was completed. Hans provided life safetyand building codes compliance, permitting review, and alternatives based on international codes and primarydetail and systems selection for the overall project. As designate ongoing Project Manager, Waterpark, Hansmanaged production documents of 108 buildings, and further, performed diligence reviews for emergencyservices, infrastructure buildings and design-build proposal of Mitsubishi Systems monorail station. Alternativebuild-out residential-hotel apartments and retail amenities studied.Atlantis Residential Hotels, Palm Island Dubai, UAEProject Manager, Codes, twin tower 900 residential condominium luxury vacation units with shopping centre,sports facility and parking podium on adjacent lots to AtlantisKerzner International Hotel, Mazagan Beach Casino and Golf Resort, Mazagan, MoroccoProject Manager, Codes, on Northpoint design for 500 suites low rise hotel and casino complex with golf coursesPage |5 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0and spa, first phase of three hotels, sports academy, grade related villa residences build-out and twinned links stylegolf courses on the Moroccan Atlantic coast south of CasablancaMANUFACTURINGVelcro Canada, Brampton, ONCapital assessment review of flammable adhesives storage and application facilities and upgrade. All aspectsconsidered to replace the existing and expand flammable liquids capacity while enabling continuous productionoperations throughout construction activity utilizing conventional procurement. Project Manager/ SeniorArchitectural Lead coordinating AEC team on new facility, including onsite inspections during construction.Adams Brands, Toronto, ONPhased expansion of operations at a food processing facility with ongoingproduction. Programmes included new mechanical penthouse and sugar silo.Senior Architectural Leader, design executed enabling continuous operationsthroughout construction activity utilizing conventional and design-buildprocurement.Adams Brands Flavour Laboratories, Toronto ONStorage vault and explosion resistant blending laboratories addition executed to enable continuous productionoperations under design build contract, for future production expansion of the Halls brand for the entire westernhemisphere. Senior Architectural Leader, for production documents and construction inspectionsAUTOMOTIVEToyota, TMMAL Engine Plant, Phase III Expansion, Huntsville, ALProject Manager, Codes, Plant and offices $300 mn expansion, including life safety impact review of existing plant 2facility, yielding a 37,000 m facility, the only Toyota plant globally to produce four cylinder, V6 and V8 engines.Toyota, Aluminum Engine Casting Plant Expansion, Jackson, TNProject Manager, Codes, Office and multi-phased three-fold plant expansion, including life safety impact review of 2existing plant facility, providing a 23,000 m facility.General Motors Company of Canada, New West Paint Shop and Trestle, Oshawa, ON 2Senior Architectural Leader, 186,000 m building and linking trestle for two-stage, phased integration of new paintshop operation to expand existing ongoing production facility. Hailed as the world’s most advanced car body paintshop incorporating five lines capable of producing over 3,000 cars per day, this facility utilizes complex life safetyand exiting procedures integrated with the process to allow enhanced productivity. Executed design and value-engineering priorities for fast-tracked design-build turnkey delivery, the programmed all in-plant facilities includedmaintenance, in-plant stores, locker rooms, cafeteria and in-plant offices.Ford Motor Company of Canada, Oakville, ON 2Senior Architectural Leader, Retrofit V229 of 205,000 m building for ongoing production of the Windstarpassenger van line including 27 programme areas for new substation, mechanical systems upgrades, productionline changes, maintenance shops relocations, quality control shop relocation, in-plant stores, locker rooms,cafeteria and in-plant offices.SECURITY AND COMMUNICATIONSCIBC/INTRIA New Computer Room Main-frame upgrades, Mississauga ONToronto West cheque clearance centre new blade server computer room installation for initial 600 KWA serversallowing for future expansion to 900 KWA server installation to 4-5/9’s performance standard as tenancy upgrade.Page |6 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Senior Architectural Leader, executing AEC team design and production documents overseeing constructionactivity to enable continuous production operations throughout, utilizing design-build procurement.Durham Regional Police Tactical Response Temporary Facilities for OPG Sites, Whitby, ON –Senior Architectural Leader Selection of new leased premises and tenancy improvements necessary to temporarilyhouse Durham’s designated Ontario Power Generation tactical response team assembled to protect the nuclearpower generation sites of the region.Delivery Centre Security Upgrades OPG Sites, Pickering, and Darlington ONSenior Architectural Leader Warehouse security systems upgrading programme including x-ray screeningequipment installation, securing regional supply chain for nuclear power generation sitesSecurity Systems Training Centre Durham Region OPG Sites, Darlington ONSenior Architectural Leader Staff Training facility for security systems including x-ray screening equipmentprotection of the logistics supply chain for nuclear power generation sites of the region.CONDITION – CAPTIAL FUNDING AUDITSL3Com Campus Buildings Review, Toronto, ONSenior Architectural Leader Condition surveys of four building specialized research and manufacturing campus forlean manufacturing process consolidation and future R&D operations programmes focusing on real estatedispositions and revitalization of this flagship campus.Cambridge Public Works Buildings Review, Cambridge, ONSenior Architectural Leader Condition surveys of Roadworks, Vehicle Maintenance, and, Parks and Recreationmain and satellite yards for 25 year plan capital review report.Bombardier Downsview Executive Jets Delivery Centre, Toronto, ONSenior Architectural Leader Condition survey of fifty year-old hangar and pre-design assessment forconversion/renewal to executive jets delivery hangar plan capital review report.Depots Buildings Review, Oshawa, ONSenior Architectural Leader Condition surveys of Oshawa Transit Garage, Roads, Vehicles Maintenance, Parks,Animal Control, North Depot and Fire Hall facilities for capital review report.Peel Police Division 12 Building, Peel, ONSenior Architectural Leader Condition survey for determining scope of capital repair programme needed in leasedpremises.Velcro Canada Building, Brampton, ONSenior Architectural Leader Condition survey of flammables storage and glues applications rooms explosionventing for Ministry of Labour compliance, capital improvements and retrofit scope determination.Air Canada Cargo and Infield Maintenance Buildings, Toronto, ONSenior Architectural Leader Audit of newly delivered design-build facility for building fabric and operationssystems at Toronto Pearson International Airport as diligence prior to GTAA ownership transfer conducting all onsite inspections and preparing final report of findingsTRANSITCity of Brampton, Sandalwoods Yard, Brampton, ONSenior Architectural Project Leader, and Clerk of Works bus maintenance andgarage facility for new fleet of 196 buses built on accelerated construction schedule.Page |7 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Toronto Transit Commission – Hillcrest and Duncan Shops, Toronto, ONSenior Architectural Project Leader Phased relocation and expansion of engine repair shop operations at the mainbus and streetcar shops. All aspects have been executed to enable continuous production operations throughoutconstruction activity utilizing conventional procurement.GO Transit, Union Station Corridor Renewal, Toronto, ONSenior Architectural Project Leader Upgrading of platform access from the existing station and commuter hallsallowing for future expansion of passenger services and new retail mall in old west teamway. The programmingestablished life safety and design go-forward strategy for adding retail tenancies.WAREHOUSING AND DISTRIBUTIONUAP/NAPA Canada, Cambridge, ONSenior Architectural Project Leader New 120,000 sq. ft. Canadian head office and distribution warehousing forexpansion of Canadian market operations, through Giffels Design-Build services1994 - dateARCHITYPES Inc.Architectural Project ManagementToronto, ONPresidentProject Manager, Contracts for:Mekinda Snyder ArchitectsVictor J Heinrichs, ArchitectLarry Glazer ArchitectsStevens Burgess ArchitectsErnst Annau Associates, ArchitectsHEALTH CAREShepherd Lodge, Toronto, ONProject Manager, Phased redevelopment and expansion of services to 252 bed long-term care and Alzheimer’spatient facility with recreation, meeting and exercise rooms, medical centre, dispensary and retail,required replacement of 150 occupied long-term care “D beds”, in new 7storey facility while maintaining existing 2storey with residents in-place, completing design approvals and production documentsPage |8 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0CPL Shuniah Street, Thunder Bay, ONProject Manager, New, 157-bed long term care facility including life safety systemsdesign, approvals and production documentsSandhills, Phase 1, Kitchener, ONProject Manager, 96-unit, six-storey residential apartments with communitycentre. First phase of four-tower block and street related retail commercial mewsdevelopment of urban church lands.Father Bauer Hospice and Luther Village, Phases 1 – 4, Kitchener, ONProject Manager, Long Term Care Hospice and grade related bungalows andapartment block barrier-free adaptive aging in-place community housing.Just Like Home, St. Jacobs, ONProject Manager, Prototype seniors residential long term care and life lease apartment facilityRESIDENTIALOne Shaftsbury Community, Toronto, ON56 units, life-lease luxury residential townhome and apartment complex with pool, exercise and health clubfacilities, Wein Stube, and Chamber Music Concert Studio, straddling the TTC subway station box at Summerhillstation. Project Manager responsibilities extended from design development, site plan agreement, TTC liaison andagreement, bidding and cost controls implementation, payment application review and site reviews includingindustrial waste cleanup, and monitoring geotechnical specialists reports on Station Box movement to the TTC, andsound/seismic isolation techniques design for consultant professor’s approval.Jubilee Terrace, Toronto, ONIsmaili Islamic Community non-profit housing development in 144-unit, 7-storey facility Project Manager,providing coordination of religious, architectural design, drawing production, specification writer, landscapearchitecture and engineering consultant teams, tendering and obtaining Ministry of Housing approvals.CONDITION – CAPTIAL FUNDING AUDITSToronto Mennonite Community and Long Term Care Senior’s Housing, Toronto, ONProject Manager Wall systems failure investigation, report of findings and proposal for remediation for low-riseapartment building, for unique integrated family living with senior’s in a community home.Metro Toronto Housing Authority, Toronto, ONProject Manager Life safety systems retrofit for 17 high-rise apartment buildings. Reviewed, value-engineered,amended and implemented contract documentation for capital programme of fire code retrofit.Province of Ontario, Municipal Affairs and HousingCondition assessment of staff office spaces for amalgamation of former provincial ministries for Urban Affairs andfor Housing. Team Leader of on-site inspections and audits.HERITAGEWindermere House, Fire Damage Redevelopment/Renewals Lake Rosseau, ONRestoration and redevelopment of famous Muskoka resort and heritage Hotel from the steamer boat vacationdays following near total destruction by fire – closeout inspections.Page |9 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0TRANSITCity of Toronto, Union Station Precinct Heating Plant, Toronto, ONIntegration of heat and ventilation systems plant upgrading using deep water heat-pump energy source -schematic design concepts and AEC lead.City of Toronto, Union Station West Teamway, Toronto, ONOld teamster access converted for pedestrian path to CN Tower Harbourfront – closeout inspections1990 – 1993Annau Associates Architects Inc.Toronto, ONDirector, Contract AdministrationDirector, Technical ServicesRESIDENTIALConcorde Park Condominiums, Tower 2,Toronto, ONProject Manager, Phase 2 38-storey, 468-unit residential condominium tower for multi-phased, mixed-use.Conducted technical and codes review of project contract documentation, directed weekly site reviews, attendedclient site meetings, monthly progress payment applications, and milestone technical inspections at substantialperformance, condominium registration takeover and post-commissioningwarranty period.Soper Court, Whitby,ONProject Manager, 64 unit townhouse social assisted housing development andcommunity centre completing provincial funding and municipal approvalsproduction documentation and contracts administrationParticipation House, Pickering, ONProject Manager, 48 unit townhouse type handicapped, special needs and barrier-free independent living unitscompleting provincial funding and municipal approvals, production documentation and contractsHERITAGEGoethe Institute, Toronto, ONProject Manager Designer, Redevelopment of site for the owner incorporating the listed Salter Jarvis Househeritage property to suit tenant needs of the federal German Cultural Institute. Design developed site planningand intensification alternatives options including mixed-use residential apartment extending ove adjacent lotaiming to retain the existing listed heritage quality building, Salter Jarvis House and property alone, conductedschematic and design development and costing, obtaining German federal Ministry of Culture funding support.Whitney Block, Ontario Legistature, Toronto, ONMaintenance replacement and repairs of roof windows and masonry on listed heritage 1930’s block convertedfrom departmental uses to legislative assembly constituent member’s and Ontario premier’s officesMedical Arts Building, Toronto, ONP a g e | 10 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Project Manager Designer, Phased heritage restoration of 1928 architectural detail and wall assembly correctionsand repair for Euromart Management and Cooperators Development Corporations. Conducted technical reviewincluding swing-stage inspection and directed photographic documentation of scope of work to remediatemasonry wall failure.COMMERCIALConcorde Square, Phase 3, Toronto, ONProject Manager, 10-storey speculative office block, third of fourplanned towers in mixed-use development complex. Conductedtechnical and codes compliance, review of contractdocumentation for sequential multiple-prime tendering, directedweekly site reviews, progress payment applications, attendedperiodic client site meetings and personally attended substantialperformance review of multiple prime contracts and finaltakeover technical review.EDUCATIONALEcole La Source, Barrie, ONProject Manager, Built for the Conseil scolaire de district duCentre-Sud-Ouest, a French only public school board the schoolbegan operations in November 1999. It was the final buildingproject of Canadian artist and architect Ernest Annau. I hadworked for nearly a decade both full time as Director, ContractAdministration, and Director, Technical Services leading ICIprojects of the practice, and documents.Rose Avenue Public School and Community Centre, Toronto, ONProject Manager, Conversion of inner-city school in St. JamesTown to provide school, community centre and daycare facilities.Attended client interview of project teams for award ofcommission, conducted technical inspection of existing building,conducted codes review and developed compliance alternatives,assisted formulation of schematic design alternatives, conductedclient/consultant meetings, liaison with municipal officesinvolved, directed principal architectural detailing, preparation ofoutline specifications and conclusion of design developmentstage, all to obtain necessary municipal, provincial and Board ofEducation funding approvalsBlantyre Avenue School, Scarborough, ONProject Manager, Capital assessment of original 1930’s buildingfindings advocated complete new building based on life safetyand capital condition. Developed schematic design for codescompliance and technical overview of production documents.Toronto Board of Education, Essex Public School, Toronto, ONProject Manager Designer, Stakeholder meetings, Programmefacilities, life safety and barrier-free access retrofit compliance ofboth the junior and senior schools. Conducted technical reviewof existing building, teacher and parent liaison committeesdirected design for approvals and contract documentation,contract administration and then, conducted in-depth technicalreview supporting legal proceedings against the contractorP a g e | 11 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0CONDITION – CAPTIAL FUNDING AUDITSCityhome, 64 Property Homes, Toronto, ONProject Manager Designer, Investigation and audit of city owned property for the creation of maintenance capitalfund and the assessment of intensification potential of sites involved (City of Toronto Non-Profit Housing).Projected capital costs, inspected all buildings on 64 sites, provided cost evaluations and wrote reportdocumenting the range of repairs required on a priority basis, and assessed each site’s potential forredevelopment and intensification including zoning analysis and preliminary schematic design vignettes for the sixmost advantageous sites, that capital funding would be established for transfer of ownership of these propertiesfrom the municipal corporation to its separate corporate entity responsible for assisted rentals housing.1988 – 1990Kirshenblatt Korman AssociatesToronto, ONAssociate / Chairman, Project Management Committee / Team Leader, High-Rise and Mixed-Use ProjectsRESIDENTIALThe Gallery, Toronto, ONProject Manager, 27-storey, 190-unit market residential condominiums, four-storey office and ground floor retail,mixed-use complex retaining designated heritage building facade - requested by partners to take-over contractadministration duties at year delayed partial occupancy, conducting complete on-site technical reviews and costsof construction errors and defects, as diligence for Owner’s successful legal proceedings against contractor.Vogue International, Toronto, ONProject Manager Designer, 320-unit, 15-storey residential condominium complex with pool exercise and healthclub with meetings and business centre. Conducted client AEC consultant meetings, completion of schematicdesign, design development, codes review and interpretation, primary detailing of all architectural systems,selection of engineering consultants, coordination of consultant documents, completion of contractdocumentation including specifications for sequential multiple prime contracts.RESIDENTIALWaldorf Plaza, Whitby, ONProject Manager Designer, 134-unit, 11-storey residential condominiums with pool and recreation rooms inmixed-use development complex. Conducted design development, coordination of consultant engineering designsand documentation, directed preparation of all contract documentation including specifications, site planapprovals and building permits, conducted all field review, contract administration and client/contractor meetingsto substantial completion.Kressview Springs, Cambridge, ONProject Manager Designer, 137 unit, 13-storey market residential condominium with pool, exercise and meetingrooms. First phase of mixed-use, three-phased development on valley side site with drop of over 80 ft. in grade.Responsibilities included design of 137-unit configuration. The project was fast-tracked to begin construction offoundations in three months from start of schematic design, conducted all zoning reviews, code interpretations,application for site plan approval, selection of owner’s structural engineering consultants, schematic design anddesign development, primary architectural systems detailing, all contract documentation for multiple primecontracts to tendering of superstructure and building envelope and initial field reviews.P a g e | 12 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K01984 – 1988Anthony Kemp Architects Inc.Toronto, ONSenior Project Manager/ Project Manager / Lead Designer/ Job CaptainHOTELS AND RESORTSHarbour Castle Hotel, Convention Centre Expansion, Toronto, ONProject Manager Designer, Conversion and vertical expansion ofexisting convention centre for Li Kai-Shing’s Copthorne Holdings,including integrating TTCs new LRT station-box connection andnegotiating restoring to the site use of prior City of Toronto and TTCeasements flanking Bay Street. Canadian Architect Yearbook 1987.Harbour Castle Hotel, Chartroom Lounge, Celebrities Disco, Toronto, ONProject Manager Concurrent design-build conversion of main bar, lobby lounge facilities and the night club.Strategic planning, schematic design, design development, consultant systems coordination, multiple primecontract tendering, field administration - coordinated work for fabrication off site then within 30 days from thselective demolitions all assemblies were brought in and installed, for Gala 10 Anniversary Opening.Harbour Castle Hotel, Chairman’s Suites, Toronto, ONProject Manager Design-build conversion of standard suite penthouse floor to multiple-plan rental luxuryexecutive suites accommodations for international executives. Schematic design, design development,coordination of engineering consultants, furnishings appointments liaison, codes interpretations, building permits,architectural field reviews.Harbour Castle Hotel, Celebrity SuiteToronto, ON – Project Manager, Designconversion of fifth floor suites to exoticaccommodation for internationalexecutives. Design of strategic optionsand alternatives, codes interpretations,schematic design, field administration ofmultiple prime contracts, for on timechampagne business community opening.Harbour Castle Hotel, Executive Offices and Retail, Toronto, ONProject Manager Conversion of lower lobby coffee shop area. Strategic options analysis yielded three boutiquerental spaces additional to the programme, schematic design, design development, contract documentation forsingle prime contractor, all field and contract administration duties.WAREHOUSING AND DISTRIBUTIONToys ‘R’ Us, Head Office and WarehouseToronto, ON - Conversion of manufacturing and warehouse facility with offices.Toys ‘R’ UsLondon, ON - Last of the five original stores ordered for Canadian market expansion, and first finished of five.Toys ‘R’ UsLondon, ON - Last of the five original stores ordered for Canadian market expansion, and first finished of five.SPORTS AND RECREATIONCraigleith Ski Club, Craigleith, ONPhase 1 of 2-phase expansion of main clubhouse facilities, including lockers,change rooms, cafeteria, administration offices and children’s daycare wing.P a g e | 13 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0HEALTH CAREGroup Practice Tenancy, Ontario Nursing Association, Toronto, ONSix Obstetrician-Gynecologist practitioner private medical offices on a single floor tenancy lease.Flamboro Community Medical Centre, Milton, ONTriage and family medicine centre for six practitioners1981 – date TMArchitypes / Kastania Construction Ltd.Toronto, ONPresidentAronowicz Residence, Toronto, ONGreisman Residence, San Diego, CA330 Berkeley Street Toronto, ON162 Amelia Street, Toronto, ONCHIN Radio Transmitter, Toronto, ONSited on disused water treatment plant cisterns on Toronto Island in agreement with City of Toronto for expansionof CHIN multi-ethnic broadcast operations on new 24 hour 17 language programme.East-West Furs, Toronto, ONConversion of industrial plant for relocation of Montreal fur factory.1977 – 1981Page & Steele ArchitectsToronto, ONAssistant Designer / Junior DesignerFirst Bank Plaza, Dallas, TXTwin 72-storey towers featured as J.R. Ewing’s office in the television series “Dallas”.New York Life, Toronto, ONSchematic Design - Office tower and chapel redevelopment of the St. Andrew’s church site. New church providedin urban courtyard flanking the towerRenaissance Plaza, Toronto, ONAssistant Schematic Designer, - 27-storey luxury residential condominium, office and retail mixed-use on the site ofthe Church of the Redeemer while preserving that heritage building in place with its historic Casavant pipe-organ.Design incorporated building over and under Y- junction tunnels of the TTC subway Bloor and University lines.Atrium on Bay, Toronto, ONP a g e | 14 architypes@gmail.com M | 450 538-1270
    • Hans Goetze, AA Inter, BCIN, LEED-AP, Principal, 351 Chemin Boulanger, Sutton QC, J0E 2K0Assistant Designer, Schematic and Design Development - 1.1 million sq. ft., 13-storey, phased 3-tower atrium officeover two retail levels. Canadian pioneer of pressurized emergency smoke control life safety open floor design for aspeculative development allowing for up to 7,500 m2 single tenant floors avoiding ‘deep-plate’ with atrium daylighting of floors. Atrium extends through all floors linking all towers from lower below grade retail floor terminusof Toronto’s PATH pedestrian system linkage of all downtown core buildings to Union Station. Mixed-usecomponent residential 26 storey tower located on adjacent lot for office use zoning coverage bonusingTaxation Data CentreSudbury, ON - first facility in programme of decentralizingRevenue Canada national processing operationsHERITAGEDelta Hotel, Barrington Street Mall, Halifax, NSJunior Designer - conversion of heritage merchant warehousesto hotel/retail use. the entire street façade was retained including the stone Prince Of Wales building on Grenvillewhile a retail mall was incorporated with the development of a modern hotel the length of the block alongBarrington Street with grade related retail mall.University of Toronto, Sir Sanford Fleming Building, Toronto, ONJunior Designer - conversion of the drum-shaped lecture hall in 1977-8 of the Darling and Pearson (1907) firedamaged building to service modern standards with restoration of fire-damaged façade retaining the vitality of thisdistinctive memorial heritage building in use by the computer sciences engineering department of the campus.Currently this hall is serving also as an evening small concert venue standing next to the larger convocation hall onthe main campus circle.Seymour Place Christian Housing Association, London UKDesigner, Community Advocate - conversion of City of Westminster post-WWII abandoned 1882 heritage ferro-concrete and terracotta facade council-flats housing to 96 students, singles and family units using modern lifesafety strategies and competing against Westminster bid for MoE financing. We won due our higher utility for cost.The expertise gained in my body of work brings AEC team purpose, performance and profit, our win-win-wins.P a g e | 15 architypes@gmail.com M | 450 538-1270