ACI 2012 A POWERFUL ARSENAL GREEN BUILDING SCIENCE & RESILIENCE                                                           ...
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012TRIPLE BOTTOM LINE (TBL)1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012FAILURES OF PROFIT-ONLYAPPROACH IN BUILDING SECTORNOT CONSIDERED:•  OCCUPANTS’ HEALTH AND COMFORT•  ENVIRONMENTAL ...
ACI 2012FAILURES OF PROFIT-ONLYAPPROACH IN BUILDING SECTORNOT CONSIDERED:•  PROFIT POTENTIAL OF HIGH QUALITY PRODUCT,   DI...
ACI 2012THE MISSEDOPPORTUNITY OFSMALL-MINDEDTHINKING1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012LESS WOOD=MORE INSULATION1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012INSULATION VOIDS SUCK!5% GAPS=30%-50% REDUCTION IN R-VALUE1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
WINDOWS VS INSULATIONR-50 WALL w/ R-3 (U-0.33) ENERGY STAR WINDOW R-50 WALL 85%                    WHOLE WALL             ...
WINDOWS VS INSULATIONR-100 WALL w/ R-3 (U-0.33) ENERGY STAR WINDOW R-100 WALL 85%                   WHOLE WALL            ...
WINDOWS VS INSULATIONR-50 WALL w/ R-8 (U-0.125) PASSIVE HOUSE WINDOW R-50 WALL 85%                    WHOLE WALL          ...
ACI 2012  IAQ                   WE CANT RELY ON                        FLAWS FOR FRESH AIR.1020 SE HARRISON ST. PORTLAND, ...
ACI 2012  IAQ                   JUST LEAKY ENOUGH                        DOESN’T CUT IT.1020 SE HARRISON ST. PORTLAND, ORE...
ACI 2012AIR-BARRIER1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012   “THE AMOEBA MOMENT”          THE TRIPLE BOTTOM LINE AT HAMMER & HAND          THE TRIPLE BOTTOM LINE AT HAMMER ...
ACI 2012   “THE AMOEBA MOMENT”       THE EMPLOYEE=THE FOUNDATION1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012   “THE AMOEBA MOMENT”•      CORE BUSINESS-PROTECT EMPLOYEES•      HANDYMAN SERVICES•      UPCYCLED FURNITURE•    ...
ACI 2012   FROM OVERLAY TO CORE   POSITIVE FEEDBACK LOOP   PEOPLE   •  INDOOR AIR QUALITY, COMFORT, EMOTIONAL WELL      BE...
ACI 2012   FROM OVERLAY TO CORE   POSITIVE FEEDBACK LOOP   PLANET   •  LOW TOXICITY, LOW EMBODIED ENERGY, LOW      OPERATI...
ACI 2012   FROM OVERLAY TO CORE   POSITIVE FEEDBACK LOOP   PROFIT   •  MARKET DIFFERENTIATION, VIRAL BUMP FROM VERY      H...
ACI 2012                                              GROWTH IN“RESILIENT”                                   DOWN ECONOMY1...
ACI 2012   TBL IN BUILDING   BUILDING SCIENCE MAKES IT POSSIBLE   INTERDISCIPLINARY APPLIED SCIENCE   •  PHYSICS, CHEMISTR...
ACI 2012   RESILIENCE REQUIRES PERFORMANCE   “CAN’T MEASURE, YOU CAN’T MANAGE”   •      BUILD DURABLE ENVELOPES   •      A...
ACI 2012   TRIPLE BOTTOM LINE BUILDINGS   •      ARE RESILIENT   •      GOOD FOR PLANET   •      GOOD FOR PEOPLE   •      ...
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012   BEYOND PRESCRIPTIVE CODES1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012   BEYOND PRESCRIPTIVE CODES1020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
ACI 2012   POTENTIAL NEW CODE FORMAT   •  ANNUAL PERFORMANCE BUDGET   •  (BTU/FT2/YR)   •  ALLOWS MAXIMUM DESIGN FLEXIBILI...
ACI 2012   COLLABORATION IN BUILDING   COMMUNITY   •  A RISING TIDE LIFTS ALL SHIPS   •  OPEN SHARING OF SCIENCE, TECHNOLO...
ACI 2012   SHAKY FOUNDATION   “THE BUILDING SECTOR SPENDS ONE-TENTH AS   MUCH ON R&D AS THE NATIONAL AVERAGE FOR   OTHER I...
ACI 2012   RESILIENT, HIGH PERFORMANCE   BUILDINGS BASED ON SCIENCE   •  THE WHOLE IS GREATER THAN THE SUM OF      ALL PAR...
ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214   503.232.2447
Upcoming SlideShare
Loading in …5
×

Hagerman ACI Baltimore 2012

482 views
428 views

Published on

Published in: Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
482
On SlideShare
0
From Embeds
0
Number of Embeds
153
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Hagerman ACI Baltimore 2012

  1. 1. ACI 2012 A POWERFUL ARSENAL GREEN BUILDING SCIENCE & RESILIENCE SAM HAGERMAN Owner, Hammer and Hand Inc. President, Passive House Alliance Portland, OR1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  2. 2. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  3. 3. ACI 2012TRIPLE BOTTOM LINE (TBL)1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  4. 4. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  5. 5. ACI 2012FAILURES OF PROFIT-ONLYAPPROACH IN BUILDING SECTORNOT CONSIDERED:•  OCCUPANTS’ HEALTH AND COMFORT•  ENVIRONMENTAL IMPACT (EMBODIED & OPERATIONAL ENERGY, TOXICITY, ETC.)1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  6. 6. ACI 2012FAILURES OF PROFIT-ONLYAPPROACH IN BUILDING SECTORNOT CONSIDERED:•  PROFIT POTENTIAL OF HIGH QUALITY PRODUCT, DIFFERENTIATED FROM REST OF MARKET•  EMPLOYEES’ HAPPINESS.1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  7. 7. ACI 2012THE MISSEDOPPORTUNITY OFSMALL-MINDEDTHINKING1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  8. 8. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  9. 9. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  10. 10. ACI 2012LESS WOOD=MORE INSULATION1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  11. 11. ACI 2012INSULATION VOIDS SUCK!5% GAPS=30%-50% REDUCTION IN R-VALUE1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  12. 12. WINDOWS VS INSULATIONR-50 WALL w/ R-3 (U-0.33) ENERGY STAR WINDOW R-50 WALL 85% WHOLE WALL R-15 R-3 (70% REDUCTION) 15%
  13. 13. WINDOWS VS INSULATIONR-100 WALL w/ R-3 (U-0.33) ENERGY STAR WINDOW R-100 WALL 85% WHOLE WALL R-17 R-3 ONLY 2% BETTER THAN R-50 15%
  14. 14. WINDOWS VS INSULATIONR-50 WALL w/ R-8 (U-0.125) PASSIVE HOUSE WINDOW R-50 WALL 85% WHOLE WALL R-37(R-8 WINDOWS) R-8 VS 15% R-15(R-3 WINDOWS)
  15. 15. ACI 2012 IAQ WE CANT RELY ON FLAWS FOR FRESH AIR.1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  16. 16. ACI 2012 IAQ JUST LEAKY ENOUGH DOESN’T CUT IT.1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  17. 17. ACI 2012AIR-BARRIER1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  18. 18. ACI 2012 “THE AMOEBA MOMENT” THE TRIPLE BOTTOM LINE AT HAMMER & HAND THE TRIPLE BOTTOM LINE AT HAMMER & HAND THE TRIPLE BOTTOM LINE AT HAMMER & HAND1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  19. 19. ACI 2012 “THE AMOEBA MOMENT” THE EMPLOYEE=THE FOUNDATION1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  20. 20. ACI 2012 “THE AMOEBA MOMENT”•  CORE BUSINESS-PROTECT EMPLOYEES•  HANDYMAN SERVICES•  UPCYCLED FURNITURE•  HOME PERFORMANCE•  PASSIVE HOUSE1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  21. 21. ACI 2012 FROM OVERLAY TO CORE POSITIVE FEEDBACK LOOP PEOPLE •  INDOOR AIR QUALITY, COMFORT, EMOTIONAL WELL BEING, EMPLOYEES ENGAGED IN MEANINGFUL WORK1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  22. 22. ACI 2012 FROM OVERLAY TO CORE POSITIVE FEEDBACK LOOP PLANET •  LOW TOXICITY, LOW EMBODIED ENERGY, LOW OPERATIONAL LOAD, LONG LIFE CYCLE1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  23. 23. ACI 2012 FROM OVERLAY TO CORE POSITIVE FEEDBACK LOOP PROFIT •  MARKET DIFFERENTIATION, VIRAL BUMP FROM VERY HAPPY CLIENTS, ATTENTION FOR THOUGHT LEADERSHIP1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  24. 24. ACI 2012 GROWTH IN“RESILIENT” DOWN ECONOMY1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  25. 25. ACI 2012 TBL IN BUILDING BUILDING SCIENCE MAKES IT POSSIBLE INTERDISCIPLINARY APPLIED SCIENCE •  PHYSICS, CHEMISTRY, BIOLOGY •  HUMAN ECOLOGY AND ECONOMICS1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  26. 26. ACI 2012 RESILIENCE REQUIRES PERFORMANCE “CAN’T MEASURE, YOU CAN’T MANAGE” •  BUILD DURABLE ENVELOPES •  ACHIEVE THERMAL PERFORMANCE •  FLAWLESS AIRTIGHTNESS •  EFFICIENT VENTILATION1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  27. 27. ACI 2012 TRIPLE BOTTOM LINE BUILDINGS •  ARE RESILIENT •  GOOD FOR PLANET •  GOOD FOR PEOPLE •  BUILDERS MAKE MONEY •  PEOPLE SAVE MONEY1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  28. 28. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  29. 29. ACI 2012 BEYOND PRESCRIPTIVE CODES1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  30. 30. ACI 2012 BEYOND PRESCRIPTIVE CODES1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  31. 31. ACI 2012 POTENTIAL NEW CODE FORMAT •  ANNUAL PERFORMANCE BUDGET •  (BTU/FT2/YR) •  ALLOWS MAXIMUM DESIGN FLEXIBILITY TO ACCOMMODATE LOCAL CONDITIONS1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  32. 32. ACI 2012 COLLABORATION IN BUILDING COMMUNITY •  A RISING TIDE LIFTS ALL SHIPS •  OPEN SHARING OF SCIENCE, TECHNOLOGY, AND TECHNIQUES1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  33. 33. ACI 2012 SHAKY FOUNDATION “THE BUILDING SECTOR SPENDS ONE-TENTH AS MUCH ON R&D AS THE NATIONAL AVERAGE FOR OTHER INDUSTRIES” -ARCHITECT MAGAZINE OCTOBER 20091020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  34. 34. ACI 2012 RESILIENT, HIGH PERFORMANCE BUILDINGS BASED ON SCIENCE •  THE WHOLE IS GREATER THAN THE SUM OF ALL PARTS, JUST AS IN 3BL •  COLLABORATION OF DISCIPLINES WILL HAVE THE GREATEST IMPACT1020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447
  35. 35. ACI 20121020 SE HARRISON ST. PORTLAND, OREGON 97214 503.232.2447

×