Your SlideShare is downloading. ×
0
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Seamless stainless construction 3 2010
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Seamless stainless construction 3 2010

196

Published on

Published in: Business, Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
196
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Constructing the Seamless - Stainless Steel Nitric Packaging for General Container March 30 th , 2010
  • 2. Welding <ul><li>Stainless body sheet is loaded into butt welder </li></ul>
  • 3. Welding <ul><li>Body sheet is welded </li></ul>
  • 4. Welding <ul><li>Inner weld discoloration </li></ul>
  • 5. Passivation <ul><li>Passivation of the outer weld removes carbon and discoloration </li></ul>
  • 6. <ul><li>After inserting ro-bars, ends and foot rings are welded in place. </li></ul>
  • 7. <ul><li>Weld tips are automatically fed. </li></ul>
  • 8. <ul><li>Welded drum from back side of welder. </li></ul>
  • 9. <ul><li>In-Line Leakproofness Tester </li></ul>
  • 10. <ul><li>Close up of testing rotation feature </li></ul>
  • 11. <ul><li>Welded drum undergoing Leakproofness Test </li></ul>
  • 12. <ul><li>Verification of Bottom Embossment </li></ul><ul><li>per CFR 178.153(b). </li></ul>
  • 13. <ul><li>Filling the drum with </li></ul><ul><li>Citric Passivation solution </li></ul>
  • 14. <ul><li>Rotating drum with Citric Passivation solution for 30 minutes </li></ul>
  • 15. <ul><li>Test indicator of successful passivation - no trace of carbon discoloration. </li></ul>
  • 16. No trace of carbon discoloration
  • 17. <ul><li>Inside view of drum after solution is emptied </li></ul>
  • 18. <ul><li>Drying the interior </li></ul><ul><li>of the drum. </li></ul>
  • 19. <ul><li>Neutralizing the drum exterior </li></ul>
  • 20. <ul><li>Final Wiping </li></ul>
  • 21. <ul><li>UN label affixed, and drum is bagged </li></ul>
  • 22. <ul><li>Boxed </li></ul>
  • 23. <ul><li>Palletized </li></ul>
  • 24. <ul><li>Ready to ship </li></ul>
  • 25. Marty, Howie, Brian, Thank you for your patience and support! Howard + Dean

×