Mapping out your journey to Converged Infrastructure

  • 1,126 views
Uploaded on

Converged Infrastructure implies the ability to pool resources, streamline management, and in the end, the ability to more rapidly and flexibly provision infrastructure and services. If planned and …

Converged Infrastructure implies the ability to pool resources, streamline management, and in the end, the ability to more rapidly and flexibly provision infrastructure and services. If planned and executed well, convergence not only lowers complexity for customers but also enables shared-service model of computing - path towards private cloud. This session will offer the blueprint for developing a detailed plan based on objective analysis and capabilities most relevant for converged infrastructure adaption within your data center. You will hear how HP Converged Cloud Capability Model speeds-up the planning phase across people, process and technology.

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
1,126
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
108
Comments
0
Likes
3

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice2 BB2582 – Mapping out your journey to Converged Infrastructure Chris Coggrave /June 12, 2013
  • 2. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice3 Challenges and questions Lots of challenges: • Rate of change is increasing • New technologies, new IT delivery models • Aging data centres and IT • Increasing business demands • Lack of alignment with the business And even more questions: • What will happen in the future? • How can we understand what is important ? • How can we prepare for all this? • What action should we take ?
  • 3. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice4 Key data center challenges Financial LegalRisk Environment Technology Adapt Optimize Manage Transform External Internal Regulatory Space Power Cooling CapacityAvailability Labour Skills Energy UtilizationCost Obsolescence Issues Converge Strategy – Plan – Design - Implement Applications Storage Network Management FacilitiesServers
  • 4. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice5 IT infrastructure is being stretched too far SecurityCloud Big Data Mobility Rigid Infrastructures 30% 70% New IT Project Initiatives Ongoing IT Operations Too many products Too many tools Set approvals, Access controls Test and quality Activate service Coordinate install process Business selects application Patch VMs, OSs, applications IT plannin g meetin gs Set up networ ks Purcha se assets Set up Facilities Set up stora ge Load OS The image part with relationship ID rId18 was not found in the file. Load OSs Install servers Load VMs The image part with relationship ID rId18 was not found in the file. Deploy applicati on Manage over lifecycle With too complex processes Yields too little innovation
  • 5. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice6 The data center of the future Efficient and effective Modular and elastic Shared resource pools Real time monitoring & controlPolicy based Fully service oriented Fully automated Self regulating Green Mature standardized processes Fully available and resilient Business centric Integrated Right sourcing Converged
  • 6. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice7 Moving from present to future Traditional data centre Converged Data Center
  • 7. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice8 With a destination: Converged Cloud Which requires a roadmap: Transformation Journey And a vehicle to help you get there: Converged Infrastructure Getting there - it’s a journey.....
  • 8. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice9 • Build & consume right mix of services based on service requirements • Leverage best of traditional IT, private, managed & public cloud • Manage & secure hybrid environment to reap value & mitigate risk The Destination – Converged Cloud Build on-premises cloud services Consume off-premises services Services Anywhere HP Converged Infrastructure The Ideal Foundation for Cloud
  • 9. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice10 Dedicated Technology Focus Project-based IT islands Virtualized Optimization Focus Virtualization Consolidation Automated Services Focus IT/business alignment Service portfolio & catalog Agility focus Self-service hybrid sourcing Dynamic, automated scalability Business Focus IT as a business Global class, supply services internally & externally Service broker Infrastructure & Operations Maturity Cost Reduction The Road Map: Data Center Transformation Journey Developing flexible infrastructures to support hybrid IT delivery models Elastic Service providerStandardized Optimized Service enabled Shared Private Cloud Hybrid Cloud Public Cloud Converged Infrastructure Converged cloud
  • 10. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice11 The Vehicle: HP Converged Infrastructure Accelerating IT for better business results The Foundation for HP Converged Cloud What is it? HP Converged Infrastructure is a blue print for the data center of the future that accelerates the provisioning of IT services and applications by integrating servers, storage, networking, security, power, cooling and facilities into shared pools of interoperable resources – all managed through a common management platform, delivered via world-class services. Facilities Services Servers Management Storage SecurityNetwork
  • 11. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice12 Levels of convergence AppSystem VirtualSystem BladeSystem CloudSystem
  • 12. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice13 Drivers • Organisation size • Skills • Culture • Vendor alignment • Existing management tools • Existing process maturity • Standardisation • Timing • Financial • Risk aversion
  • 13. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice14 Conventional Infrastructure Converged Infrastructure Network Server Storage Management Security Consolidate Standardise Virtualise Automate Share Tactical Approach Strategic Approach Move forward at your own pace and preference Simplest way to transform your data center A comprehensive, holistic plan that includes facilities, IT infrastructure, people & process Individual projects to improve data center efficiency and effectiveness through incremental introduction of modular building blocks
  • 14. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice15 Converged Infrastructure Benefits 0 10 20 30 40 50 60 Lower data center facility power and cooling costs Improve disaster recovery Improved business agility Lower total cost of ownership Improve utilisation of IT resources Fewer management tools and improved IT staff efficiency Those that are aware of Converged Systems (n=77) Current users of Converged Systems (n=60) IDC Worldwide Converged Systems 2012-2016 Forecast: Adoption Fueled by Faster Time-to-Market Demands, doc #237979, November 2012.
  • 15. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice16 IDC Survey – Business Value of Convergence Methodology Survey to evaluate the business value increase that enterprises achieve as they advance their convergence maturity. • “Work”: Throughput the data center pushes through - by assessing the network capacity to / from the data center. • “Converged-ness”: The percentage of the data center resources that administrators can deploy from a pooled collection. • “Cost”: Annual budget for equipment hardware, infrastructure software and IT infrastructure administration staff. • Results are presented in three categories: • IT labor costs per GB throughput – total data center throughput divided by the IT labor to manage all data center operations • Mean time to deploy new services such as a new application • Infrastructure and application availability Source: IDC, Business Value of Converged Infrastructure: A Research Brief for a White Paper Sponsored by Hewlett Packard, Doc #228577, May, 2011
  • 16. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice17 Effect of Increased Convergence Levels on IT Costs, Uptime, and Speed of Deployment Most enterprises are here
  • 17. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice18 Converged Infrastructure Challenges 0 20 40 60 IT organisation not structued to implement required changes in processes and policies Single point of failure Concerns about technical maturity/reliability Difficult to segregate/protect data across multiple users Difficult integrating with current infrastructure and management tools Lack of visibility into traffic patterns in converged systems Concerns with meeting application SLAs Single vendor lock-in Lack of staff skills Cost/doubt the projected ROI Those that are aware of Converged Systems (n=77) Current users of Converged Systems (n=60) IDC Worldwide Converged Systems 2012-2016 Forecast: Adoption Fueled by Faster Time-to-Market Demands, doc #237979, November 2012.
  • 18. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice19 What is the benefit to my business? What is Converged Infrastructure? How long will it take ? Where should I deploy it? What approach should I take? How does it relate to cloud ? How will it impact my business? How should I deploy it ? Key questions….
  • 19. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice20 Simplifying and Enabling the Future thru Convergence Converged Systems Converged Data Center • Fully Automated – Fully Agile – Fully Seamless Data Center • Simplify the customer experience – shifting your focus from IT to enabling the Business Converged Services = Foundational for:  Cloud | Big Data | Software-defined Data Center  Converged Management
  • 20. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice21 Converged Systems Virtualization Layer Choose: Cloud Layer Choose: Physical infrastructure Choose your configuration Partner Cloud CloudSystem Matrix Application Layer Choose: Portfolio of CloudMaps and Reference Architectures None None None CSM with auto flex + Partner Cloud CI System Platform
  • 21. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice22 HP Fusion Controller Servers Network Power & CoolingStorage Management Converged Management •one tool •one view •one model Simple, Fast, Powerful
  • 22. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice23 Converged Services Converged Management & Security Services Adapt people process and technology to transform to Converged Infrastructure • CI CM Model • CI Transformation Workshop • CI Strategy & Roadmap Service Architect, design, implement and integrate Converged Infrastructure products • CI Platform Migration Services • CI Discovery Service • CI Design & Implementation Services • Data Center Care Services Integrated CI Management with full lifecycle CI security services • CI Management Services • CI Security Services Converged System Services Converged Strategy & Roadmap Services
  • 23. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice24 Exploiting Converged Infrastructure Transformation Workshop Roadmap and Business Case Piloting Design Understand what converged infrastructure is, how it will impact the organisation and build a vision Define present and future states, build a roadmap between them and develop a business case Get hands on experience before deploying in an operational environment Develop an architecture & detailed design of a converged infrastructure for the data center ImplementationPlan, implement, test, train & manage deployment of a converged infrastructure in the data center CI-Capability Model Assessment Understand the capability and maturity of the existing IT Infrastructure
  • 24. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Converged Infrastructure Capability Model Assessment
  • 25. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice26 CI-CM Process HP Converged Infrastructure capability assessment NOTE: The CI-CM engagement process described here provides a general overview. The actual process may vary to best address your unique needs and priorities 1 2 3 456 Introduction to CI/CI-CM, gain customer sponsorship, explain CI- CM Questions Customer data gathering Face-to-face discussion to review data Preliminary discussion to review conclusions and draft recommendations Preparation for customer- specific recommendations Presentation of findings & recommended approaches
  • 26. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice27 Definitions CI-CM Domains Domains Technology & Architecture GovernanceCulture & IT Staff Management Tools & Processes Moving from dedicated hardware, software, database, network and infrastructure applications to more cost-effective pooled, shared, and automated resources Addresses resources used to plan, manage and improve infrastructure service delivery from project-based tools and information to standard, integrated tools / processes and information collection for end-to-end management aligned to the business Addresses the IT organizational structure, roles, responsibilities, work environment, etc. to move from technology-oriented to a more service-oriented, business centric environment Moving IT as a cost center (constrained to annual allocated budget) to an IT governance model that provides real time alignment of supply and demand with a consumption-based funding model
  • 27. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice28 Definitions CI-CM Stages of capability • Automatic management and reallocation of infrastructure based on business process needs • IT becomes a trusted business innovation partner • Hybrid Delivery - Infrastructure is offered as a combination of public and private cloud environments Flow management tooling allows the customer to combine multiple sources for IT capability into one integrated usage of IT resources • Service Enabled - Infrastructure offered as a service, with tiered service levels, supported by service centric integrated IT processes • Standardized - Standard technologies and architectures, standard management tools and processes, technology-based with Rationalized technologies and architecture, rationalized management tools and processes, with cross functional IT infrastructure expert teams • Silo - Project-based decisions and dedicated infrastructure, Ad Hoc management tools and processes, technology-based IT organization, cost center managed to budget. This delivery model can be found in most of IT organizations. It’s the traditional IT delivery model Stage 1: Silo Stage 4: Hybrid Delivery Stage 5: Dynamic reconfigurable services Stage 2: Standardized Stage 3: Service Enabled Capability
  • 28. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice29 Current and future state vis-à-vis industry averages CI-CM Stage 1: Silo Stage 4: Hybrid Delivery Stage 5: Dynamic reconfigurable services Stage 2: Standardized Stage 3: Service Enabled Stages Future State Customer Current State Personal Roadmap based on priorities Domains Technology & Architecture GovernanceCulture & IT Staff Management Tools & Processes • Dedicated, Project-Based • Standardized Technology • SOA- Compliant Infrastructure Services • Converged, Pooled, Automated Infrastructure • Technology Focused • Departmental/ Teams • Cross Functional Expert Teams • Service Focused • Business Process Focused • Manage to Project Resources & Budget • Centralized Policies, Supply Constrained • Centralized Governance • Supply Driven by Service Demand Forecast • Real Time Alignment of Supply to Demand • Project-Based Management Tools & Information • Ad Hoc IT Processes • Standardized Tools Standard IT Processes, ITIL • Policy-Based, End-To-End, Management • IT Processes Automated & Integrated with Business Processes Industry Average = • Consolidated, Virtualized, Shared Infrastructure • Integrated, Tools & Information • Collection Consolidated, Rationalized, IT Processes • Service-Based Management • Service Centric, Integrated IT Processes
  • 29. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice30 Current and future state mapping across domains – Example CI-CM • Governance • Culture & IT Staff • Management Tools & Processes • Technology & Architecture Comparisons can be based on: • Best in class versus industry averages comparisons • # of employees
  • 30. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Converged Infrastructure Transformation Workshop
  • 31. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice32 CI Transformation Workshop Building your customized high-level Converged Infrastructure roadmap in 1 day ! One day interactive roadmap discussion between 2 to 3 senior HP consultants and customer executives/IT management (about 5-7 persons) covering transformation phases and activities, resulting in high level customer specific CIT roadmap. After participation in the workshop, you will be able to: • Understand the benefits, scope, scale and all critical success factors • Identify quick wins • Gain stakeholder buy-in and give traction to any project • Leverage best practices • Make informed business strategy decisions • Lay out next steps in an plan of action Powerful representation of a Converged Infrastructure Transformation implementation with big size panels and graphics.
  • 32. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice33 CI Transformation Workshop Panels Today’s Challenges CI Vision Shared Resources Energy & Sustainability Connectivity Management Security Transformation Journey Business Case Organisational Impact
  • 33. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice34 Workshop roadmap board
  • 34. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice35 Process Discussion at the panels Map panel notes to roadmap board Complete roadmap board A highly interactive, thought- provoking workshop with key decision makers in a single day Present final report
  • 35. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice36 Learnings • Build consensus • Get everyone on the same page – what converged infrastructure is and is not • Understand your key business drivers • Develop a shared future vision • Clearly understand benefits and barriers • Get management buy in • Define scope and objectives clearly • Break down departmental stove pipes • Take an holistic approach – understand inter relationships • Define metrics for success
  • 36. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Converged Infrastructure Roadmap and Business Case
  • 37. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice38 CI Roadmap and Business Case Service Develop a road map and plan Format  8-16 weeks service, can be split into 3 segments  For CIOs who have decided to transform their organization to a shared service model, and want a comprehensive plan  A structured approach using HP’s Roadmap Capability Framework and sophisticated transformation planning tool.  Gap analysis between current state and vision with defined phases, end-states and benefits Results Module I: Future state definition Module II: Roadmap Planning report • Current state assessment • Transformation road map • Set of project briefs Module III: Business and ROI case Executive presentation on results
  • 38. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice39 Characteristics Technical Infrastructure &Architecture Service Management Framework Governance, Finance & Security Culture & Staff Best Practice Processes Service Portfolio Management Stage 5: Service Broker Cloud services optimized infrastructure Continuous value management optimization Value based pricing Embedded commercial & security management Business/commercial centric Value chain optimized processes Commercial service portfolio management Stage 4: Service Provider Automated Infrastructure pooling Value chain based service management Variable IT costing Optimized policy management Customer centric behavior Service strategy processes Service brokering Stage 3: Service enabled Shared virtualization infrastructure Integrated information & service management Service driven Policy principles Service focused Process Optimization Service with OLAs and specification Stage 2: Optimized Consolidated, negotiated functionality Enterprise IT information management Negotiated budget/resource management Expertise Teams Planning processes SLA based technology services Stage 1: Standardized Enterprise infrastructure architecture Management control by function/element Joint, agreed budget driven, hierarchical management Departmental silo’s & competency hero’s Operational processes Defined technology services Comprehensive roadmap for the journey Need to know where you are and where you are going
  • 39. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice40 Roadmap and Business Case Define Current State & Gap Develop Future State Create a Roadmap Build a Business Case
  • 40. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice41 CI readiness criteria Technology Management Governance • Consolidation, Virtualisation, Automation • Resource pooling/sharing • Capacity management • Control & decision making • Business – IT alignment • Supply & demand matching • Architecture & standards • Information availability • Monitoring & reporting • Integration of data • Dashboard & tracking People Process Services • Organisational structure • Roles and responsibilities • Culture, management style • Measurement & appraisal • CMM level attainment • ITIL adoption • Focus on process management • Level of process automation • Services catalogue • Services levels • Service provisioning • Service differentiation & pricing
  • 41. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice42 Deliverables • Present state assessment • Future state vision • Gap analysis • Transformation program plan • Project modules and interdependencies • Alternative scenario’s within the roadmap • Recommended organisational state • ROI and pay back analyses • Summary of benefits • Recommendations
  • 42. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice43 Learnings • It’s more than just technology – process & people • Involve all impacted areas of the business • Build cross functional teams • Focus on business case and not technology • Get a clear understanding of where you are starting • Identify political roadblocks and deal with early • Look for quick wins, communicate success • Sell benefits to impacted parties • Progress multiple domains in parallel • Define bite sized projects • Communicate
  • 43. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Summary
  • 44. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice45 Converged Services Converged Management & Security Services Adapt people process and technology to transform to Converged Infrastructure • CI CM Model • CI Transformation Workshop • CI Strategy & Roadmap Service Architect, design, implement and integrate Converged Infrastructure products • CI Platform Migration Services • CI Discovery Service • CI Design & Implementation Services • Data Center Care Services Integrated CI Management with full lifecycle CI security services • CI Management Services • CI Security Services Converged System Services Converged Strategy & Roadmap Services
  • 45. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice46 Critical Need: Relevant Cloud and CI Skills Gartner's 2012 CIO survey data showed that over 60% of CIOs surveyed across all industries and geographies indicate the need to significantly improve IT skills during the next four years. A lifecycle approach to CI & Cloud skills & experience
  • 46. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice47 Data Center Care • Build innovation and efficiencies for transformation and continuous improvement • Realize ROI with one accountable partner • Service experience built on a relationship delivers agility and excellence Business value Expert guidance Primary Service Provider Reactive Services Assigned Account Team Proactive Services Enhanced Call Handling Tailored Entire IT environment Single Point of Accountability HP Technology SupportHP Technology Consulting Strategy & Roadmap Architecture & Design Integration Cloud Critical Facilities IT Infrastructure Security Datacenter Care
  • 47. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice48 Maximizing the Investment to Convergence Sale-Leaseback – from fixed to flexible assets • Immediate cash infusion -> direct access to capital • Retain use and benefit of equipment (predictable refresh cycle) Buyback & Takeout – retire legacy systems • Maximize end-of-life value of assets -> remarket before recycle (HP & non-HP) • Disposition of current assets in compliance with industry standards (data privacy &security) Refresh Structure – IT lifecycle management • Ability to easily scale infrastructure up or down based on business needs • Optimize future technology updates (avoid asset lock-in) Flexible Investment – customized solutions • Move away from a costly asset ownership model (shift from Capex to Opex) – lower TCO higher ROI • Pre-owned and rental systems may help reduce transition costs
  • 48. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice49 HP Technology Services… the know-how to make technology work for you Support 1.7 million SAP users in 54 countries SAP Partner of the Year Delivered 100,000+SANs worldwide Customers in 90%+ of the Fortune 100 6,000 high-availability experts 48,000 Microsoft-trained professionals 13,500ITIL-certified professionals 7,600 network infrastructure & voice professionals 2,500+ ServiceOne partners Highest mission-critical customer loyalty: 95%+ Designed 50 million square feet of data centers, 60+ greenfield data centers, and 60% of all LEED- certified data centers Support available: • 24hx7, 365 days per year • Covering 24time zones • In 30+ languages • HP presence in 180 countries Deliver private cloud in 30 days 40,000+ CUSTOMER touchpoints daily 1,000+ Converged Infrastructure & CloudSystem implementations
  • 49. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice50 HP can help you on your journey • Market leading CI products • Lifecycle CI Services …from strategy to support • Unique expertise – models and tools • A trusted partner for your journey
  • 50. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice51 For more information ConvergedAttend these sessions • BB3550 Managing converged infrastructure: service availability for hybrid cloud delivery • Converged Infrastructure Trend 1: Converged Systems - Everything you need to know in 30 minutes • DT2581 Converged infrastructure trend 3: Software Defined Datacenters – top five things you need to know • TK2578 Converged infrastructure in a cloud world Visit these demos • HP Converged Infrastructure Consulting Services, 611 • Data Center Facility for a Converged Infrastructure, 610 • FlexibleDC, the future of modular data centers, 752 After the event • Contact your sales rep • Visit the website at: www.hp.com/services/convergedinfra structure Your feedback is important to us. Please take a few minutes to complete the session survey. Converged Infrastructure Transformation Workshop Bassano 2707
  • 51. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice52 Learn more about this topic Use HP Autonomy’s Augmented Reality (AR) to access more content 1. Launch the HP Autonomy AR app* 2. View this slide through the app 3. Unlock additional information! *Available on the App Store and Google Play
  • 52. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Thank you