Demir Olmezses CV
Upcoming SlideShare
Loading in...5
×
 

Demir Olmezses CV

on

  • 485 views

Professional Resume

Professional Resume

Statistics

Views

Total Views
485
Views on SlideShare
485
Embed Views
0

Actions

Likes
0
Downloads
2
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Demir Olmezses CV Demir Olmezses CV Presentation Transcript

  • Curriculum Vitae Hasan Demir Ölmezses DATE OF BIRTH : 17.06.1987 / Ankara - TURKEY ADDRESS : Goksu Evleri Sit. C30 Apt. No: 3 Anadolu Hisari / Beykoz / TURKEY PHONE : + 90 543 342 34 45 – + 90 541 736 70 50 EMAIL : demir.olmezses@huawei.com – demir.olmezses@gmail.com OBJECTIVE: To obtain a position that will enable me to use my strong technical and organizational skills, educational background, and ability to work well with people. SUMMARY OF QUALIFICATIONS MAIN SKILLS : SDH DWDM STM PDH ETHERNET EOSDH U2000 T2000 TRANSMISSION KITS USED : Huawei OSN1500 Huawei OSN3500 II Huawei OSN7500 Huawei OptiX OSN 1800 II Huawei OptiX OSN6800 Huawei OptiX OSN8800T16 Huawei OptiX OSN8800 T32 Huawei OptiX OSN8800 T64 EMPLOYMENT HUAWEI TECHNOLOGIES (19.01.2012–cont. ) Project Rollout Management Responsible, Huawei / Vodafone WSS & 1.2A DWDM Projects Rollout schedule planning and resource planning Rollout progress control Management of site implementation, leading to regular rollout meetings with customer and following-up of actions based on customer feedback Risk analyzing and taking proactive actions to be sure from the delivery of project Arranging subcontractor activities and evaluating performance
  • Network Integration Services Engineer, Huawei / Vodafone Trakya, Ring-Cut, WSS, 1.2A, FON East Projects OSN1500 / OSN3500 II / OSN7500 for SDH OptiX OSN 1800 II / OptiX OSN6800 / OptiX OSN8800 T32 for DWDM Commissioning, troubleshooting and acceptance of SDH & DWDM equipments PAC of SDH & DWDM equipments Creation of Services with protection Creation of Services without protection ASON implementation of Traditional Services and new ASON service creation ROAM to WSS Migration using Mirror system solution, in order to upgrade in-service capacity of DWDM from 40 to 80 channel (in Ring Cut Project and total service interruption time is 1 hour per site) ROAM to WSS Migration with using ROAM to WSM9 and M40 solution, in order to upgrade in-service capacity of DWDM from 40 to 80 channel (in WSS Project and total Service interruption time is 15 minutes per site) WSD9-RMU9 to WSM9-RDU9 Migration using RMU9 to WSM9 and after that WSD9-RDU9 solution, in order to upgrade in-service capacity of DWDM from 40 to 80 channel (in WSS Project and total service interruption time is 15 minutes per site) Network Integration Services Engineer, Huawei / VATHAS SDH Project OSN1500 / OSN3500 II Commissioning, troubleshooting and acceptance of SDH equipments PAC of SDH equipments Traditional Service creation Protection Service creation Customer Training for NMS operations Network Integration Services Engineer, Huawei / Med Nautilus Terrestrial Project OptiX OSN6800 / OptiX OSN8800 T32 Commissioning, troubleshooting and acceptance of DWDM equipments PAC of DWDM equipments Traditional Service creation and protection Service creation
  • ARASKOM A. . (10.01.2011–19.01.2012 ) Transmission Engineer, Huawei/Turk Telekom SDH-DWDM Project (Ankara) OSN1500 / OSN3500 / OSN7500 for Regional and Backbone SDH OSN6800 / OSN8800 for DWDM Commissioning, troubleshooting and acceptance of SDH & DWDM equipments Temporary acceptance of SDH & DWDM equipment Fiber Measurement with OTDR, PMD, CD equipment & Power Meter Huawei Network Management System OSN6800 / OSN8800 Adding ROADM & OLA sites to Netwok Management System Configuration of ROADM & OLA sites in Network Management System Supervising subconstractor in faulty sites Transmission & RF Planning Engineer, Huawei/Turk Telekom WIMAX Project (Ankara) Drive Test Module Tuning RF and Transmission Planning for Diyarbak r Sites SARF and TSS Report preparation & management Coordination for renting of WIMAX sites EDUCATION OSMANGAZ UNIVERSITY Electrical and Electronics Engineering (2004-2010) T.C. Mobil Anadolu Lisesi (2001-2004) LANGUAGES English : Fluent Chineese : Novice
  • OTHER SKILLS Operating Systems : Windows 95/98/2k/XP/Vista/7, Linux OpenSuse/Fedora/Ubuntu Tools: U2000, MDS 6600,MapInfo, Atoll, Pads, Autocad(other cad programs) , Matlab , MS Office(Advanced Visio skill), Opera, Orcad Programming Language : C Microprocessors: Z80, 8085,8255, 16f8xx series PLC:Siemens S7 200- S7 300 Series REFERENCES Veli Gulsen (Vodafone): veli.gulsen@vodafone.com +90 (542) 561 27 11 Cem Mert (VATHAS): cem.mert@vodafone.com +90 (542) 561 45 73 Sema Çapraz Kurt (Huawei) sema.capraz@huawei.com +90 (549) 642 89 74 Muharrem Samuk(Araskom) muharrem.samuk@araskom.com +90 (549) 454 40 00 Orkuthan Karadeniz (Araskom) orkuthan.karadeniz@araskom.com +90 (541) 454 40 05