Your SlideShare is downloading. ×
Qnt 561 qnt/561 final exam 100% correct answers
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Qnt 561 qnt/561 final exam 100% correct answers

294
views

Published on

Published in: Business, Technology

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
294
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
6
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. QNT 561 Final Exam ANSWERS ARE HERE 1. Which of the following is true about make-to-stock processes?A. Make-to-stock processes can be controlled based on the actual or anticipated amount offinished goodsB. Make-to-stock process is used when demand is seasonal and the firm does not haveenoughC. Services by their very nature often use make-to-stock processes.D. A and B2. According to your text, the most common process metric is:A. ProductivityB. UtilizationC. Throughput timeD. Efficiency3. ________ is when the activities in the stage must stop because there is no place to depositthe item just completed.A. BufferingB. StarvingC. None of these answersD. Blocking4. According to Hayes and Wheelwright, which of the following is not a major process flowstructure?A. Job ShopB. Assembly LineC. ProjectD. Batch5. The most important performance dimension for product development projects isA. QualityB. Product flexibilityC. Time-to-marketD. Productivity6. The major decision variables in equipment selection are:A. FlexibilityB. Labor requirementsC. ManufacturerD. Both A and B7. Quality Function Deployment:A. is a tool for translating customer requirements into concrete operating and engineering goals.B. facilitates inter-functional cooperation between marketing, engineering, and manufacturing.C. provides a better understanding and focus on process characteristics that requireimprovements.D both a and B.
  • 2. 8. Which of the following statements is true about value analysis/value engineering?A. the purpose of VA/VE is to simplify products and processes.B the objective of VA/VE is to achieve equivalent or better performance at a lower cost.C. VA is performed before the production stage, while VE deals with products already inproduction.D both A and B.9. In which phase of new-product design process are considerations to target market, desiredlevel of performance, investment requirements and financial impact made:A. detailed engineering.B. Preliminary process design.C. pilot manufacturing phase.D. concept development and product planning.10. Which of the following is not a dimension of design quality?A. Durability.B. Serviceability.C. Customization.D. Features.11. Testing is an example of:A. Prevention costs.B. Internal Failure costs.C. External Failure Cost.D. Appraisal costs.12. Which Quality Guru advocated that senior management is responsible for 94% of qualityproblems?A. Deming.B. Ishikawa.C. Juran.D. Crosby.13. Independent Demand is:A. demand that is related to the demand for another item.B. demand determined by the marketplace that requires forecasting.C. Inventory whose demand comes from independent suppliers.D. Inventory that is independent of any known rules of demand and supply.14. Which of the following statements is true about the Q-system?A. It does not have an EOQ, since the quality varies according to the demand.B. The order interval is fixed not the order quanity.C. It does not have a reorder point but rather a target inventory.D. The system is completely determined by the two parameters, Q and R.15. Which of the following is not an assumption of the basic economic-order quantity model?A. ordering or setup costs are constant.B. Quantity discounts are available.C. annual demand is constant and known.D. lead time is constant.16. Which of the following is not a principle of work-center scheduling?A. Schedule jobs as strings, with process steps back to back.B. Obtain feedback each day on the jobs that are completed at each work center.C. Once started, a job should not be interrupted.D. Reschedule every day.
  • 3. 17. The assignment method is appropriate in solving problems that have the followingcharacteristics?A. There are „n‟ things to be distributed to „n‟ destinations.B. Though each destination may handle all the things, the final assignment has each thingassigned to one and only one destination.C. Only one criterion should be used (minimum cost, maximum profit, for example).D. A and C.18. The objective of work-center scheduling include(s):A. To meet due dates.B. To minimize lead times.C. To minimize finish goods inventory.D. Both A and B.19. The measure of the firm‟s ability to make money according to Goldratt include:A. Net profit.B. Return on assets.C. Cash flow.D. Both A and C.20. Goldratt‟s rule of production scheduling include all but:A. An hour saved at a non-bottleneck is a marriage.B. A process batch should be fixed both along its route and in time.C. Do not balance the capacity-balance the flow.D. Utilization and activation of a resource is not the same thing.21. According to Goldratt and Fox, a useful performance measure to treat inventory is:A. Quick ratio.B. Dollar days.C. Inventory turnover.D. Current ratio.22. The advantages of pure project include all but:A. Decisions are made quickly.B. A team member can work on several projects.C. The project manager has full authority over the project.D. Team pride, motivation, and commitments are high.23. Which of the following is not a typical milestone?A. Training of project members.B. Completed testing of the prototype.C. Completion of design.D. Production of a prototype.24. “Slack” refers to the difference between:A. Observed and predicted times.B. optimistic and pessimistic times.C. Latest and earliest times.D. finish and start times.25. Which of the following statements are true about time-series forcasting?A. Time series analysis is based on the idea that the history of occurrences over time can beused to predict the future.B. Agent liability. Time series analysis tries to understand the system underlying andsurrounding the item being forecast.
  • 4. C. Under time-series methods, demand is divided into the time-based components such asdaily, weekly, etc.D. Time series methods are useful for long-range forecasts when the demand pattern is erratic.26. Which of the following product promotional activities would probably help make the supplychain more efficient?A. Special packaging for a specific event that occurs one time each year.B. A 2 for 1 price promotion.C. Price promotions that expire on a specific date.D. An “everyday” low price strategy where prices are not dependent on quantity delivered with aspecific order.27. According to Hau Lee, which of the following types of products need to be delivered withefficient supply-chains?A. Grocery Products.B. High technology products.C Customer products.D. Innovative products.28. Supply-chain response relates to the following?A. How quickly a customer order can be filled.B. How quickly a company can react to a new competing product.C. How inexpensive the product is.D. Both A and B.29. Which of the following statements is not true about capacity management in operations?A. Capacity planning itself has different meaning to individual at different levels within theoperations management hierarchy.B. the definition of capacity, in an operations management context, makes a clear distinctionbetween efficient and inefficient use of capacity.C. When looking at capacity, operations managers need to look at both resource input andproduct outputs.D. An operations management view also emphasizes the dimension of capacity.30. Capacity utilization rate can be computed as:A. Capacity used-best.B. Capacity used x best.C. Capacity used/best.D. Capacity used + best.