3. POWER FOR ALL
24X7
Record breaking
progress towards fulfilling
Hon’ble Prime Minister
Shri Narendra Modi’s
vision of...
3
AYearwhichstartedthejourneytowards‘YearRoundPowerforAll’
4. ACHIEVEMENTS
3.6%
22,566 MW
22,100 ckm
65,554 MVA
Power deficit
reduced to
the lowest ever
Highest ever
generation capacity addition
Highest ever increase
in Transmission lines
Highest ever increase in
Sub-station capacity
4
5. ` 3.35 LAKH Cr.
Highest coal production
growth in 23 years
8.3%
8.4%Power Generation Growth
(Highest in 20 years)
of potential revenues to coal bearing states through
transparent coal e-auctions & allotments
AYearwhichsurpassedpastrecords
First time ever,
exceeded
renewable
capacity
addition
targets in solar, wind, small
hydro etc.
Over
5
10. FROM
DARKNESS
TO
LIGHT
POWER
IS DELIVERED
THROUGH A
CHAIN OF
ACTIVITIES
A chain is only
as strong as the
weakest link
FUEL GENERATION
10
>24,000 MW of power
capacity idle due to lack
of fuel
Less than 1% of solar
potential realized
Power generation
exceeds 1 lakh Cr. units
for the first time
Plans to increase solar
capacity by
> 30 times
Highest coal
production growth in
23 years
Increased coal & gas
availability to revive
stalled projects
Annual production
growth of Coal only 1.5%
between 2010-14
Loss of ` 1.86 lakh Cr.
estimated by CAG in
Coal allocation
11. TRANSMISSION DISTRIBUTION CONSUMPTION
Measures to build an exceptionally strong
power delivery chain are on and are bearing results 11
Discoms losing
` 70,000 Cr. annually
and accumulated
losses of
> ` 2,50,000 Cr.
Spiralling
consumer tariffs
Lack of focused
energy conservation
efforts
28 Cr. people without
access to power
Largest power outage
in history with 62 Cr.
people in darkness in
2012
Approved new
schemes for
investment of
` 1.09 lakh Cr. in
Discoms
Overall energy deficit
down to 3.6%, the
lowest ever
Highest ever increase
in Transmission lines &
sub station capacity
(22,100 ckm and
65,559 MVA
respectively)
14. COAL
TAINT
CLEANING
REMOVING THE
ENERGY EMPLOYMENT ECONOMY
Cancellation of 204 coal blocks by Supreme
Court presented a potential grave crisis of:
Shutdown of
plants dependant
on cancelled coal
mines
Livelihood of thousands of
workers endangered
Economic activity halts,
NPAs mount
Crisis averted by focused action
through implementation of
transparent e-auction process in just
four months
14
15. REJUVENATED ECONOMY
Prevented NPAs, reduced import bill, generated momentum for
‘Make in India’ and raised resources for renewables & Ganga cleaning
through coal cess.
Coal Mines (Special Provision) Act & Mines and Minerals (Development
and Regulation) Amendment Act enacted to enable growth of coal
sector and provide for the welfare of locals particularly tribals in the
mineral bearing areas
Legislation Enabled
FUEL
15
REGIONAL
DEVELOPMENT
Coal bearing states like Jharkhand, Chhattisgarh, Odisha, West Bengal,
Madhya Pradesh, Maharashtra and Telangana to get potential revenue
(including auction proceeds and royalties) of
From auction of 29 Coal blocks & allotments of 38 coal blocks to
states/PSUs over the lifetime of the mines
`3.35 lakh Cr.
16. PRODUCTION
IMPROVEMENT
INCREASING
THROUGH EFFICIENCY
RFID/GPS tagging
Reduced Transportation Cost
Coal Project Monitoring Portal
Improved coal quality
Reduction in coal theft using
for quicker decision making, faster dispute resolution and
accelerated removal of bottlenecks
using compulsory crushing, washing and third party sampling
16
Coal linkage rationalization to reduce transportation costs and
save environment
17. DOUBLING
COAL INDIA
PRODUCTION
IN 5 YEARS
100Cr. Tonnes
by 2020
Double coal
production to
FUEL
17
Better evacuation of
coal planned by investing
massively in new railway rakes,
expediting railway lines,
modern equipment and
mechanization
Partnership between Railways,
coal-bearing states and Coal India
to strengthen infrastructure creation.
Signed MoUs with Odisha
and Jharkhand
Trebling exploration activities
for enhancing coal production
Over 60 new mines to be opened
19. 7,900 Cr.
units of power
Below
` 4.7/unit
24,150 MW of
Innovative and transparent
new scheme for making gas available
for power generation and generating Gas
Based
Power
Plants
Reviving these
will reduce peak load
shortages in summer and
ensure grid stability.
Many of the stranded
gas based power projects
are located in the Southern
region which is power
deficit due to transmission
constraints
over the next two years from
gas based capacity
FUEL
19
First round of auction
has resulted in power
20. RAPID INCREASE IN
GENERATION CAPACITY
5NEW
Ultra Mega Power Projects of
20,000 MW
to be setup in
plug-and-play mode
attracting an investment of
> ` 1 LAKH Cr.
20
21. 21
GENERATION
All clearances and linkages
will be in place before the
project is awarded by a
transparent auction system
Old plants to be upgraded to
enhance capacity and reduce
emission
Agreement signed for
expansion of Patratu
Thermal Power Station,
Jharkhand to
4,000 MW
FUEL>GENERATIONFUEL>GENERATION
22. 22
100,000 MW of Solar and
60,000 MW of Wind capacity
MORE THAN
32,000 MW to 1,75,000 MW
5 TIMES
India is running the largest
renewable capacity expansion
program in the world
Increasingtheoverall
renewablecapacitytargetby
from
by 2022
Green Generation for
Clean & Energy
Secure India
Renewable Purchase Obligation (RPO)
and Renewable Generation Obligation
( RGO) to boost renewable energy
GENERATION
Opportunityforunemployed
graduates&farmerstobecome
solar enterpreneures
24. 24
RAPID
GREEN
PROGRESS
We are like tenant farmers
chopping down the fence around our
house for fuel when we should be
using Nature's inexhaustible sources of
energy — sun, wind and tide.
– Thomas Edison
25. 1,112 MW
42%
Highest ever increase in
solar capacity of
increase in solar
capacity during
2014-15
Coal cess
quadrupled from
to help finance clean energy projects
and Ganga rejuvenation
Accelerated depreciation
restored for wind power
from July 2014 to help
increase wind capacity
25
solar parks
~1000 MW
with capacity of
each planned
17solar parks
in 14 states
have already
been approved
25
FUEL>GENERATIONFUEL>GENERATION
` 50 to ` 200/tonnes
Tender by NTPC to setup
of Solar Projects
2,170 MW
26. 26
TRANSMITTING &
DISTRIBUTING
POWER
POWERLESS TO POWERFUL
SMART GRID
SMART
GRID
National Smart Grid
Mission approved to
bring efficiency in
power supply
network and facilitate
reduction in losses &
outages
27. Level playing field in transmission
through seperation of
POSOCO and POWERGRID
GREEN ENERGY CORRIDOR
` 38,000 Cr.
project being rolled out to
ensure evacuation from
renewable energy plants
CREATING COMPETITION
` 1 LAKH Cr.
Electricity Act being amended to give consumers
a choice to choose and change power service
like a mobile connection. Competition will lead to
lower tariffs & better service
to be spent on transmission projects over the
next year
TRANSMISSION&DISTRIBUTIONFUEL>GENERATION>
27
28. ` 63,027 Cr.
Deendayal Upadhyaya
Gram Jyoti Yojana
Total Govt. expenditure
Feeder segregation
for 24x7 power
Adequate
power to farmers
New transformers
and upgradation
Remote Villages
of last mile infrastructure
to be covered: Off-grids
and micro-grids
Solar Installations
by Discoms to promote
clean and green energy
(DDUGJY)
Total investment of
28
to rural homes, micro small
and cottage industries
Now small hamlets
also covered
29. (IPDS)
Integrated Power
Development Scheme
` 45,816 Cr.
Smart-metering
tamper-proof meters at homes
infrastructure upgradation
in urban areas
IT implementation for better customer service
Total Govt. expenditure
for large consumers and
Comprehensive sub-transmission & distribution
An integrated scheme for urban areas covering:
` 1.09 lakh Cr.
TRANSMISSION&DISTRIBUTIONFUEL>GENERATION>
29
Underground cabling and high tech GIS
transformers in densely populated areas
Solar installations like rooftop solar also covered
30. 30
ENERGY
EFFICIENCY:
POWER SAVEDIS WORTH 1.33 UNITS PRODUCED
ONE UNIT OF
TARGET
TO SAVE 10%OF CURRENT ENERGY CONSUMPTION
ENERGY
EFFICIENCY
PROGRAMMES
ALL INCANDESCENT BULBS TO BE
CHANGE TO LED IN THREE YEARS
NATIONWIDE
CAMPAIGN
FOR ENERGY CONSERVATION
LAUNCHED
31. (DELP) taken up in
about 151 cities in 18
states to replace
20.45 Cr. bulbs in
6.3 Cr. households
by 2016
Due to transparent procurement,
price of LED has reduced by 74% from
` 310 in Feb 2014 to ` 82 in Mar 2015
` 310
` 204
` 149
` 104
` 82
Distribution of bulbs has
already commenced in
Andhra Pradesh where
45 Lakh LED bulbs have
been distributed to about
22.5 Lakh consumers
Energy Efficient Street
Lighting Programme to
cover 251 municipalities
across India to replace 90
lakh street lights by 2016
Installation of LED street
lights has already been
completed in Greater
Vishakhapatnam Municipal
Corporation and Jhalawar
Municipal Corporation
CONSUMPTION
Feb-14 Aug-14 Nov-14 Feb-15 Mar-15
74%
Reduction
TRANSMISSION&DISTRIBUTION>CONSUMPTIONFUEL>GENERATION>
31
DOMESTIC
EFFICIENT
LIGHTING
PROGRAMME
LED PRICE
32. SABKA
SAATH,
SABKA
VIKAS
CO-OPERATIVE FEDERALISM
32
Massive thrust to expedite projects in North East to overcome power
shortages and increase prosperity. Investment of ` 9,865 Cr. for
upgrading power systems in 8 North Eastern States (Arunachal
Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim
and Tripura)
For the first time, National State Power Ministers’ conference was
held in Guwahati where Ministers & Officials from all over India
converged in North East
24X7 power plans made for Andhra Pradesh and Rajasthan. Action
plans for other states at advanced stage of finalization
Entire Coal auction revenue
will go to coal bearing states
especially under developed
states of Eastern India like
Jharkhand, Chhattisgarh,
Odisha, West Bengal etc.
33. 33
Massive thrust on renewables to increase share of clean energy
More than 1 lakh solar pumps sanctioned in the past year
Solar pumps helped lakhs of farmers increase output, income and
also provide drinking water.
Drinking water problem will be solved for more than 7.6 lakh
families through solar pumps for drinking water
UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving
the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year.
Compulsory crushing and washing of coal to reduce ash transport by linking plants to
their closest mines
ZERO EFFECT
ON ENVIRONMENT
TRANSMISSION&DISTRIBUTION>CONSUMPTIONBEYONDFUEL>GENERATION>
34. o Massive thrust for ‘MAKE IN INDIA’ program: Orders of more than ` 100,000 crores
being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid
Corporation etc. to kickstart the economy
o Domestic industry being encouraged to scale up and become more cost effective
o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India
o Defence establishments will buy 300 MW solar plants
o Similar initiatives across sectors
34
35. Swachh BharatThe PSUs under the three Ministries are committed to active involvement in this effort.
As a first step, they are investing over
` 2,250 Cr. for
over 1,25,000 toilets
separately for boys and girls by 15th
August, 2015 particularly in the needy states such as
Bihar, Odisha, West Bengal, Jharkhand, Chhattisgarh, Andhra Pradesh and Rajasthan.
After construction, the PSUs will also maintain these toilets for a period of five years thus
ensuring a complete sanitation programme.
Awareness is being created in local communities to improve over all sanitation.
TRANSMISSION&DISTRIBUTION>CONSUMPTIONBEYONDFUEL>GENERATION>
35
36. 36
TRANSPARENCY & EFFICIENCY
in USING TECHNOLOGY
DIGITAL
Optical fiber network to connect all high voltage substations thus
reducing outages
Reduction in coal theft using RFID/GPS tagging
Coal project monitoring portal for quick decision making, faster
dispute resolution and accelerated removal of bottlenecks
Smart Grid & Smart Metering to improve power availability
e-Office implemented in Ministries
National
Transmission Asset
Management Centre
(NTAMC) to remotely
monitor national
power grid and help
increase power
availability
39.
Rapid
Emergency
Response
TRANSMISSION&DISTRIBUTION>CONSUMPTIONBEYONDFUEL>GENERATION>
Nepal: Helped Nepal's electricity grid
come online after the earthquake and is
now working towards rebuilding the
distribution network
39
Delhi: After transmission tower
collapse in May 2014, central
government worked day and night
to restore power in 15 days which
would have otherwise taken
more than six months
J&K Floods: Special teams rushed
to the state to restore power on war
footing
Cyclone Hudhud: Central teams
assigned to restore power in
cyclone hit areas. Damaged
streetlights converted to LED within
six weeks to restore as well as
improve lighting
40. www.ujwalbharat.com
Ministry of Power, Coal and New & Renewable Energy
GOVERNMENTOFINDIA
Prime Minister Narendra Modi
at RE-Invest 2015
India has now graduated from
megawatts to gigawatts in terms
of renewable energy production.
UjwalBharat2015@UjwalBharat