Huckabee Construction Update April 2012

705 views
613 views

Published on

Presented at April 16, 2012 Board of trustees Meeting.

Published in: Education, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
705
On SlideShare
0
From Embeds
0
Number of Embeds
4
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Huckabee Construction Update April 2012

  1. 1. GEORGETOWN ISD2010 BOND PROGRAM UPDATE A P R I L 2 01 2 Huckabee
  2. 2. 2010 BOND PROGRAM UPDATE TABLE OF CONTENTS East View High School Phase 2 Additions, Package 2 3 Georgetown High School Additions and Renovations 7 Completed Projects 12 HuckabeeGeorgetown Independent School District 2
  3. 3. 2010 BOND PROGRAM UPDATE General Contractor EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Original: $25,574,000 I CATE Addition – $2,121,338 I J Baseball & Softball Turf - $880,000 New Athletic Addition H H Total - $28,575,338 F G J H J First Floor Bid Package 1 A B J Existing East View J High School B A. New Athletic Addition B. New Fine Arts Addition New Fine Arts Addition D E C. New Academic Addition C D. New CTE Building New Academic Addition E. New ROTC Addition (Alt.) CR 10 F. New Tennis Courts 4 ay 29 G. New Tennis Building hw Hig H. New Baseball/Softball Fieldhouse, Bleachers, Lighting & Pressbox I. New Practice Fields J. New Parking (1,070 spaces) New Academic Addition CTE Building Second Floor New CTE/ROTC AdditionAcademic Wing Softball Field House HuckabeeGeorgetown Independent School District 3
  4. 4. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Academic Addition • Interior partition installation is nearing completion. • Exterior masonry veneer is currently being installed around the academic wing. • Roof structure, decking and insulation are in place. Finished metal roof panels will start being installed next. Athletic Addition • Exterior masonry veneer is complete at the locker room addition • Ceiling installation and wall painting has begun at the locker rooms. • Exterior masonry veneer is currently being installed around the gym and is nearing completion. Veneer installation at the gym enrty will begin next. • Roof installation is complete at the gym roof. Roof installation at the gym entry will begin next. • Painting and lighting inside the gym will begin next. CATE/ROTC • Steel super-structure is in place for both east and west sides of the CATE. • Masonry walls at the exterior are being constructed. • Masonry walls for the storage mezzanine are being constructed. Once these are complete the slab for the storage mezzanine will be poured. Academic Corridor HuckabeeGeorgetown Independent School District 4
  5. 5. 2010 BOND PROGRAM UPDATE EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, PACKAGE 2 Academic Wing Gym & Locker Rooms HuckabeeGeorgetown Independent School District 5
  6. 6. 2010 BOND PROGRAM UPDATE Gym Entry CATE HuckabeeGeorgetown Independent School District 6
  7. 7. 2010 BOND PROGRAM UPDATE Construction Manager GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS BAIRD WILLIAMS Huckabee CONSTRUCTION GEORGETOWN HIGH SCHOOL BAIRD WILLIAMS CONSTRUCTION 3D Rendering Project Manager Front Entry Boards.indd 4 7/26/11 8:55 AM CTE Wing Cafeteria Athletics Auditorium Academic Athletics Athletics Computer Labs Science Labs Library Athletics Special Education Academic Fine Arts HuckabeeGeorgetown Independent School District 7
  8. 8. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL ADDITIONS AND RENOVATIONS Phase I CAFETERIA/CLASSROOM ADDITION • Steel super-structure is in place. Steel roof decking is being installed. • Perimeter and interior masonry walls are being constructed. ATHLETICS ADDITION • Masonry wall construction has begun. • The remaining slab for the locker rooms is set to pour next. KITCHEN RENOVATION • Utility rough-in at existing slab is complete. • Utility rough-in for new slab will begin next. Once rough-in is complete, the new kitchen slab can be poured. • New steel structure supporting the existing roof is in place. EXISTING GYM & LOCKER ROOM RENOVATION • Demolition of existing wood floor at lower gym is complete. • Demolition of locker rooms at lower gym and upper gym is ongoing. Once demolition in these areas is complete, utility rough-in for new locker rooms and restrooms can begin. Cafeteria Interior HuckabeeGeorgetown Independent School District 8
  9. 9. 2010 BOND PROGRAM UPDATE georgetown high school additions and renovations Cafeteria Exterior Locker Room Addition HuckabeeGeorgetown Independent School District 9
  10. 10. 2010 BOND PROGRAM UPDATE Kitchen Renovation Locker Room Demolition HuckabeeGeorgetown Independent School District 10
  11. 11. 2010 BOND PROGRAM UPDATE GEORGETOWN HIGH SCHOOL AND RENOVATIONS Athletic Addition Kitchen Expansion Cafeteria Expansion Classroom Greenhouse Addition Aerial HuckabeeGeorgetown Independent School District 11
  12. 12. 2010 BOND PROGRAM UPDATE COMPLETED PROJECTS EAST VIEW HIGH SCHOOL PHASE 2 ADDITIONS, NEW WAREHOUSE FACILITY ANNIE PURL ELEMENTARY SCHOOL PACKAGE 1 ROOF AND HVAC MODIFICATION Contract Amount: $5,321,000 Contract Amount: $641,000 Contract Amount: $229,000 Substantial Completion Date: August 19, 2011 Substantial Completion Date: November 9, 2011 Substantial Completion Date: August 12, 2011 General Contractor: Charter Builders General Contractor: CSS, Inc. General Contractor: Saratoga Field House Locker Room Interior View of Warehouse New HVAC Unit and Roofing Field House Weight Room Storage Shed New Ceiling and Light Fixtures HuckabeeGeorgetown Independent School District 12

×