DATASHEET
general information
Gemini offshore wind farm
Official name Project Gemini
Status Under construction
Area of windfarm 2 x 34 km2
Description Buitengaats & ZeeEnergie
Location North of the isle Schiermonnikoog
Country Netherlands
Sea name North Sea
Distance from shore 85 km
Water depth 28 - 36 m
Owner Northland Power Inc. (60%), Siemens (20%), Van Oord
(10%) and HVC (10%)
Installer Turbines Siemens
Installer Foundations Structure Van Oord Offshore Wind Projects BV
Construction Start estimated Q2 2014
Operator Gemini
Commission Year estimated 2017
Project & Organization
Production
Total Capacity to be installed 600 MW
Total Number of Turbines 150
Annual Estimated Production ~ 2,6 TWh/year
Offshore Subsation & Grid Connection
Transformer 2 Offshore Substations
Infield Voltage Level 33 kV
Export Voltage Level 220 kV
Infield Cable Length/Material 105 KM
Supplier NSW
Export Cable Length/Material 110 km / Aluminium
Transmission Type HVAC
Supplier NKT
Technical Specifications Wind Turbine
Manufacturer Siemens
Model SWT4.0 - 130
Rated Power pr. Turbine 4.0 MW
Number of Turbines 150
IEC Wind Turbine Class IB
DATASHEET
Nacelle
Drive Train Type 3 stage planetary / helical
Gearbox Ratio 1:119
Generator Type SCIG
Power Converter Type 4Q Full
Turbine Voltage Level 690V
Yaw Gears - Number
Dimensions of Nacelle
Length 14m
Width 2-4m
Height 4m
Tower
Structure Type Tubular
Structure Material Steel
Foundational Structure
Structure Type Monopiles
Support Structure Material Steel
Foundational Type Piled
Technical Specifications
Resources
Website www.geminiwindfarm.com
Operational
Cut-in Wind Speed 4 m/s
Rated Wind Speed 12 m/s
Cut-out Wind Speed 30 m/s
Rotor & Hub
Rotor Diameter 130 m
Rotor Area 13.300 m2
Rotor Speed (rated) 5-13 rpm
Hub Height (above sea level) 90 m
Blade Type B63
Blade Lenght 63 m
Pitch System
Technical Specifications

More Related Content

Similar to Datasheet with info about Gemini

Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoalStatoil
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide sharejbtolstoy
 
Wind Energy Nguyen Hoang Viet Final
Wind Energy   Nguyen Hoang Viet FinalWind Energy   Nguyen Hoang Viet Final
Wind Energy Nguyen Hoang Viet FinalViet NguyenHoang
 
EMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTDutch Power
 
Offshore wind power presentation for China
Offshore wind power presentation for ChinaOffshore wind power presentation for China
Offshore wind power presentation for ChinaChris Westra
 
Small Scale Wind Installations - RETScreen Software
Small Scale Wind Installations - RETScreen SoftwareSmall Scale Wind Installations - RETScreen Software
Small Scale Wind Installations - RETScreen Softwarefernando nuño
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalDavid Hults
 
KEMET Axials Capacitors
KEMET Axials CapacitorsKEMET Axials Capacitors
KEMET Axials CapacitorsNick Stephen
 
Power generation in egypt
Power generation in egyptPower generation in egypt
Power generation in egyptahmed saifeldin
 
Capacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoCapacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoRCREEE
 
Capacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoCapacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoRCREEE
 

Similar to Datasheet with info about Gemini (20)

Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoal
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
C offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide shareC offshore jeju 2013 02 24 f slide share
C offshore jeju 2013 02 24 f slide share
 
Wind Energy Nguyen Hoang Viet Final
Wind Energy   Nguyen Hoang Viet FinalWind Energy   Nguyen Hoang Viet Final
Wind Energy Nguyen Hoang Viet Final
 
EMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneTEMVT 12 september - Han van Asten - TenneT
EMVT 12 september - Han van Asten - TenneT
 
Offshore wind power presentation for China
Offshore wind power presentation for ChinaOffshore wind power presentation for China
Offshore wind power presentation for China
 
Vineyard Wind
Vineyard WindVineyard Wind
Vineyard Wind
 
Small scale wind energy
Small scale wind energySmall scale wind energy
Small scale wind energy
 
Small Scale Wind Installations - RETScreen Software
Small Scale Wind Installations - RETScreen SoftwareSmall Scale Wind Installations - RETScreen Software
Small Scale Wind Installations - RETScreen Software
 
Bergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - FinalBergh 42.585 KW Planset - Final
Bergh 42.585 KW Planset - Final
 
KEMET Axials Capacitors
KEMET Axials CapacitorsKEMET Axials Capacitors
KEMET Axials Capacitors
 
Final Presentation
Final PresentationFinal Presentation
Final Presentation
 
CV J LOWTHER WORD
CV J LOWTHER WORDCV J LOWTHER WORD
CV J LOWTHER WORD
 
Power generation in egypt
Power generation in egyptPower generation in egypt
Power generation in egypt
 
CBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrathCBI NI energy conference: Harry McGrath
CBI NI energy conference: Harry McGrath
 
Capacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoCapacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in morocco
 
Capacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in moroccoCapacity building 2010 day 1 wind energy in morocco
Capacity building 2010 day 1 wind energy in morocco
 
TETHYS Presentation
TETHYS PresentationTETHYS Presentation
TETHYS Presentation
 
Wind Farm design and Construction
Wind Farm design and ConstructionWind Farm design and Construction
Wind Farm design and Construction
 

Recently uploaded

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 

Recently uploaded (20)

Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 

Datasheet with info about Gemini

  • 1. DATASHEET general information Gemini offshore wind farm Official name Project Gemini Status Under construction Area of windfarm 2 x 34 km2 Description Buitengaats & ZeeEnergie Location North of the isle Schiermonnikoog Country Netherlands Sea name North Sea Distance from shore 85 km Water depth 28 - 36 m Owner Northland Power Inc. (60%), Siemens (20%), Van Oord (10%) and HVC (10%) Installer Turbines Siemens Installer Foundations Structure Van Oord Offshore Wind Projects BV Construction Start estimated Q2 2014 Operator Gemini Commission Year estimated 2017 Project & Organization Production Total Capacity to be installed 600 MW Total Number of Turbines 150 Annual Estimated Production ~ 2,6 TWh/year Offshore Subsation & Grid Connection Transformer 2 Offshore Substations Infield Voltage Level 33 kV Export Voltage Level 220 kV Infield Cable Length/Material 105 KM Supplier NSW Export Cable Length/Material 110 km / Aluminium Transmission Type HVAC Supplier NKT Technical Specifications Wind Turbine Manufacturer Siemens Model SWT4.0 - 130 Rated Power pr. Turbine 4.0 MW Number of Turbines 150 IEC Wind Turbine Class IB
  • 2. DATASHEET Nacelle Drive Train Type 3 stage planetary / helical Gearbox Ratio 1:119 Generator Type SCIG Power Converter Type 4Q Full Turbine Voltage Level 690V Yaw Gears - Number Dimensions of Nacelle Length 14m Width 2-4m Height 4m Tower Structure Type Tubular Structure Material Steel Foundational Structure Structure Type Monopiles Support Structure Material Steel Foundational Type Piled Technical Specifications Resources Website www.geminiwindfarm.com Operational Cut-in Wind Speed 4 m/s Rated Wind Speed 12 m/s Cut-out Wind Speed 30 m/s Rotor & Hub Rotor Diameter 130 m Rotor Area 13.300 m2 Rotor Speed (rated) 5-13 rpm Hub Height (above sea level) 90 m Blade Type B63 Blade Lenght 63 m Pitch System Technical Specifications