SlideShare a Scribd company logo
1 of 4
Download to read offline
CM20068
A preformed closed cell physically crosslinked polyolefin foam tube
insulation with reinforced foil facing for steel and copper pipes.
PIPE INSULATION
PHYSICALLYC R O S S L I N K E D
S E K I S U I T E C H N O L O G Y
tube
tube
PIPE INSULATIONPIPE INSULATION
tube
Premium performance pipe insulation offering lower
installation costs and maximum energy savings
Product Description
•	 Completely closed cell, physically crosslinked foam pipe
insulation.
•	 Heat bonded factory applied reinforced aluminium foil.
•	 Pre-slit for faster installation.
•	 Flexible, tough and durable.
•	 Excellent compression resistance due to its crosslinked
foam structure.
•	 Superior insulating properties compared to other flexible
closed cell foams.
•	 Very high vapour diffusion resistance Class 1 Vapour
Retarder under ASHRAE 2009.
•	 No cladding required for internal applications
•	 Conforms to ISO 5659-2 “Smoke Density and Toxicity”.
•	Anti-Microbial.
•	 Green Star Compliant Product (VOC).
•	 Complies to NFPA 90A & NFPA 90B.
•	 Developed and Manufactured in Australia
Size Availability
Wall thickness (mm) 	 Min ID	 Max ID	 IPS Max
				 (mm)	(mm)	(in)
15mm 			 7.0 	 508 	 20”
20mm 			 7.0 	 508 	 20”
25mm 			 7.0 	 508 	 20”
30mm / 35mm 		 9.5 	 508 	 20”
40mm / 50mm / 55mm 	 12.7 	 508 	 20”
Technical Data
Material: Physically (irradiation) crosslinked polyolefin foam with
factory applied reinforced foil.
Density:	25kg/m3
(foam core only)
Thermal Conductivity:	 0.032 W/m/o
K (@ 23°C mean
(ASTM C518)	 temperature)
Water Vapour Permeability: 	 8.19 X 10-15
kg/Pa.s.m
(ASTM E96) 	 (0.029 mg.m/N.h)
Water Vapour Permeance: 	 3.3 X 10-4
g/MN.s
Permeability Resistance Factor: 	 μ>20,000
Water Absorption by Volume: 	 < 0.1% v/v (0.00038 g/cm2
)
(JIS K 6767)
Resistance to Fungi: 	 Zero Growth
(ASTM G21)
Ozone Resistance: 	 Excellent
UV Resistance: 	 Excellent
Operating Temperature : 	 -80° C to 100° C
©SekisuiPilonPtyLtd.DateofPublication:March2013.
PIPE INSULATION
Softlon and Thermobreak – Registered trademarks of Sekisui Chemical Co. Ltd or its subsidiaries.
SiZE AvAiLABiLiTy
Other sizes available on request.
8-mm 50m X 1200 mm rolls
10-mm 20m X 1200 mm rolls
12-mm 20m X 1200 mm rolls
15-mm 20m X 1200 mm rolls
20-mm 20m X 1200 mm rolls
25~50-mm 2300mm X 1200mm sheets
Product Certification may be plant specific. Please consult with your local representative.
Technical Specifications
Distributed by
Thailand Plant
700/329 Moo 6, Amata Nakorn Industrial Estate,
Tumbol Donhua-Ioh, Amphur Muang Chonburi 20000
Tel: +66 38 213219-26
Email: info@thaisekisui.co.th
Web: www.thaisekisui.co.th
Australian Plant
1-5 Parraweena Rd, PO BOX 2898,
Taren Point NSW 2229 Australia
Tel: +61 2 9525 9880
Email: info@sekisuifoam.com.au
Web: www.sekisuifoam.com.au
PHySiCAL PRoPERTiES
Material: Physically (irradiation) crosslinked closed
cell polyolefin foam with factory applied
reinforced aluminium foil and acrylic
adhesive backing
Density: 25 kg/m3
(foam core only)
Thermal Conductivity: 0.032 W/m/°K (@ 23°C mean temp.)
(ASTM C518) 0.036 W/m/°K (@ 36°C mean temp.)
Water vapour Permeability: 8.19 x 10-15
kg/Pa.s.m
(ASTM E96) (0.029 mg.m/N.h)
Water vapour Permeance: 3.3 x 10-4
g/MN.s
Water absorption by volume: <0.1% v/v
(JIS K6767) (0.00038 g/cm2
)
Permeability Resistance Factor: μ > 20,000
Resistance to fungi: Zero Growth
(ASTM G21)
ozone Resistance: Excellent
Uv Resistance: Excellent
Noise Reduction Coefficient: 0.20 (12mm foam thickness)
(ISO 354) 0.30 (25mm foam thickness)
operating Temperature Range: -80 °C ~ +100 °C (no adhesive)
GreenStar Rating: Low VOC Emitting
(ASTM D5116)
Physical Property Requirements: COMPLIES (Type II - Sheet)
(ASTM C1427)
REACH Directives: COMPLIES
(1907/2006/EC)
FiRE AND SMoKE BEHAvioUR
BS476 Parts 6 & 7: CLASS 0
AS1530 Part 3 Ignitability Index: 0
Spread of Flame Index: 0
Heat Evolved Index: 0
Smoke Developed Index: 0-1
ASTM E84: COMPLIES (NFPA 90A & B)
Flame Spread Index: <25
Smoke Developed Index: <50
ASTM C411: COMPLIES (NFPA 90A & B)
FM 4924 Thermobreak Sheet APPROVED
Up to 25mm thickness
AS 3837 BCA Group Number: 1
Smoke Index: ≤250
BS 6853 Annex B Smoke Toxicity COMPLIES (R < 1.0)
iMo MSC 61(67) Part 2 Smoke Toxicity COMPLIES
iSo 5659 Part 2 Smoke Density COMPLIES (IMO MSC 61(67) Part 2)
Dm < 200
Satisfies max allowable
concentrations for the
following combustion gases:
CO, HCl, HBr, HF, HCN, NOx, SO2
UL 94 Horizontal Burn APPROVED (HF-1)
Distributed by
tube
Fire and Smoke Behaviour
BS 476 Part 6 & 7 	 Class 0
AS1530.3 (1999)
Spread of Flame Index: 	 0
Heat Evolved Index: 	 0
Ignitability Index: 	 0
Smoke Developed Index: 	 0-1
UL 94 	 HF-1
ASTM E 84 	 Complies to:
	 Flame Spread Index <25
	 Smoke Index <50
FM 4924 	 Approved (up tp 12” IPS &
	 50mm wall thickness)
NFPA 90A & NFPA 90B 	 Complies with requirements
ISO 5659-2 (1994)
Smoke Density 	 Dm
< 200
Smoke Toxicity 	 Satisfies max allowable concentrations 	
	 for the following combustion gases
	 CO, HCl, HBr, HF, HCN, NOx
, SO2
BS 6853 Annex B Complies to: 	 Smoke Toxicity
	 Index R <1.0
Sekisui Foam Australia
Head Office
1-5 Parraweena Rd, PO Box 2898,
Taren Point NSW 2229 Australia
Tel:	 +61 2 9525 9880
Fax:	 +61 2 9525 8004
Email:	info@sekisuifoam.com.au
Web:	www.sekisuifoam.com.au
Queensland Branch
15/853 Nudgee Rd, PO Box 448,
Northgate QLD 4013 Australia
Tel: 	 +61 7 3267 7100
Fax: 	 +61 7 3267 7166
Email: 	info@sekisuifoam.com.au
Web: 	 www.sekisuifoam.com.au

More Related Content

What's hot

Pilingbargenew 130607235913-phpapp02
Pilingbargenew 130607235913-phpapp02Pilingbargenew 130607235913-phpapp02
Pilingbargenew 130607235913-phpapp02niko fernando
 
03. pelaksanaan konstruksi jembatan
03. pelaksanaan konstruksi jembatan03. pelaksanaan konstruksi jembatan
03. pelaksanaan konstruksi jembatanDedyEko4
 
Pile Dynamic Analyzer (PDA) Test and Hammer Test
Pile Dynamic Analyzer (PDA) Test and Hammer TestPile Dynamic Analyzer (PDA) Test and Hammer Test
Pile Dynamic Analyzer (PDA) Test and Hammer Testinka -chan
 
Modul TKP M2KB2 - Struktur Statis Tertentu
Modul TKP M2KB2 - Struktur Statis Tertentu Modul TKP M2KB2 - Struktur Statis Tertentu
Modul TKP M2KB2 - Struktur Statis Tertentu PPGHybrid1
 
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...BinaJasaKonstruksiMe
 
METODE PELAKSANAAN DAN EVALUASI JALAN
METODE PELAKSANAAN DAN EVALUASI JALANMETODE PELAKSANAAN DAN EVALUASI JALAN
METODE PELAKSANAAN DAN EVALUASI JALANChay Chay
 
Pertemuan 1 sejarah perkembangan jalan
Pertemuan 1 sejarah perkembangan jalanPertemuan 1 sejarah perkembangan jalan
Pertemuan 1 sejarah perkembangan jalanFeraLestari3
 
Bab ii distribusi momen
Bab ii distribusi momenBab ii distribusi momen
Bab ii distribusi momendika andika
 
87280501 perencanaan-sistem-drainase-130227011440-phpapp01
87280501 perencanaan-sistem-drainase-130227011440-phpapp0187280501 perencanaan-sistem-drainase-130227011440-phpapp01
87280501 perencanaan-sistem-drainase-130227011440-phpapp01Yosep Kristiawan
 
Studi Kasus Desain Perkerasan Jalan
Studi Kasus Desain Perkerasan JalanStudi Kasus Desain Perkerasan Jalan
Studi Kasus Desain Perkerasan JalanPilangMaharani
 
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...Angga Nugraha
 
Bab e. uraian pendekatan, metodologi dan program kerja
Bab e. uraian pendekatan, metodologi dan program kerjaBab e. uraian pendekatan, metodologi dan program kerja
Bab e. uraian pendekatan, metodologi dan program kerjaAngga Erlangga
 
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Bagus ardian
 
Standar perencanaan struktur baja untuk jembatan
Standar perencanaan struktur baja untuk jembatanStandar perencanaan struktur baja untuk jembatan
Standar perencanaan struktur baja untuk jembatanardi nasir
 
Setting Out Construction
Setting Out ConstructionSetting Out Construction
Setting Out ConstructionShopyan Sauri
 
Ppt tugas kelompok sistem bangunan irigasi
Ppt tugas kelompok sistem bangunan irigasiPpt tugas kelompok sistem bangunan irigasi
Ppt tugas kelompok sistem bangunan irigasiMOSES HADUN
 
Tesis Kebutuhan Perlengkapan Jalan
Tesis Kebutuhan Perlengkapan JalanTesis Kebutuhan Perlengkapan Jalan
Tesis Kebutuhan Perlengkapan Jalanoktariansyah
 

What's hot (20)

Pilingbargenew 130607235913-phpapp02
Pilingbargenew 130607235913-phpapp02Pilingbargenew 130607235913-phpapp02
Pilingbargenew 130607235913-phpapp02
 
03. pelaksanaan konstruksi jembatan
03. pelaksanaan konstruksi jembatan03. pelaksanaan konstruksi jembatan
03. pelaksanaan konstruksi jembatan
 
Pile Dynamic Analyzer (PDA) Test and Hammer Test
Pile Dynamic Analyzer (PDA) Test and Hammer TestPile Dynamic Analyzer (PDA) Test and Hammer Test
Pile Dynamic Analyzer (PDA) Test and Hammer Test
 
Modul TKP M2KB2 - Struktur Statis Tertentu
Modul TKP M2KB2 - Struktur Statis Tertentu Modul TKP M2KB2 - Struktur Statis Tertentu
Modul TKP M2KB2 - Struktur Statis Tertentu
 
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...
Modul 9 Rancangan Konseptual SMKK, RKK Penawaran, dan RKK Pengawasan 20220217...
 
METODE PELAKSANAAN DAN EVALUASI JALAN
METODE PELAKSANAAN DAN EVALUASI JALANMETODE PELAKSANAAN DAN EVALUASI JALAN
METODE PELAKSANAAN DAN EVALUASI JALAN
 
Pertemuan 1 sejarah perkembangan jalan
Pertemuan 1 sejarah perkembangan jalanPertemuan 1 sejarah perkembangan jalan
Pertemuan 1 sejarah perkembangan jalan
 
Bab ii distribusi momen
Bab ii distribusi momenBab ii distribusi momen
Bab ii distribusi momen
 
Rencana pembuatan fly over
Rencana pembuatan fly overRencana pembuatan fly over
Rencana pembuatan fly over
 
87280501 perencanaan-sistem-drainase-130227011440-phpapp01
87280501 perencanaan-sistem-drainase-130227011440-phpapp0187280501 perencanaan-sistem-drainase-130227011440-phpapp01
87280501 perencanaan-sistem-drainase-130227011440-phpapp01
 
Studi Kasus Desain Perkerasan Jalan
Studi Kasus Desain Perkerasan JalanStudi Kasus Desain Perkerasan Jalan
Studi Kasus Desain Perkerasan Jalan
 
Pedoman desain geometrik jalan 2020
Pedoman desain geometrik jalan 2020Pedoman desain geometrik jalan 2020
Pedoman desain geometrik jalan 2020
 
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi   angga nug...
Materi perhitungan kebutuhan pasir urug pada pekerjaan konstruksi angga nug...
 
Bab e. uraian pendekatan, metodologi dan program kerja
Bab e. uraian pendekatan, metodologi dan program kerjaBab e. uraian pendekatan, metodologi dan program kerja
Bab e. uraian pendekatan, metodologi dan program kerja
 
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
Penjelasan Pelaksanaan QAQC pada Program BSPS NAHP TA 2020
 
Standar perencanaan struktur baja untuk jembatan
Standar perencanaan struktur baja untuk jembatanStandar perencanaan struktur baja untuk jembatan
Standar perencanaan struktur baja untuk jembatan
 
Setting Out Construction
Setting Out ConstructionSetting Out Construction
Setting Out Construction
 
Ppt tugas kelompok sistem bangunan irigasi
Ppt tugas kelompok sistem bangunan irigasiPpt tugas kelompok sistem bangunan irigasi
Ppt tugas kelompok sistem bangunan irigasi
 
Tesis Kebutuhan Perlengkapan Jalan
Tesis Kebutuhan Perlengkapan JalanTesis Kebutuhan Perlengkapan Jalan
Tesis Kebutuhan Perlengkapan Jalan
 
Ecodrain
EcodrainEcodrain
Ecodrain
 

Similar to Thermobreak Tube - Brochure 230914 D

Thermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DThermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DGary Haydon
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DGary Haydon
 
Thermobreak AcoustiPlus - Brochure 230914 D
Thermobreak AcoustiPlus - Brochure 230914 DThermobreak AcoustiPlus - Brochure 230914 D
Thermobreak AcoustiPlus - Brochure 230914 DGary Haydon
 
Thermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DThermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DGary Haydon
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolioAndy Brown
 
ICS 5000 UK version
ICS 5000 UK version ICS 5000 UK version
ICS 5000 UK version Schiedel UK
 
Compounds selector-guide
Compounds selector-guideCompounds selector-guide
Compounds selector-guidemrittika01
 
Thermobreak Thermaloc - Brochure 270814 D
Thermobreak Thermaloc - Brochure 270814 DThermobreak Thermaloc - Brochure 270814 D
Thermobreak Thermaloc - Brochure 270814 DGary Haydon
 
Compounds selector-guide
Compounds selector-guideCompounds selector-guide
Compounds selector-guidemrittika01
 
Elematic cable protection - אלמטיק
Elematic cable protection - אלמטיקElematic cable protection - אלמטיק
Elematic cable protection - אלמטיקgutman barzilai company
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic BrochureSchiedel UK
 
3-Jeremias CE Mark 1856-1_2 guide.pdf
3-Jeremias CE Mark 1856-1_2 guide.pdf3-Jeremias CE Mark 1856-1_2 guide.pdf
3-Jeremias CE Mark 1856-1_2 guide.pdfRoberto Gutierrez
 
DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200Cam Craig
 
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Daniel Chen
 

Similar to Thermobreak Tube - Brochure 230914 D (20)

Thermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 DThermobreak Solar - Brochure 230914 D
Thermobreak Solar - Brochure 230914 D
 
Thermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 DThermobreak Thermacoil - Brochure 270814 D
Thermobreak Thermacoil - Brochure 270814 D
 
Thermobreak AcoustiPlus - Brochure 230914 D
Thermobreak AcoustiPlus - Brochure 230914 DThermobreak AcoustiPlus - Brochure 230914 D
Thermobreak AcoustiPlus - Brochure 230914 D
 
Thermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 DThermobreak Sheet - Brochure 020914 D
Thermobreak Sheet - Brochure 020914 D
 
Corrosion Under Insulation
Corrosion Under InsulationCorrosion Under Insulation
Corrosion Under Insulation
 
Airtherm flue portfolio
Airtherm flue portfolioAirtherm flue portfolio
Airtherm flue portfolio
 
ICS 5000 UK version
ICS 5000 UK version ICS 5000 UK version
ICS 5000 UK version
 
Compounds selector-guide
Compounds selector-guideCompounds selector-guide
Compounds selector-guide
 
Thermobreak Thermaloc - Brochure 270814 D
Thermobreak Thermaloc - Brochure 270814 DThermobreak Thermaloc - Brochure 270814 D
Thermobreak Thermaloc - Brochure 270814 D
 
Compounds selector-guide
Compounds selector-guideCompounds selector-guide
Compounds selector-guide
 
CSL Silicones Building Construction Brochure 2014
CSL Silicones Building  Construction Brochure 2014CSL Silicones Building  Construction Brochure 2014
CSL Silicones Building Construction Brochure 2014
 
What is PFA Tubing?
What is PFA Tubing?What is PFA Tubing?
What is PFA Tubing?
 
Elematic cable protection - אלמטיק
Elematic cable protection - אלמטיקElematic cable protection - אלמטיק
Elematic cable protection - אלמטיק
 
ICS Brochure
ICS BrochureICS Brochure
ICS Brochure
 
Ceramic Brochure
Ceramic BrochureCeramic Brochure
Ceramic Brochure
 
3-Jeremias CE Mark 1856-1_2 guide.pdf
3-Jeremias CE Mark 1856-1_2 guide.pdf3-Jeremias CE Mark 1856-1_2 guide.pdf
3-Jeremias CE Mark 1856-1_2 guide.pdf
 
ArmorCote
ArmorCoteArmorCote
ArmorCote
 
DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200DU pre-insulated-tubing-series-2200
DU pre-insulated-tubing-series-2200
 
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
 
Loctite 577 tds
Loctite 577 tdsLoctite 577 tds
Loctite 577 tds
 

Thermobreak Tube - Brochure 230914 D

  • 1. CM20068 A preformed closed cell physically crosslinked polyolefin foam tube insulation with reinforced foil facing for steel and copper pipes. PIPE INSULATION PHYSICALLYC R O S S L I N K E D S E K I S U I T E C H N O L O G Y tube
  • 3. Premium performance pipe insulation offering lower installation costs and maximum energy savings
  • 4. Product Description • Completely closed cell, physically crosslinked foam pipe insulation. • Heat bonded factory applied reinforced aluminium foil. • Pre-slit for faster installation. • Flexible, tough and durable. • Excellent compression resistance due to its crosslinked foam structure. • Superior insulating properties compared to other flexible closed cell foams. • Very high vapour diffusion resistance Class 1 Vapour Retarder under ASHRAE 2009. • No cladding required for internal applications • Conforms to ISO 5659-2 “Smoke Density and Toxicity”. • Anti-Microbial. • Green Star Compliant Product (VOC). • Complies to NFPA 90A & NFPA 90B. • Developed and Manufactured in Australia Size Availability Wall thickness (mm) Min ID Max ID IPS Max (mm) (mm) (in) 15mm 7.0 508 20” 20mm 7.0 508 20” 25mm 7.0 508 20” 30mm / 35mm 9.5 508 20” 40mm / 50mm / 55mm 12.7 508 20” Technical Data Material: Physically (irradiation) crosslinked polyolefin foam with factory applied reinforced foil. Density: 25kg/m3 (foam core only) Thermal Conductivity: 0.032 W/m/o K (@ 23°C mean (ASTM C518) temperature) Water Vapour Permeability: 8.19 X 10-15 kg/Pa.s.m (ASTM E96) (0.029 mg.m/N.h) Water Vapour Permeance: 3.3 X 10-4 g/MN.s Permeability Resistance Factor: μ>20,000 Water Absorption by Volume: < 0.1% v/v (0.00038 g/cm2 ) (JIS K 6767) Resistance to Fungi: Zero Growth (ASTM G21) Ozone Resistance: Excellent UV Resistance: Excellent Operating Temperature : -80° C to 100° C ©SekisuiPilonPtyLtd.DateofPublication:March2013. PIPE INSULATION Softlon and Thermobreak – Registered trademarks of Sekisui Chemical Co. Ltd or its subsidiaries. SiZE AvAiLABiLiTy Other sizes available on request. 8-mm 50m X 1200 mm rolls 10-mm 20m X 1200 mm rolls 12-mm 20m X 1200 mm rolls 15-mm 20m X 1200 mm rolls 20-mm 20m X 1200 mm rolls 25~50-mm 2300mm X 1200mm sheets Product Certification may be plant specific. Please consult with your local representative. Technical Specifications Distributed by Thailand Plant 700/329 Moo 6, Amata Nakorn Industrial Estate, Tumbol Donhua-Ioh, Amphur Muang Chonburi 20000 Tel: +66 38 213219-26 Email: info@thaisekisui.co.th Web: www.thaisekisui.co.th Australian Plant 1-5 Parraweena Rd, PO BOX 2898, Taren Point NSW 2229 Australia Tel: +61 2 9525 9880 Email: info@sekisuifoam.com.au Web: www.sekisuifoam.com.au PHySiCAL PRoPERTiES Material: Physically (irradiation) crosslinked closed cell polyolefin foam with factory applied reinforced aluminium foil and acrylic adhesive backing Density: 25 kg/m3 (foam core only) Thermal Conductivity: 0.032 W/m/°K (@ 23°C mean temp.) (ASTM C518) 0.036 W/m/°K (@ 36°C mean temp.) Water vapour Permeability: 8.19 x 10-15 kg/Pa.s.m (ASTM E96) (0.029 mg.m/N.h) Water vapour Permeance: 3.3 x 10-4 g/MN.s Water absorption by volume: <0.1% v/v (JIS K6767) (0.00038 g/cm2 ) Permeability Resistance Factor: μ > 20,000 Resistance to fungi: Zero Growth (ASTM G21) ozone Resistance: Excellent Uv Resistance: Excellent Noise Reduction Coefficient: 0.20 (12mm foam thickness) (ISO 354) 0.30 (25mm foam thickness) operating Temperature Range: -80 °C ~ +100 °C (no adhesive) GreenStar Rating: Low VOC Emitting (ASTM D5116) Physical Property Requirements: COMPLIES (Type II - Sheet) (ASTM C1427) REACH Directives: COMPLIES (1907/2006/EC) FiRE AND SMoKE BEHAvioUR BS476 Parts 6 & 7: CLASS 0 AS1530 Part 3 Ignitability Index: 0 Spread of Flame Index: 0 Heat Evolved Index: 0 Smoke Developed Index: 0-1 ASTM E84: COMPLIES (NFPA 90A & B) Flame Spread Index: <25 Smoke Developed Index: <50 ASTM C411: COMPLIES (NFPA 90A & B) FM 4924 Thermobreak Sheet APPROVED Up to 25mm thickness AS 3837 BCA Group Number: 1 Smoke Index: ≤250 BS 6853 Annex B Smoke Toxicity COMPLIES (R < 1.0) iMo MSC 61(67) Part 2 Smoke Toxicity COMPLIES iSo 5659 Part 2 Smoke Density COMPLIES (IMO MSC 61(67) Part 2) Dm < 200 Satisfies max allowable concentrations for the following combustion gases: CO, HCl, HBr, HF, HCN, NOx, SO2 UL 94 Horizontal Burn APPROVED (HF-1) Distributed by tube Fire and Smoke Behaviour BS 476 Part 6 & 7 Class 0 AS1530.3 (1999) Spread of Flame Index: 0 Heat Evolved Index: 0 Ignitability Index: 0 Smoke Developed Index: 0-1 UL 94 HF-1 ASTM E 84 Complies to: Flame Spread Index <25 Smoke Index <50 FM 4924 Approved (up tp 12” IPS & 50mm wall thickness) NFPA 90A & NFPA 90B Complies with requirements ISO 5659-2 (1994) Smoke Density Dm < 200 Smoke Toxicity Satisfies max allowable concentrations for the following combustion gases CO, HCl, HBr, HF, HCN, NOx , SO2 BS 6853 Annex B Complies to: Smoke Toxicity Index R <1.0 Sekisui Foam Australia Head Office 1-5 Parraweena Rd, PO Box 2898, Taren Point NSW 2229 Australia Tel: +61 2 9525 9880 Fax: +61 2 9525 8004 Email: info@sekisuifoam.com.au Web: www.sekisuifoam.com.au Queensland Branch 15/853 Nudgee Rd, PO Box 448, Northgate QLD 4013 Australia Tel: +61 7 3267 7100 Fax: +61 7 3267 7166 Email: info@sekisuifoam.com.au Web: www.sekisuifoam.com.au