Vala 900 Phase IV Presentation

  • 652 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
652
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
2
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Vala 900 Phase IV Presentation Prepared by: Peter GARDENER & Ekrem CËRVADIKU
  • 2. Objectives
    • Utilize latest Technology
    • Offer all the existing and latest features
    • Ability to meet future market needs
    • Expandable in modular fashion without service interruption
    • Offer reliable and quality service
    • Minimize costs
    • Seamless integration with other vendors network equipment and systems
  • 3. Objectives
    • Increase the Network Capacity to support 700.000 customers
    • Increase Network Coverage to cover 99% of populated areas
    • Improve Network Quality. Achieve Call Blocking and Call Drop rates of 2% “Black Spots”
    • Improve existing Products and Services; SMS,VM
    • Introduce new innovative Product and Services; GPRS, MMS
    • Introduce Operational Support Systems to Plan and manage the GSM Network
  • 4. Main Factors
    • Forthcoming Competition
    • Predicted Lack of Capacity
    • Lack of GSM Coverage in Populated Areas
    • Improvement to Network Quality
    • Minimal Product and Services Offering
    • Lack of Automated Systems and Tools to manage and optimize the Network
  • 5. Benefits
    • Increasing capacity
    • Improving coverage
    • Improving quality
    • Value Added Services
    • Automated Planning and Management Systems
  • 6. Phase III
    • Capacity to support 400.000 customers
    • 85% coverage of the population
    • 2 MSC-s
    • 176 BTS-es
  • 7. Coverage
  • 8. Phase IV
    • Capacity to support 700.000 customers
    • 99% coverage of the population
    • 3 MSC-s
    • 286 BTS-es
  • 9. Implementation
    • Implementation 12 – 18 months
    • BTS Civil Works Commenced November 2005
    • Ease congestion in Prizren late 2005/2006. Prishtina, Gjakova, Peja - ongoing during project lifecycle
    • New Services Commercial Available to market QTR2 2006
    • In Parallel enhancements to systems / platforms ongoing during project lifecycle
    • Upgrade Network Transmission/Topology/Resilience ongoing during project lifecycle
  • 10. Health and Safety
    • Public shouldn’t be exposed to:
    • - electric field above 41 Volt/meter
    • - magnetic field above 11 Amper/meter
    • 12/07/1999 European Community
    • All European Community regulations Adhered to
  • 11.
    • Electromagnetic Compatibility (EMC)
    • Acoustic noise
    • Safety
    • Product Environmental Attributes
    • Materials
    Health and Safety
  • 12. Health and Safety
    • GSM antenna 4m 10 V/m
    • LargPerquesi(400KV) 100m 200 V/m
    • Refrigerator 30 cm 90 V/m
    • Iron 30 cm 60 V/m
    • Hair dryer 10 cm 40 V/m