Petersberg Phase II / Athens Declaration ProcessProtection and Sustainable Use of Transboundary Waters in SEERoundtable on...
Introduction of the Project                Introduction of the Project•   NTMP is a regional cooperation project ‐ Republi...
Background                                                                • Implementation Teams Legal Basis   gCooperatio...
Project ImplementationProject Implementation Structure                                       Interstate Water             ...
Water Management Characteristics of the Region                       h               f hoThe water regime of theoThe water...
Component 1 – Improved Transboundary Water T    b   d    WResource Management                          Institution and cap...
Subcomponent: Neretva and     Trebišnjica River Basin Management     T biš ji Ri       B i M          t               Plan...
Improved Operation of Reservoirs and HPPs• C d i  Conducting a study to determine the minimum                     d    d  ...
Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj     dekadi (1999-2008.) u poređe...
Precipation Data                          Precipation Data•   Prema podacima Federalnog hidrometeorološkog zavoda, u perio...
THANK YOU FOR YOUR ATTENTION
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
 Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden
Upcoming SlideShare
Loading in...5
×

Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

309

Published on

Neretva and Trebisnjica Management Project
International Roundtable on Protection and Sustainable Use of Trans-boundary Waters in South East Europe, 15-16 December 2011, Zagreb, Croatia

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
309
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
4
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of " Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden"

  1. 1. Petersberg Phase II / Athens Declaration ProcessProtection and Sustainable Use of Transboundary Waters in SEERoundtable on Transboundary Water Management Zagreb, 15 – 16 December 2011 g , Neretva and Trebisnjica Management Project
  2. 2. Introduction of the Project Introduction of the Project• NTMP is a regional cooperation project ‐ Republic of  Croatia and Bosnia and Herzegovina.• Transboundary river basin on the territory of: T b d i b i th t it f • Republic of Croatia  • Dubrovnik‐Neretva County  and • Split‐Dalmatia County • Bosnia and Herzegovina (B&H) • Federation of BiH (FB&H) • Herzegovina‐Neretva Canton (7)/  Western Herzegovina Canton (8) • Herzeg‐Bosnia Canton (10) • Republika Srpska (RS) p p ( ) • Trebinje Region• The Neretva is: • the longest river of the Adriatic catchment area (215  km long, with only 22 km in Croatia)  • the water richest tributary of the Adriatic Sea on the  the water –richest tributary of the Adriatic Sea on the territory of these two countries • complex karst hydrography makes it difficult to define  the exact boundaries of the catchment area (around  10,500 km2) • the water regime of the Neretva River basin has been  significantly modified by the construction of  hydropower facilities in the upper and middle sections  of the Neretva River and on the Trebišnjica River with 7  reservoirs built from 1954 to 1985.
  3. 3. Background • Implementation Teams Legal Basis gCooperation between the Republic of Croatia and Bosnia and  Herzegovina BOSNIA AND  REPUBLIC OF  Agreement between the Governments of Croatia and BiH  HERZEGOVINA  HERZEGOVINA CROATIA regulating water management relations concluded in July  (BiH) 1996 – approved and ratified Grant Agreement concluded in September 2008 with the  g p International Bank for Reconstruction and Development  (IBRD) acting as an Implementing Agency of GEF Project  BiH Project  Implementation Team  Implementation Team Project Agreement concluded with the International Bank for  (PIT)  Hrvatske vode            (PMT & PIT) May 2009 Reconstruction and Development (IBRD) i d l ( ) 19 December 2008 19 December 2008 Memorandum of Understanding signed between Bosnia and Herzegovina and the Republic of Croatia on implementation of  joint activities under the Project joint activities under the Project COORDINATION  COORDINATION  Agreements become effective COMMITTEE   COMMITTEE Croatia – 7 January 2009 BiH – 6 March 2009 8 June 2009 22 October 2009  Official start (meeting in Sarajevo) 12‐13 March 2009
  4. 4. Project ImplementationProject Implementation Structure Interstate Water  Commission Component 1 Component 4 Components 2&3 MRDFWM Coordination  Committee BiH MOFTER HV PIT (5) PMT TA FM MRDFWM (1) Procurement FBiH  MC (2) MAWMF MEPPPC (1) MAFRD (1) RS MAFWM TA Agency for Adriatic Sea  Agency for Adriatic Sea  Watershed, Mostar Watershed, TrebinjeFM Procurement MAWMF MAFWM PIT PIT MET MSPCEE Reporting relation p g Municip. Municip. Working relation
  5. 5. Water Management Characteristics of the Region h f hoThe water regime of theoThe water regime of the Neretva River basin has been significantly modified by the construction of hydropower facilities in the upper and f iliti i th dmiddle sections of the Neretva River and on the Trebišnjica River with River with reservoirs: • Jablanica (1954) ( ) • Rama (1969) • Grabovica (1981) • Salakovac (1981) • Mostar (1985) • Gorica (1965) and Bileća  (1968) • Equalizing basins of Čapljina E li i b i f Č lji pumping HPP in Popovo polje and Svitava (1978)
  6. 6. Component 1 – Improved Transboundary Water T b d WResource Management Institution and capacity building Institution and capacity building Measurement, monitoring, and information management Measurement, monitoring, and information management Development of Water Information System, including GIS Development of Water Information System, including GIS  Development of Neretva and Trebišnjica River Basin  Management Plan (RBMP) ( )
  7. 7. Subcomponent: Neretva and  Trebišnjica River Basin Management  T biš ji Ri B i M t Plan (NTRBMP) • The general goal of the project is to improve water The NTRBMP consists of river basin management plans that address the issues of interest for the entire basin area in a  management and thus ensure the fulfillment and improvement of synchronized manner with special emphasis on the  functions that the watercourses of this basin have in water valorization of transboundary impacts, i.e. impacts between  y p , p management on the national level. griver basin districts. River basin district in  Monitoring Croatia Characterization Status NTRBMP n implementation Implementation Plan  Status River basin River basin district in  district in  FBiH RS Reporting to the e Measures Dead‐lines Funds Competent public Risks institution
  8. 8. Improved Operation of Reservoirs and HPPs• C d i Conducting a study to determine the minimum  d d i h i i environmental flow in the Neretva and Trebišnjica Rivers• Preparing a plan, guidelines, and training program for  optimal management of multipurpose HPP reservoirs  optimal management of multipurpose HPP reservoirs• Developing a dynamic management model for  reservoir operation reservoir operation• Developing and implementing mathematical models  for hydrological predictions, HPP operations,  for hydrological predictions HPP operations forecasting and decision‐making
  9. 9. Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj dekadi (1999-2008.) u poređenju sa referentnim periodom (1961-1990.) u BiH HM postaje.kmz
  10. 10. Precipation Data Precipation Data• Prema podacima Federalnog hidrometeorološkog zavoda, u periodu od 1.11. do 8.12.2010. godine  Prema podacima Federalnog hidrometeorološkog zavoda u periodu od 1 11 do 8 12 2010 godine ukupne padaline sa snijegom na stanici Ivan Sedlo su iznosile 545,00 mm (što je više od 35% od  ukupnog srednjeg godišnjeg prosjeka), na stanici Mostar 491,80 mm, na stanici Livno 446,10 mm,  na stanici Bjelašnica 398,50 mm, na stanici Stolac 461,20 mm, na stanici Neum 339,40 mm.• Prema podacima sa nekih od mjernih stanica AVP Jadranskog mora i elektroprivrednih poduzeća  p j g p p ukupne padaline su iznosile:• Konjic – Hagenuk ‐ od 1.11. do 5.12. ukupno 460,30 mm (u periodu od 17.11.‐5.12. ukupno 270,90  mm)• Glavatičevo most – od 17.11. do 3.12., 354,80 mm (u periodu od 1.11.‐1.12. ukupno 539,20 mm)• Brana HE Jablanica – od 1.11. do 5.12. ukupno 832,10 mm• MP Umoljani – od 1.11. do 8.12. ukupno 711,40 mm• MP Trešnjevica – od 1.11. do 8.12. ukupno 425,20 mm• MP Jasenik  od 1.11. do 8.12. ukupno 414,90 mm MP Jasenik – od 1.11. do 8.12. ukupno 414,90 mm• MP Čuhovići – od 1.11. do 8.12. ukupno 433,00 mm (u periodu od 17.11‐8.12 ukupno 327,30 mm)• MP Jasenjani – od 1.11. do 8.12. ukupno 999,40 mm (u periodu od 17.11‐8.12 ukupno 657,70 mm)• MP Blidinje – od 1.11. do 8.12. ukupno 841,00 mm• HP Humac  – od 1.11. do 8.12. ukupno 343,80 mm (u periodu od 17.11‐8.12 ukupno 255,60 mm) HP Humac od 1 11 do 8 12 ukupno 343 80 mm (u periodu od 17 11 8 12 ukupno 255 60 mm)
  11. 11. THANK YOU FOR YOUR ATTENTION