Your SlideShare is downloading. ×
0
Athens 14-15 09 2011Pr. Redouane Choukr-Allah
• Expert Consultation Wastewater  Management in the Arab World  22-24 May 2011- Dubai-UAE• Second Arab Forum Cairo Egypt  ...
• Expert Consultation Wastewater  Management in the Arab World  22-24 May 2011- Dubai-UAE• Second Arab Forum Cairo Egypt  ...
(109 mm3 /year     9 3  10 /year)  •   300                     256,30      250      200      150      100                 ...
• The annual volume of wastewater discharged in  untreated form in Arab region is 7.5 km3, which is  43% of the total wast...
Financial•    Institutiona                 Policy &     l set-up &                  political     personnel               ...
High construction costs of treatment systems(esp. for small and medium size communities)High O&M costs, e.g. for electrici...
Reduce treatment operation costs, e.g. checkresearch on alternative operating conditions to saveelectricity; broader use o...
Reclamation and reuse of Marrakech             wastewater •Project cost :    15 Million EurosCapacity:      100 000 m3/day...
Methane gas generated in the anaerobicbasins is recovered and converted toenergyTreated wastewater is sold to farmersfor i...
Economical Aspect• Concentrate on demand-driven planningof reuse projects• Cost benefit and cost recovery should beintegra...
•    THANK YOU FOR YOUR ATTENTION
Upcoming SlideShare
Loading in...5
×

007 NCWRM 2011 Choukr-Allah_AWC

288

Published on

Regional Conference on Advancing Non Conventional Water Resources Management in the Mediterranean, 14-15 September 2011, Athens, Greece

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
288
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
12
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "007 NCWRM 2011 Choukr-Allah_AWC"

  1. 1. Athens 14-15 09 2011Pr. Redouane Choukr-Allah
  2. 2. • Expert Consultation Wastewater Management in the Arab World 22-24 May 2011- Dubai-UAE• Second Arab Forum Cairo Egypt November 2011 Session on Non-Conventional water resources
  3. 3. • Expert Consultation Wastewater Management in the Arab World 22-24 May 2011- Dubai-UAE• Second Arab Forum Cairo Egypt November 2011 Session on Non-Conventional water resources
  4. 4. (109 mm3 /year 9 3 10 /year) • 300 256,30 250 200 150 100 9,95 5,74 1,89 50 0 Total water total Volume of Treated withdrawal wastewater treated Wastewater produced wastewater Reused
  5. 5. • The annual volume of wastewater discharged in untreated form in Arab region is 7.5 km3, which is 43% of the total wastewater produced in the region.• 57% of the wastewater generated in Arab region is treated, which is higher than Asia (35%), Latin American/Caribbean (14%) and Africa (1%)• 83% of treated wastewater used in agriculture,• most of the partly treated, diluted or untreated wastewater is used by urban and peri-urban farmers to grow a range of crops.
  6. 6. Financial• Institutiona Policy & l set-up & political personnel commitmen capacity t Health & Awareness environment - & Enforcement acceptance of standards - Monitoring Technical
  7. 7. High construction costs of treatment systems(esp. for small and medium size communities)High O&M costs, e.g. for electricity, equipmentmaintenance, investments in trained personnel –often not recovered by user feesCosts (and lack of funds) to build sewagecollection systemsHigh price of reclaimed WW vs. lowerfreshwater pricesPrice that farmers are willing to pay for reclaimedWW hardly covers O&M costs for WWconveyance and distribution <--> Croprestrictions
  8. 8. Reduce treatment operation costs, e.g. checkresearch on alternative operating conditions to saveelectricity; broader use of solar energy Focus on making reuse more profitable tofarmers (to ultimately recover more costs for reuse oftreated WW via user fees): Research ways to extend list of crops irrigated with WW, e.g. upgrade treatment or apply drip irrigation to avoid contact of crop with WW
  9. 9. Reclamation and reuse of Marrakech wastewater •Project cost : 15 Million EurosCapacity: 100 000 m3/dayProduction (electricity) 16 MWh/day33 Million m3/year are reused to irrigate 17 golfecourses60 km of Pipes and 4 Pumping Stations
  10. 10. Methane gas generated in the anaerobicbasins is recovered and converted toenergyTreated wastewater is sold to farmersfor irrigation purposesReeds from reeds beds are harvested andsoldSewage sludge is dried and compostedwith other organic solid wastes in orderto produce compostCharging a wastewater fee forconnection to sewage
  11. 11. Economical Aspect• Concentrate on demand-driven planningof reuse projects• Cost benefit and cost recovery should beintegrated for sustainability of any reuseproject• Diversify the reuse• Encourage PPP in wastewater treatmentand reuse•
  12. 12. • THANK YOU FOR YOUR ATTENTION
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×