Your SlideShare is downloading. ×
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Modular Construction and Prefabrication: The Masterclass

2,381

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,381
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
132
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. THINKING BEYOND THE OBVIOUS ENDORSED BY IN ASSOCIATION WITH Modular Construction & Prefabrication: The Masterclass Intershore Ensuring cost effective and improved ConstructionProductivity through Modularization and Pre-fabrication y g Pierre Venter Architect 19 - 21 February 2013 Global Prospectus Training Centre, 366 Pretoria Avenue, Randburg SETA Accreditation No. 2502
  • 2. EXPERT FACILITATORSHear From Your Industry ExpertsRick Bartoloti CEO/President, Universal Modular Building SolutionsMr. Nader Elhajj Regional Director, FRAMECAD SolutionsHans Rossocha Professional Engineer - Engineering Director, Group Five Engineering and Construction (Pty) LtdLlewellyn van Wyk Modular Construction Specialist, CSIR Built EnvironmentPino Plumari Managing Director, Sassi ConstructionPierre Venter Principle, Pierre Venter ArchitectBenson Mseleku Operations Director, Intershore Africa MOTIVATION & OVERVIEWInternationally infrastructure is ageing rapidly and there is increased utilisation of infrastructure due to urbanisation and globalisation.Significant amounts are invested globally to address this issue, although funding fluctuates from year to year. One response tothis situation is to position the construction industry with advanced technological solutions such as Modular Construction andPrefabrication. However, the construction industry is renowned for low levels of innovation. In South Africa research into moderninfrastructure is underfunded. There is a need to stimulate innovation in the construction industry to develop the uniquely SouthAfrican technological solutions required to provide and maintain economic and social infrastructure.An investment into Modular construction and Prefabrication innovation should be based on a review of the current state ofconstruction technologies in the industry and an analysis of the drivers and trends that will shape the future construction industrylandscape. This Masterclass describes a new approach to integrate Modular Construction within the African construction industryas a whole.Construction efficiency, productivity and sustainability can be realized through the use of modular construction and prefabrication.This 3 day Masterclass delves into ways in which modular construction and prefabrication provides a more cost effective alternative.It looks into issues of infrastructural advancements, health and safety of modular structures, environmental effects (going green)and construction project and risk management, it will provide in-depth discussions into advantages and disadvantages of modularconstruction and integrating Building Information Modeling (BIM) and will also discuss the barriers hindering the growth of modularconstruction and prefabrication in Africa. All these will be achieved through up to date case studies and presentations by renownedlocal and international industry experts who will provide well-rounded global perspectives.GLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj PillayJohannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc.Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates
  • 3. BENEFITS & OUTCOMEModular Construction and Prefabrication is now in national development programs in Europe, United States and Australia,where it is seen as an important way for improving quality and cost within a slow changing construction industry. Withemerging technologies and recent resurgence of interest in Modular Construction and prefabrication design globally, we arelikely to see this trend gaining momentum in the African construction industry. This Masterclass is pertinent therefore as it willafford insight into the fast evolving Modular Construction and Prefabrication industry in Africa.It will provide answers to issues like:• Why Modularize?• Is Modular truly the cost effective alternative?• How much can you modularize?• What determines the type of modular method to be used - Hybrid Modularization?• Who are the key players, who should you partner with?Come and network with Industry experts to discuss the commercial viability of modular projects,this will enable you to:• Gain Insight into Project Risk Identification, management processes and procedures• Understand the benefits and effective trends of modularization in mining construction projects• Discover how modularization and prefabrication is an answer to military construction spending• Understand how you can mitigate transport and logistics concerns for modular construction with emphasis on heavy lifting of large Structures• Learn how you can effectively incorporate Building Information Modeling (BIM) to help overcome obstacles of efficiency created by process fragmentation• Gain a better understanding of the basis on what methods of modular is applicable to your project• Gain insight into effective procurement and sourcing strategies• Explore the various design inputs to ensure modular construction safety• Discover how you can incorporate various modular techniques in a project - Hybrid Modularization• Gain insight into how you can deal with the social and environmental impact of your projects WHO SHOULD ATTEND• Head of Engineering • Architects• Construction Manager • Design and Coordination Manager• Asset Owner • Safety and Health Officers• Modular Construction Manager • Quality Control Managers• Head of Projects • Business Development Managers• Director of Project Commissioning and execution • Area Superintendent• Technical Service Manager • Commissioning Managers• Procurement Manager • Estimators• Structural ,Mechanical and Civil Engineers • Fabrication ManagersFrom the following industries:• Engineering Procurement Construction • Fabrication• Mining and Mineral • Construction• Logistics and Shipping • Government Agencies• Design Consultants • Property Development• Oil and Gas • Infrastructure GLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj Pillay Johannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc. Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates
  • 4. DAY 1 08:00 - 08:30 Registration and morning refreshments 14:15 - 15:15 Significant aspects of modularization and constructability to consider when 08:30 - 08:40 Opening remarks from the chair working with Engineering, Procurement, and Construction 08:40 - 09:30 What is Modular construction Management (EPCM) capital Projects and Prefabrication? • Why Modular? • Background look into the Modular Construction and Prefabrication - What do we bring to the party? industry • Architectural Design • An in-depth look into the growth, innovation and advancement of - Compatibility? technology - Can you build it in a factory? • Green Buildings - Benefits and advantages • Module size • Future Trends in the prefabrication Industry - Can you transport it? • Size, height, weight? Llewellyn van Wyk - Modular Construction Specialist, - Distance from manufacturing facility? CSIR Built Environment • Road conditions Rick Bartoloti - CEO/President, - Interior and exterior finishes Universal Modular Building Solutions • Can you finish the exterior and interiors in the factory? - Windows • Sizes? 09:30 - 10:30 Developing an effective and - Doors successful modularization strategy • Factory or site installed? for major projects • General Contractor and Manufacturer control the project as above • Identify Client needs • Customizing the housing solution/Layout Rick Bartoloti - CEO/President, Universal Modular Building • Planning major work activities and identifying logistics options Solutions • Streamlining the site activities • Implementing the project execution Plan 15:15 - 15:30 Afternoon Tea Hans Rossocha - Professional Engineer - Engineering Director, Group Five Engineering and Construction (Pty) Ltd 15:30 - 16:30 Volumetric prefabrication, utilizing precast concrete structures 10:30 – 10:45 Mid-Morning Tea Break Rick Bartoloti - CEO/President, Universal Modular Building Solutions 10:45 – 11:45 Case Study Goldflex: Your Passport to Africa 16:30 - 17:00 Demonstrating the benefits of Hans Rossocha - Professional Engineer - Engineering modularization in Mining, a tool for housing projects Director, Group Five Engineering and Construction (Pty) Ltd Pictures and examples • Repeatability 11:45 – 12:15 Underlining the benefits and risks of - Improves efficiency in manufacturing • Remote sites using overseas fabricators vs. local - lack of labor fabrication yards - Lack of materials • Identifying the potential benefits that will be targeted - Logistics • Highlighting the risk factors that must be addressed • Speed of completion • How to compare benefits and risks of various fabricator yard options For Housing Projects across so many project dimensions • Pictures and examples • How to quantify the track performance against projected benefits • Repeatability • Build a business case for modularization - Improves efficiency in manufacturing • Speed of completion Pino Plumari - Managing Director, Sassi Construction - Speed reduces cost of overall project • Improved quality 12:15 – 13:15 Networking Lunch - Indoor manufacturing - Controlled environment 13:15 – 14:15 Overcoming the design dynamics when - More rigid quality control utilizing modular construction - Fewer inspectors Rick Bartoloti - CEO/President, Universal Modular Building Mr. Nader Elhajj - Regional Director, FRAMECAD Solutions SolutionsGLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj PillayJohannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc.Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates
  • 5. DAY 2 08:00 - 08:30 Registration and morning refreshments needed, particularly if the operator has only a small stake in the venture. 08:30 - 08:40 Opening remarks from the chair • Experience – Do you have experience of exploration and production in this country - Does anyone? • Field location – How developed is the region in terms of 08:40 - 09:30 Increasing Productivity in the infrastructure and existing developments? Construction Industry by • Operating environment – What conditions will you face? incorporating Building • Water depth – How deep are you building your offshore facilities? Information Modeling (BIM) • Technology/innovation – Are you using or enhancing current • An Introduction to BIM technology or systems? • Successful implementation of BIM throughout the life cycle of a • Complexity – How many different facilities are there? building • Understanding how to integrate Project Management to the core • Levels of supervision – How experienced are the major teams? component of BIM • Track record – How experienced is your project management team? Influence Factors • Contracting strategy – Have you used this strategy before? • Drivers for use of prefabrication and modularization • Project schedule – Are you trying to fast-track this project? • Factors driving future use of prefabrication / modularization for non-users Pierre Venter - Principle, Pierre Venter Architect • Non-users’ current reasons for not using prefabrication/modularization on projects 12:30 - 13:30 Networking Lunch • Users’ current reasons for not using prefabrication/modularization on some projects 13:30 - 14:30 Steel Modular designs for high rise 09:40 - 10:30 Prefabricated and Modular buildings/ advantages of Steel Building Elements Mr. Nader Elhajj - Regional Director, FRAMECAD Solutions • Influence of job site conditions • Most commonly used prefabricated and modular building elements 14:00 - 15:30 Modular construction, a key to Green Building • Using prefabrication/modularization on green building projects Military Construction spending • Stepped up demand for alternative procurement and delivery methods • Construction waste • Greater emphasis on fast track scheduling and prefabricated systems • Materials • Modular meeting high standards set by United States Military (includes Model-Driven (BIM) Prefabrication case study) • Usage • Enhancing sustainability while holding down costs • Drivers • Piloting net-zero in energy, water and Waste • Life cycle management for military camps Pierre Venter - Principle, Pierre Venter Architect • Managing classified information and security requirements for military installations 10:30 - 10:45 Networking Tea Break • Pictures and examples • Tight budgets 10:45 - 11:45 Stream One • Flexibility - Permanent Effective Cost and Engineering Management - - Temporary integrating Building Information Management - Remote sites (BIM) for sustainable design, construction and high • Excellent for training performance buildings - Classrooms At a time when schedules and budgets is key to effective project and - Housing for simulators productivity success, and the vast knowledge gap and lack of practical • examples experience to in Modular Construction and Prefabrication techniques in Africa - MOUT Villages is rising; this Masterclass will provide current, innovative, sustainable and cost • Examples effective processes and strategies for looking at large scale projects. Rick Bartoloti - CEO/President, Universal Modular Building • Achieving the necessary rate of return on the capital investment Solutions • Implementing and demonstrating robust levels of governance through 15:30 - 15:45 Afternoon Tea Break the project cycle • Developing appropriate commercial and management strategies to manage risks 15:45 - 17:00 Panel Discussion Is Modularization and Prefabrication 11:45 - 12:30 Stream Two the cost effective option? Drivers of project management costs If project value can’t be used as an indicator of project management cost, Hans Rossocha - Professional Engineer - Engineering where should operators look to help them estimate project management Director, Group Five Engineering and Construction (Pty) Ltd costs? In Analysing members’ data, the Performance Indicator found a number Pino Plumari - Managing Director, Sassi Construction Rick Bartoloti - CEO/President, of other factors that drive up these costs, including: Universal Modular Building Solutions • Ownership – Multiple partnerships will increase the negotiation Mr. Nader Elhajj - Regional Director, FRAMECAD SolutionsGLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj PillayJohannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc.Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates
  • 6. DAY 3 08:00 - 08:30 Registration and morning refreshments 13:30 - 14:30 Understanding the most effective procurement and contracting 08:30 - 08:40 Opening remarks from the chair strategies for large scale projects • The best method is that the project be completed by 3 or 4 parties 08:40 - 09:30 Developing an effective module - Architect execution team with the right • Origination (has client) • Basic Design (not too many familiar with modular) logistic support - General Contractor • Understanding the specific support required to develop a modular • Sub contract engineering, and site utilities project team using an engineering team with predominate stick build - Manufacturer (can be Contractor also) experience • Early module oriented engineering and logistics support a tool for Benson Mseleku - Operations Director, Intershore Africa successful projects Rick Bartoloti - CEO/President, • How to mitigate the logistical challenges of moving modular Universal Modular Building Solutions construction over land • Insight into best practice on delivering successful onshore modular 14:30 - 15:30 Developing a successful preassembly projects strategy for major projects Pino Plumari - Managing Director, Sassi Construction • Pictures and examples • Thus far I have focused on 3 dimensional modular • There are other options 09:30 - 10:30 Strengthening construction risk • Panelized sections management by incorporating • Pre-assembled components tools and strategies used for project • Component Structures planning while enveloping time • Combination of many • Hybrid reduction initiatives Rick Bartoloti - CEO/President, • Risk management during the proposal stage Universal Modular Building Solutions • Risk management during contract negotiations • First ten days after project award 15:30 - 15:45 Afternoon Tea Break • Management of risk during project execution • Completion of the last 10% of work 15:45 - 16:45 Panel Discussion Benson Mseleku - Operations Director, Intershore Africa Advantages and Disadvantages of Modularization 10:30 - 10:45 Networking Tea and Prefabrication Discussing the positive impact of Modularization on your projects 10:45 - 11:45 Transport and logistics concerns for • Fast track assessing important aspects in heavy lifting of large • High quality structure • Labor intensive • This subject will require some research • Good use of local materials • Availability of equipment can be an issue • In the US transport and movement of large modules is usually not Discussing key challenges an issue • Limited design flexibility • Sizes can be tailored to conditions • Slightly higher cost in materials and skills • More to come... • Continuous coordination between stakeholders • Transport limitations Rick Bartoloti - CEO/President, Universal Modular Building Solutions Pino Plumari - Managing Director, Sassi Construction Hans Rossocha - Professional Engineer - Engineering Director, Group Five Engineering and Construction (Pty) Ltd 11:45 - 12:30 Modularization and prefabrication Rick Bartoloti - CEO/President, safety, design input & how to protect your work force Universal Modular Building Solutions • Factory vs. Site is much safer - Environmental 16:45 - 17:00 Completion of Evaluation Forms, - Weather handing out Certificates and - Controlled environment closing remarks by the Chair - Fewer workers on site - Less daily travel Rick Bartoloti - CEO/President, Universal Modular Building Solutions 12:30 - 13:30 Networking LunchGLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj PillayJohannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc.Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates
  • 7. Modular Construction and Prefabrication: ONLY The Masterclass R849 19 - 21 February 2013 Per D eleg 0Registration Form Global Prospectus Training Centre, ex. VA ate, T. 366 Pretoria Avenue, RandburgGPW Marketing Fax Completed Registration Form To: +27 11 781 6044Company Name:Type of Business:Address:Tel: Fax: VAT Number:Delegate 1:Position: E-Mail:Delegate 2:Position: E-Mail:Delegate 3:Position: E-Mail:Delegate 4:Position: E-Mail:Delegate 5:Position: E-Mail:AUTHORISATION: Signatory must be authorised to sign on behalf of Company CREDIT CARDName: Cardholder’s Name: DETAILSPosition: Credit Card Number:Signature: Date: CVC No: Expiry Date:PAYMENT METHODS1. Bank Transfer - Global Prospectus Training (PTY) Ltd. 2. Credit card - Please fill in your credit card details above First National Bank: Randburg 3. Cheques - Made Payable to: Global Prospectus Training (PTY) Ltd. Account Number: 62109 270372 Branch Code: 254005TERMS & CONDITIONSThe following terms and conditions will apply: Substitutions Payment is required in full 5 days from date of invoice Delegates must inform Global Prospectus Training (PTY) Ltd in writing All payments to be made directly to Global Prospectus Training (PTY) Ltd. of any substitutions. No seats will be reserved, unless Global Prospectus Training (PTY) Ltd. receives a signed registration form. There is no charge for substitutions. Global Prospectus Training (PTY) Ltd. reserves the right, due to circumstances beyond our control, to change Global Prospectus Training (PTY) Ltd will not be held liable for incorrect speakers, program content, date & venue. Delegate details on Certi s, etc. in the event of substitutions being The signed registration form is a legally binding contract. made on the day of the conference. In the event of Global Prospectus Training (PTY) Ltd having to cancel or postpone an event due to circum-Cancellations stances beyond our control, delegates will be issued with a credit voucher,All cancellations will be subject to approval by the management of Global Prospectus Training (PTY) Ltd. - which may be used at another of our events.All cancellations made 7 days prior to date of the above mentioned event will be subject to a 50% cancellation fee.Cancellations made within 7 days of date of the above mentioned event, will be subject to a 100% cancellation fee. - Global Prospectus Training (PTY) Ltd will not be held liable for travel and accommoda -The will be no refunds or credit vouchers. tion costs. The conference fee includes: conference material, lunches and refreshments, but excludes travel & accommodation.GLOBAL PROSPECTUS TRAINING (PTY) LTD. Chief Executive O er - Dhevaraj PillayJohannesburg - Tel: +27 11 781 6222 Fax: +27 11 781 6044 Marketing - m2@globalprospectus.co.za Auditors - Russell Bedford SA (Jhb) Inc.Pietermaritzburg - Tel: +27 33 391 4229 Fax: +27 33 391 5722 Design - www.designmaster.co.za (071 018 8355) Legal - DA Morris & Associates

×