FITMAN Phase III Webinar
Upcoming SlideShare
Loading in...5
×
 

FITMAN Phase III Webinar

on

  • 534 views

Katerina Achinioti (Innovalia Association)

Katerina Achinioti (Innovalia Association)
Clare Hooper (IT Innovation)

Statistics

Views

Total Views
534
Views on SlideShare
528
Embed Views
6

Actions

Likes
0
Downloads
0
Comments
0

1 Embed 6

https://twitter.com 6

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

FITMAN Phase III Webinar FITMAN Phase III Webinar Presentation Transcript

  • FITMAN Phase III Webinar Katerina Achinioti1, Clare Hooper2 (1 Innovalia Association, 2IT Innovation) 19 November 2013 19/11/2013 FITMAN Phase III Webinar 1
  • Agenda • • • • FITMAN Phase III Webinar – Purpose FITMAN Phase III Package SME Engagement methodologies Q&A 19/11/2013 FITMAN Phase III Webinar 2
  • FITMAN Phase III Webinar – Purpose • Support Phase III participants who wish to  build on FITMAN work and/or address ICT in  manufacturing • Present an overview of FITMAN deliverables,  methodologies for SME and web entrepreneur  engagement, and other Phase III related  information.  19/11/2013 FITMAN Phase III Webinar 3
  • FITMAN Phase III Package fitman‐fi.eu/phase‐iii‐package Clare Hooper IT Innovation 19/11/2013 FITMAN Phase III Webinar 4
  • The FITMAN Phase III Package 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 5
  • User registration • Please register to access the consultation documents and forum • Visit fitman‐fi.eu/phase‐iii‐package 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 6
  • Phase III Package Content:  Methodologies and Tools • Summaries of FITMAN ‘verification and validation’  (V&V) deliverables – – – – 19/11/2013 V&V method and criteria Business and technical indicators Assessment package and its instantiation SMEs innovation preparation (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 7
  • Phase III Package Content: Architecture and Trials • Summaries of FITMAN ‘baseline system’ and  ‘experimentation sites’ deliverables – – – – – – – – – Use Case Scenarios and Business Requirements Trials IT Requirements Generic Enablers Selection FI‐WARE Platform Instantiation  Reference Architecture FI PPP Capacity Building Analysis Trials IT infrastructure/platforms Trials Business Cases Competencies / Capability Gaps and Open Call  Specifications 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 8
  • Phase III Package Content: Further materials • T&Cs for envisaged FITMAN Specific Enablers • Checklists – legal issues – business models – external resources • Intermediaries’ best practices for Phase III • The consultation documents themselves 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 9
  • Services • Support – please send questions to fitman‐phase‐iii‐ info@txtgroup.com  – Questions and answers will be hosted on the FAQ  fitman‐fi.eu/phase‐iii‐package/support/faq – A forum is online at fitman‐fi.eu/phase‐iii‐ package/support/forum • Notification of updates – Via social media (twitter.com/FitmanFI and  linkedin.com/groups?gid=4986259) – Via email (please request this by contacting us on the  email address above) 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 10
  • Phase III Package: Summary • The Package provides  information and services for  Phase III Participants – Information based on FITMAN  deliverables, plus supporting  materials such as checklists and  Specific Enabler T&Cs – Services including an email  address for queries, FAQ, forum  and information about updates. • fitman‐fi.eu/phase‐iii‐package 19/11/2013 (C) 2013 University of Southampton IT Innovation Centre  and other FITMAN partners 11
  • SME engagement Methodologies Katerina Achinioti Innovalia Association 19/11/2013 FITMAN Phase III Webinar 12
  • Identifying best practices and lessons learnt Kind of need Designing the SME engagement strategy When SME engagement planning – Open Calls  preparations FITMAN  contribution  Identify best practices on SME engagement  Lessons learned on FI‐PPP engagement on  FITMAN Source: Google pictures 19/11/2013 FITMAN Phase III Webinar 13
  • Creating technology awareness Kind of need When FITMAN  contribution Creating technology awareness – engaging new  users Issuing Open Calls  Methodology for creating technology awareness  http://businesssearch.dnb.com/small‐business‐tips/marketing‐your‐small‐business‐online‐and‐off/ 19/11/2013 FITMAN Phase III Webinar 14
  • Support for service/application development Kind of need Developing a service/application  When Developing a project under the Open Calls FITMAN  contribution  Lean start‐up principle and Minimum Viable Product (MVP)  concept in FITMAN  Co‐creation concept applied in FITMAN  Local service hypothesis and trial to support the development  of SME Service/Applications  Local FITMAN ICT infrastructure deployment to support the  development of SME Service/Applications  Data gathering and feedback Source: Google pictures 19/11/2013 FITMAN Phase III Webinar 15
  • Communicating Phase III achievements Kind of need Communicate the achievements  generated in Phase III When Project completion FITMAN   Methodology for proactive  contribution communication of achievements  and innovations generated by  SMEs in Phase III (5 Stages) Source: Google pictures 19/11/2013 FITMAN Phase III Webinar 16
  • Questions & Answers 19/11/2013 FITMAN Phase III Webinar 17