Uploaded on

Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014 …

Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014
Team Finland: презентация индустриальных парков в Санкт-Петербурге 23.4.2014

More in: Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,217
On Slideshare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. April 2014
  • 2. Part of the CONSTRUCTOR GROUP - one of the largest sales and technical support organization in Europe, which has factory in Finland. CONSTRUCTOR RUS is today a full scale supplier of storage and logistic solutions for the industry and trade – stationary, mobile archive , machines and many other variety of storage solutions.
  • 3. • 2008 – Setting up a company CONSTRUCTOR RUS; Acquisition of the premises in Kirovsk (Leningradskaya obl.) • 2009 – Launch of the Factory; Pallet racking P90 production started: uprights, painted beams • 2010 – Shelves profiling line put into operation • 2011 – Brace profiling line put into operation • 2012 – Combi uprights profiling line put into operation • 2013 – Opening of a branch office in Moscow, Krasnodar and Nigniy Novgorod • 2014-nowadays – Investment development -New powder painting system implementation
  • 4. Factory was put into operation within 1 year after the purchase. This was achieved due to parallel and timely provisions for: Construction (modernization project), requires approval from authorities, Building work, Project for production (requires approval from authorities), Import of machinery, Recruitment, Assembly and installation of equipment.
  • 5. Location – Kirovsk, L.O. Despite of remoteness from Saint-Petersburg, there is an opportunity to gain to the Factory by public transport (bus 565). It takes up over 25-30 minutes to be there from metro station “Ulitsa Dybenko”. Today CORU is a high developing manufacturing company with its own production, logistics, sales department and etc. Labour supply – over 100 workers
  • 6. Raw Materi als ware- house Beams prof. line Uprights prof. line Degreasing zone Factory floor space – 12 000 m² Inner Yard – 3 000 m² Painting zoneWelding stations Painting: loading Drying tunnel Curing oven Painting: unloading & packing Finished products & goods warehouse Shelving linewarehouse Braces line Office INNER YARD A90-uprights line
  • 7. Resource utilities (average) Resource 1 Electricity Electric power consumption 86 262 kWhe/month Price 3,25 RUR per kWhe 2 Water Water consumption 68,66 cum/month Price 115 RUR per cum 3 Sewage Discharge 58,2 cum/month Price 282 RUR per cum 4 Gas Gas consumption 19 925 cum/month Price 5 044,73 RUR per cum 5 Heat power Heat power consumption 344,37 Gcal/month Price 1 547,52 RUR per Gcal Nowadays, the Factory is provided by all necessary resources to operate on maximum capacity.
  • 8. PRODUCTS & SERVICES
  • 9. STEEL STORAGE STORAGE STORAGE BANKING
  • 10. We are stronger together! Unavailability of information Cultural differences Political restrictions Competition