Constructor
Upcoming SlideShare
Loading in...5
×
 

Constructor

on

  • 1,245 views

Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014 ...

Team Finland: Luoteis-Venäjän teollisuuspuistojen esittelytilaisuus Pietarissa 23.4.2014
Team Finland: презентация индустриальных парков в Санкт-Петербурге 23.4.2014

Statistics

Views

Total Views
1,245
Views on SlideShare
1,245
Embed Views
0

Actions

Likes
0
Downloads
3
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Constructor Constructor Presentation Transcript

  • April 2014
  • Part of the CONSTRUCTOR GROUP - one of the largest sales and technical support organization in Europe, which has factory in Finland. CONSTRUCTOR RUS is today a full scale supplier of storage and logistic solutions for the industry and trade – stationary, mobile archive , machines and many other variety of storage solutions.
  • • 2008 – Setting up a company CONSTRUCTOR RUS; Acquisition of the premises in Kirovsk (Leningradskaya obl.) • 2009 – Launch of the Factory; Pallet racking P90 production started: uprights, painted beams • 2010 – Shelves profiling line put into operation • 2011 – Brace profiling line put into operation • 2012 – Combi uprights profiling line put into operation • 2013 – Opening of a branch office in Moscow, Krasnodar and Nigniy Novgorod • 2014-nowadays – Investment development -New powder painting system implementation View slide
  • Factory was put into operation within 1 year after the purchase. This was achieved due to parallel and timely provisions for: Construction (modernization project), requires approval from authorities, Building work, Project for production (requires approval from authorities), Import of machinery, Recruitment, Assembly and installation of equipment. View slide
  • Location – Kirovsk, L.O. Despite of remoteness from Saint-Petersburg, there is an opportunity to gain to the Factory by public transport (bus 565). It takes up over 25-30 minutes to be there from metro station “Ulitsa Dybenko”. Today CORU is a high developing manufacturing company with its own production, logistics, sales department and etc. Labour supply – over 100 workers
  • Raw Materi als ware- house Beams prof. line Uprights prof. line Degreasing zone Factory floor space – 12 000 m² Inner Yard – 3 000 m² Painting zoneWelding stations Painting: loading Drying tunnel Curing oven Painting: unloading & packing Finished products & goods warehouse Shelving linewarehouse Braces line Office INNER YARD A90-uprights line
  • Resource utilities (average) Resource 1 Electricity Electric power consumption 86 262 kWhe/month Price 3,25 RUR per kWhe 2 Water Water consumption 68,66 cum/month Price 115 RUR per cum 3 Sewage Discharge 58,2 cum/month Price 282 RUR per cum 4 Gas Gas consumption 19 925 cum/month Price 5 044,73 RUR per cum 5 Heat power Heat power consumption 344,37 Gcal/month Price 1 547,52 RUR per Gcal Nowadays, the Factory is provided by all necessary resources to operate on maximum capacity.
  • PRODUCTS & SERVICES
  • STEEL STORAGE STORAGE STORAGE BANKING
  • We are stronger together! Unavailability of information Cultural differences Political restrictions Competition