8 Dave Glanzer Technology Update
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

8 Dave Glanzer Technology Update

on

  • 693 views

Dave Glanzer, Director of Technology Development with the Fieldbus Foundation talks about the latest advances in FOUNDATION technology from ROM to SIF and FDI.

Dave Glanzer, Director of Technology Development with the Fieldbus Foundation talks about the latest advances in FOUNDATION technology from ROM to SIF and FDI.

Statistics

Views

Total Views
693
Views on SlideShare
693
Embed Views
0

Actions

Likes
0
Downloads
12
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

8 Dave Glanzer Technology Update Presentation Transcript

  • 1. 基金会现场总线最新技术 Technology UpdateDave Glanzer现场总线基金会技术研发部总监Director of Technology DevelopmentFieldbus Foundation 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 2. 议程 TopicsFOUNDATION™ for Remote Operations Management Technical Specification Development Program End User Demonstration ProgramFOUNDATION™ 技术应用于远程操作管理 技术规范开发计划 设备演示Field Device Registration 现场仪表注册情况Host System Registration主机系统注册情况FOUNDATION™ for Safety Instrumented Functions安全仪表功能Segment Design Tool网段设计工具Field Device Integration (FDI) 现场设备整合 (FDI)
  • 3. Technical Specification Development Program 技术规范开发计划 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 4. FOUNDATION for Remote Operations Management Application Example远程操作管理 Remote ProcessShared Wireless Video 远程过程 WIFI, WIMAX,Backhaul Network SATELLITE共享无线回传网络 CELLULAR, ETC. HSE Video 视频 High Speed Ethernet 高速以太网(HSE) H1 HART® Conventional I/O Modbus 传统 I/O Wireless Sensors无线传感器 (e.g. WirelessHART®, ISA100.11a) Control Room 2013 General Assembly End User Conference 控制室 Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 5. FOUNDATION for Remote Operations Management Specification Development Teams 远程操作管理规范开发小组 Wireless Backhaul Team 无线回传小组 HSE HSEConventiona l HART® I/O Modbus H1 HSE Remote I/O Team Wireless Sensor 高速以太网远程 I/O 小组 Interface Team 无线传感器集成小组 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 6. FOUNDATION for Remote Operations Management Wireless Backhaul Security Example 远程操作管理无线传输的安全性 Remote ProcessControl Room 远程过程 控制室 ISA-TR100.15.01-2012: Backhaul Architecture Model: Secured Connectivity over Untrusted or Trusted Networks PV PV Security Security 防护墙 防护墙 Wireless Backhaul HSE 无线传输 HSE #8%%0@!!(%0 Secure Tunnel
  • 7. FOUNDATION for Remote Operations Management Technical Specifications 远程操作管理技术规范 H1 + HSE Basic Control Advanced Control 基本控制 先进控制Analog Input Analog Alarm 16 Channel Analog InputAnalog Output Arithmetic 16 Channel Analog OutputBias & Gain Deadtime 64 Channel Discrete InputControl Selector Device Control 64 Channel Discrete OutputDiscrete Input 8 Channel Analog InputDiscrete Output 8 Channel Analog Output Wired HART ® ConnectivityManual Loader 8 Channel Discrete InputPD Control 8 Channel Discrete Output Wireless ConnectivityPID Control Flexible Function Block Wireless HSE BackhaulRatio Control Input Selector Integrator Wireless Field Devices Lead/Lag WirelessHART® Safety Setpoint Ramp Generator ISA100.11aInstrumented Signal Characterizer Output Splitter Modbus Connectivity Functions Timer 安全仪表功能 Totalizer
  • 8. FOUNDATION for Remote Operations Management Specification Development Timeline 远程操作管理规范开发时间表2007 Specification Team KickoFf – Conventional I/O, HART, WirelessHART Jan 技术规范小组成立 – 传统 I/O, HART, WirelessHART2008 Draft Preliminary Specifications – Conventional I/O, HART, WirelessHART Oct 初步技术规范草案 – 传统 I/O, HART, WirelessHART2009 Wireless Backhaul Networking Team KickoFf无线传输网络小组成立 Jan Validation Team KickoFf Meeting验证小组成立会议 Feb Laboratory Prototypes – Conventional I/O实验室验证测试– 传统 I/O Aug2010 Laboratory Prototypes – HART实验室验证测试– HART Mar Laboratory Prototypes – Wireless Backhaul实验室验证测试– 无线传输 Aug Laboratory Prototypes - WirelessHART 实验室验证测试- WirelessHART Nov ISA100.11a Interface Development Team KickoFf ISA100.11a 界面开发小组成立 Oct2011Final Specifications – Conventional I/O 最终测试 – 传统I/O AprWireless Backhaul Architecture Model Approval by ISA100.15 Oct ISA100.15通过无线传输结构模式 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 9. FOUNDATION for Remote Operations Management Specification Development Timeline 远程操作管理规范开发时间表2012Wired and WirelessHART Final Specifications有线及WirelessHART 的最终规范 AprISA100.11a Interface Draft Preliminary Specification ISA100.11a 界面初步草案规范 AprWireless HSE Profile Team KickoFf – San Diego Wireless 高速以太网小组成立 –圣地亚哥, JunLaboratory Prototypes ISA100.11a Interface实验室验证测试ISA100.11a 界面 SepWireless Backhaul Architecture Model Approval by ISA S&P Board ISA S&P董事会通过无线传输结构模式 OctWireless HSE Backhaul Profile Team Meeting – Orlando Oct Wireless 高速以太网传输小组会议 -奥兰多2013Wireless Backhaul Profile Team Meeting – Orlando Wireless高速以太网传输小组会议 -奥兰多 FebISA100.11a Interface Validation Completed ISA100.11a界面测试完成 MarModbus Interface KickoFf Meeting Modbus 界面工作组成立会议 AprISA100.11a Interface Final Specification ISA100.11a 界面最终规范 JulModbus Integration – Use Case and Requirements Modbus 集成 – 系统功能描述及要求 SepWireless HSE Profile for Wi-Fi Wireless HSE wi fi 使用概要 Nov2014Modbus Interface Draft Preliminary Specification Modbus 界面初步规范 MarLaboratory Prototypes Modbus Interface 实验室验证测试Modbus界面 MayModbus Integration – Laboratory Validation Complete Modbus集成 –实验室验证完成 Dec 2013 General Assembly2015 End User ConferenceModbus Integration – Final Specification Modbus集成 – 最终规范 Shanghai, China May © 1994 – 2013 Fieldbus Foundation
  • 10. End User Demonstration Program 设备演示 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 11. FOUNDATION for Remote Operations ManagementEnd User Demonstration Program Sponsors远程操作管理 系统赞助企业
  • 12. FOUNDATION for Remote Operations ManagementLee College Houston Area and GA Sao Paulo远程操作管理系统演示休斯顿Lee College及 巴西全球用户大会
  • 13. FOUNDATION for Remote Operations ManagementACHEMA – Frankfurt远程操作管理系统展示 ACHEMA展会 – 法兰克福
  • 14. FOUNDATION for Remote Operations ManagementJEMIMA – Osaka程操作管理系统展示 JEMIMA展会 – 大阪
  • 15. FOUNDATION for Remote Operations Management Petrobras – Rio de Janeiro 远程操作管理系统展示 Petrobras 展会–里约热内卢 Security Switch HSE HSE H1 H1 H1 HSE Switch Security Control Room WirelessHART ISA100.11aHSE Remote Process Distillation Column
  • 16. FOUNDATION for Remote Operations Management Demonstration Timeline远程操作管理路演时间表2011FOUNDATION for ROM Demonstration at Lee College – Houston Area Dec 远程操作管理系统路演:休斯顿Lee College2012FOUNDATION for ROM Demonstration at General Assembly - Sao Paulo Mar 远程操作管理系统路演:巴西全球用户大会FOUNDATION for ROM Demonstration at ACHEMA - Frankfurt Jun 远程操作管理系统路演:法兰克福ACHEMA展会FOUNDATION for ROM Demonstration at JEMIMA – Osaka Nov 远程操作管理系统路演:大阪JEMIMA展会2013FOUNDATION for ROM Demonstration at Petrobras CENPES – Rio de Janiero Apr 远程操作管理系统路演:里约热内卢Petrobras CENPES展会2014FOUNDATION for ROM Demonstration at Reliance – Jamnagar Feb 远程操作管理系统路演:印度Reliance展会FOUNDATION for ROM Field Trail and Demonstration Japan TBD 远程操作管理现场试运行及展示:日本FOUNDATION for ROM Demonstration at Shell – Amsterdam TBD 远程操作管理系统路演:阿姆斯特丹壳牌公司2015FOUNDATION for ROM Demonstration at Saudi Aramco TBD 2013 General Assembly 远程操作管理系统路演:沙特阿拉伯石油公司 End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation
  • 17. Field Device Registration 现场设备注册
  • 18. Field Device Test现场设备测试 功能 块 互操作 转换器 Function Block 测试工具包(ITK) Transducer Interoperability Block Test Kit (ITK)  Registered Device Device 设备 注册设备Communication Stack 通讯栈 Registered DD Device Description 注册 DD (DD) 设备描述(DD)
  • 19. Registered Device Trend注册设备不断增加
  • 20. Registered Devices by Type注册设备种类 访问端主机 温度 变送器 线缆 分析 转换器 压力变送器 密度计 诊断 电源功率调节器 液位 最终控制单元 集成式 流量计 主机 基金会设备耦合器 I/O 模块 网关 链接设备 基金会隔离设备耦合器
  • 21. Field Diagnostics Feature – NAMUR NE-107 现场诊断特性Send diagnostics to the right place at the right time Fully Supported in ITK 6.0 and in Host Test 界面测试工具包6.0及主机测试能够实现 及时将诊断信息送到适当的地方 失效 功能检测 不符规范 需要维护
  • 22. Host Registration 主机测试
  • 23. Class 62 – 访客主机 Host Registration主机测试 Class 62 – Visitor Host Operations Engineering MaintenanceClass 61 – Integrated Host Class 61 – 集成式主机 Class 63/64 – 台式主机 Class 63/64 – Bench HostNote: Illustrations are examples only. Supplier defines host.注: 以上图片只是举例,主机由供应商决定.
  • 24. Registered Hosts注册设备 2008 2009 2010 2011 20121H 2H 1H 2H 1H 2H 1H 2H 1H 2H 16 Registered Hosts 已注册主机16 种 Profile A 9 – Integrated Hosts 9 种集成式主机 Profile B 6 – Integrated Hosts 6 种集成式主机 1 – Visitor/Bench Host 1 种访问/台式主机
  • 25. ™ FOUNDATION forSafety Instrumented Functions 安全仪表功能(SIF)
  • 26. FOUNDATION for Safety Instrumented Functions (SIF) Update安全仪表功能(SIF) 的最新发展SIF ITK 1.2 SIFReleased December 2012 Communication DiagnosticsSupport for “Dual Mode” Device H1 通讯诊断Single Device that can functionin non-SIF process applicationsor in SIF applications.SIF ITK 1.22012年12月发布 SIF Function Blocks支持“双模”设备单台设备能在安全仪表功能或非安 功能块全仪表功能过程中应用
  • 27. DesignMATE™Segment Design Tool 网段设计工具
  • 28. DesignMATE™ Complete software tool for planning, validation, and documentation of H1 segments 用于H1网段规划、测试和归档 的软件工具 Automatically audits segment layouts against physical layer specifications 根据物理层规范自动审计网段图
  • 29. DesignMATE™ Key Features主要特点 Intuitive drag and drop interface for segment design and verification 用于网段设计和确认的拖/放界面非常直观 Analyzes and checks physical layer parameters分析和检查物理层参数 - Voltage压力 - Load conditions at power supply, coupler and device terminals 电源、耦合器和设备终端的负载 Complete instrument database from Registered Foundation Fieldbus Devices (updated periodically)注册设备的完整数据 (定期更新) Custom instrument libraries定制化仪表库 Generates documentation文档生成 Designed segments can be exported or printed 可导出或打印设计好的网段 Creates error log of deviations from the physical layer specification 生成不符合物理层规范的错误报告
  • 30. Available for Free Download免费下载www.fieldbus.org >> End User Resources >> Technical References
  • 31. Field Device Integration 现场设备集成
  • 32. Cooperation Projects 成立 FDI 合作公司 ’03 ’04 ’05 ’06 ’07 ’08 ’09 ’10 ’11 ’12 ‘13Phase 1 Phase 2 Maintenance FDI Project Enhanced Scope FDI CooperationProject Project Team Common Tools LLC 阶段 1 阶段 2 维护小组 FDI 项目 扩大范围 成立 FDI(现场设备集成) 能用工具 合作公司
  • 33. EDDL Phase 1 Features特性 Graphs Charts Images Enhanced Data Storage Enhanced User Interface 更好的数据存储 更友好的界面 IEC 61804-3 Electronic Device Description Language (EDDL) IEC 61804-3电子设备描述语言 (EDDL)
  • 34. 用户端应用 Client Applications EDDL Phase 2 Features特性 OPC UA 统一架构协议 OPC UA OPC UA Protocol Clients Web Services 网络服务器 OPC UA 用户 对综合设备的支持 Enhanced Procedural Support For Complex Devices Data Acquisition 数据获取 Access to Multiple Blocks Operator OFf-Line Configuration HMI Modular Devices 操作员人机界面 访问多个模块离线组态 模块化设备 EDDL Cooperation Project Remote I/O 远传I/O Blue line is a reference retrieved via FILE and ARRAY Trend/Historian Asset ManagementOPC UA OPC UAServers 服务器 综合设备 趋势/历史数据 Complex Devices 资产管理 EDD IEC 61804-3 Electronic Device Description Language (EDDL) IEC 61804-3 电子设备描述语言 (EDDL)
  • 35. FDI Device Package Standard FDI (现场设备集成)设备包标准  Product Manuals产品手册 Device Definition (Parameters)  Images图片 Business logic (Rules)  User Interface Plugin  Electronic Certifications User Interface (Structure)  Device Applications 电子证书 设备定义 (参数)  用户界面插件  Protocol specific Files 业务逻辑 (规则)  设备应用 用户界面 (结构) (CFf)协议规范文档  Integrity集成 EDD UIP Attachments  Authenticity授权 (mandatory) 必选 UIP (optional) 可选 (optional)可选 (optional) Electronic Device Microsoft .NET/ WPF Microsoft .NET/ Description for WPF Language Workstation 用于工作站平台 (EDDL) Platform 电子设备描述语言IEC 62769 – Devices and integration in enterprise systems; Field Device IntegrationIEC 62769 – 现场设备集成
  • 36. FDI Specification Development Timeline 规范开发时间表2007FDI Project Technical Team KickoFf FDI 项目技术小组成立 2QUse case review with NAMUR and WIB根据NAMUR 和WIB标准审核系统功能描述 4Q2008Use cases and requirements approved通过系统功能描述和要求 2QSystem Architecture系统结构 3Q2009Technology selection技术选择 1QFunctional Specifications功能规范 2Q2010Start Verification and Validation开始测试和验证 1Q2011FDI Cooperation LLC成立FDI 合作公司 2QFDI Specifications - IEC CD1 FDI 规范 - IEC CD1 4Q2012FDI Specifications - IEC CD2 FDI 规范 - IEC CD2 2QFDI Specifications - IEC CDV FDI 规范 - IEC CDV 4Q201390 Day Membership Review 90 天会员审核 1QFDI Final Specifications - Public Release FDI 最终规范 – 对外发布 2Q
  • 37. Thank you 2013 General Assembly End User Conference Shanghai, China © 1994 – 2013 Fieldbus Foundation