 ISU YANG TIMBUL APABILA BEKERJA DI TEMPAT ...

 ISU YANG TIMBUL APABILA BEKERJA DI TEMPAT
TINGGI
 2 Meter dan keatas – pekerja cenderung untuk jatuh
 AKTIVITI - AKTIVITI
Pembinaan, Penyelenggaraan, Pembaikpulihan,
Mengecat
Sektor Komunikasi, utiliti dsb
 PERALATAN
Perancah, platform, tangga
 TINDAKAN PENYELAMAT & PELONGGARAN
- Selusur (Railing), Jaring (Netting), Fall arrester, APD

Statistics

Views

Total Views
405
Views on SlideShare
405
Embed Views
0

Actions

Likes
0
Downloads
38
Comments
0

0 Embeds 0

No embeds

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Seminar Cakna KKP - WORKING AT HEIGHT What Goes Up, Come Down Safely Presentation Transcript

  • 1. WORKING AT HEIGHT-PERUNTUKAN PENTING DARIOSHA DAN FMAROSLAN BIN BIDIN
  • 2. PENGENALAN ISUYANGTIMBUL APABILA BEKERJA DI TEMPATTINGGI 2 Meter dan keatas – pekerja cenderung untuk jatuh AKTIVITI - AKTIVITIPembinaan, Penyelenggaraan, Pembaikpulihan,MengecatSektor Komunikasi, utiliti dsb PERALATANPerancah, platform, tangga TINDAKAN PENYELAMAT & PELONGGARAN- Selusur (Railing), Jaring (Netting), Fall arrester,APD
  • 3. OSHA 1994Falsafah dan Prinsip Panduan“Tanggungjawab untukmemastikan keselamatan dankesihatan di tempat kerjaterletak pada mereka yangmewujudkan risiko dan denganorang-orang yang bekerjadengan risiko ”
  • 4. OSHA 1994Falsafah dan Prinsip PanduanSIAPA YANG MEWUJUDKAN RISIKO?Sek 2 –Majikan – Majikan Utama dan Majikan SegeraMajikan Utama– agen, PengurusMajikan Segera – di dalam satu tempat kerja....Pekerja yang dilantik didalam perkhidmtankontrak dan diselia oleh majikan utama.....
  • 5. OSHA 1994Falsafah dan Prinsip PanduanTANGGUNGJAWAB AM MAJIKAN:Seksyen 15 :(1) It shall be the duty of every employerand every self-employed person toensure, so far as is practicable, thesafety, health and welfare at work ofall his employees.15(3) - ..the duties is extend toindependent or self employed andtheir workers…(a) the severity of the hazard ..(b) the state of knowledge about thehazard….(c) the availability and suitability ofways to remove….(d) the cost of removing….
  • 6. OSHA 1994Falsafah dan Prinsip PanduanSeksyen 2 OSHA:"employee" means a person who is employed for wages under a contract ofservice on or in connection with the work of an industry to which this Act appliesand-(a) who is directly employed by the principal employer ……..(b) who is employed by or through an immediate employer at the place of work ofthe industry or under the supervision of the principal employer or his agent onwork which is ordinarily part of the work of the industry or which is preliminary tothe work carried on in or incidental to the purpose of the industry; or(c) (c) whose services are temporarily lent or let on hire to the principal employerby the person with whom the person whose services are so lent or let on hirehas entered into a contract of service;
  • 7. OSHA 1994Falsafah dan Prinsip PanduanSeksyen 2 OSHA:"employee" means a person who is employed for wages under a contract ofservice on or in connection with the work of an industry to which this Act appliesand-(a) who is directly employed by the principal employer ……..(b) who is employed by or through an immediate employer at the place of work ofthe industry or under the supervision of the principal employer or his agent onwork which is ordinarily part of the work of the industry or which is preliminary tothe work carried on in or incidental to the purpose of the industry; or(c) (c) whose services are temporarily lent or let on hire to the principal employerby the person with whom the person whose services are so lent or let on hirehas entered into a contract of service;
  • 8. PELANGGAN• PEMILIK• PEMAJU• PENGHUNIKONSULTASIPENGURUSAN• AGEN• JURUTERA• ARKITEKKONTRAKTORUTAMA• PekerjaSub kontraktor • PekerjaSub kontraktor • PekerjaIndependentContractorPekerja
  • 9. SAMPLETYPE OF CONTRACT IN CONSTRUCTIONINDUSTRI INVOLVE SCAFFOLDKontraktor UtamaSubKontraktorMenyediakan komponenperancah, melantikScaffolder, memasangdan menggunaSub kontraktorMenyediakankomponen, melantikScaffolder danmemasang sahajaMenyediakankomponenperancahSub kontraktormemasang, melantikScaffolder danmenggunaMemasang, melantik Scaffolderdan mengguna
  • 10. OSHA-514 TANGGUNGJAWAB AMPEKERJAIncludes In Particular• Sect 15 (2)(a)• the provision andmaintenance of plantand systems of work PROSIDUROPERASI SELAMAT PENYELENGGARAAN PLAT
  • 11. OSHA- TANGGUNGJAWAB AMPEKERJAIncludes in particular…15(2)(b) the use or operation,handling, storage and transportof plant and substances;Mengenalpasti bahayayang berpotensi danmemperkenalkanlangkah kawalan
  • 12. SECTION 15 (2)(c)the provision of such information, instruction,training and supervision Penggunaan loji, jentera dan bahan Langkah kawalan, Penggunaan APD Induksi, toolbox meeting dsb
  • 13. OSHA – TANGGUNGJAWAB AMPEKERJA• Section 15 (2)(d)• Penyediaan dan penyelenggaraan laluan aksesdan keluar• Pemeriksaan dan penyenggaraan• Percahayaan laluan > 50 lux
  • 14. OSHA – TANGGUNGJAWAB AMPEKERJA• Section 15(2)(e)• Penyediaan dan penyenggaraanpersekitaran tempat kerja untukpekerjanya• Pengudaraan• Haba• Pencahayaan• Kelembapan• Bebas dari Asap toksid• Kemudahan Kebajikan
  • 15. APABILA KEMALANGAN BERLAKU
  • 16. SIASATAN KEMALANGANKURANG KOMITMEN DARI PIHAK PENGURUSANATASANTIADA LATIHAN KURANG PENGETAHUANPENTADBIRANKURANG PENYELIAAN PROSIDURYANG TIDAK MENCUKUPIPRIORTO INCIDENTTINDAKAN TIDAK SELAMAT KEADAAN TIDAK SELAMAT
  • 17. FAKTOR KEMALANGANSalah fahamundang-undang(Passing Out theJob , Pass theduty)Terma kontraktidak jelasKeperluan OSHterlalu umumPRINSIPTidak dinyatakandidalam kontrakBelanjawan TerhadKONTRAKTOR
  • 18. PENYELESAIAN• Principal Employers who is owner ofIndustry responsible to ensure all hisworkers including ContractorsWorkers.• HOWTO ENSURE.-As far as practicable• APAYANG BOLEH DILAKUKAN: -–MENGETAHUI RISIKO -HIRARC–MAKLUM/ BERKONGSI RISIKO–PEMANTAUAN / PEMERIKSAAN–LAPORAN DO IT ATTHE FIRST STAGE:INCORPORATING IN OSHCONTRARCT
  • 19. Factories And Machinery ActREGULATIONACTFMASHWFMSBOWECCONSTRUCTIONTRENCHINGCONSTRUCTION SAFETYPUBLIC SAFETYPREVENTIONOF FALLS
  • 20. SAFETY AND HEALTHWELFAREREGULATION – RELATE TO WAH• Working at Height• Use safety belt (if parcticable)Reg 12-Workingat height• Generally to be fenced -Railing and toe board• Stairway- railing at expose side• Opening to be coveredReg 8- FloorOpening• Specification of stairwayReg 9-Stairway• Inclined- handrail• Vertical-lSafety loops• Portable ladder-equiped with non skid devicesReg 10 – fixedladder
  • 21. BUILDING OPERATION AND WORKENGINERING CONSTRUCTION(BOWEC) REGULATION 1986• Factory means …… include;• any premises, place or space whereany Building Operation and Works ofEngineering Construction are carriedout.
  • 22. BOWEC• Operasi bangunan ―building Operations‖bermaksud pembinaan, pengubahan struktur,pembaikan atau penyelenggaraan bangunan(termasuk penghiasan semula,‗repointing‘ danpembersihan struktur luar), perobohan bangunan,dan penyediaan bagi meletakkan satu asasbangunan.
  • 23. • Pembinaan Kejuruteraan "work of engineeringconstruction" bermaksud pembinaan, penyambungan,pemasangan, pembaikan, penyelenggaraan,pembaharuan, penyingkiran, pengubahsuaian,pengubahan, perombakan, perobohan—(a) sebarang pemasangan, bangunan, struktur,tiang, menara, kaison, dinding, pagar ataucerobong, dimana dibina sepenuhnya atauseparuh atas atau bawah paras bumi;(b) apa-apa kerja-kerja jalan, dok, kerja-kerjapelabuhan, landasan keretapi, tepi laluan atautalian kabel, talian trem, pelayaran pedalaman,bidang udara atau padang terbang;
  • 24. PERUNTUKAN PENTING UNTUKPEMBINAAN -BOWEC• DESIGNED BY PROFESIONALENGINEERING• SCAFFOLD• Metal tube Scaffold > 40 meter• Frame and Modular Scaffold > 15• Loading and Catch Platform• Formwork• Runway an Ramp• Rubbish Chute > 15 meter
  • 25. PERUNTUKAN PENTING UNTUKPEMBINAAN -BOWEC• PERSONEL PROTECTIVE EQUIPMENT• Safety Helmet• Safety Hardness/Belt• Safety Shoes• Goggles• Ear Protection (Muff/Plug)• Respiratory Protection (Respirator,SCBA)• Hand Protection (Gloves)
  • 26. Apakan kesalahan yang dilakukan??
  • 27. PERALATANYANGSALAH
  • 28. LOADING PLATFORM• Pengiraan dan Lukisan Rekabentuk olehPE• SWL (Safe Working Load)• Pengadang (toe board)• Penyenggaraan• Kekemasan pelantar• Pelantar kerja yang sesuai• Laluan pelantar kerja yang selamat
  • 29. KESALAHANYANG DILAKUKAN
  • 30. LUBANG (FLOOR OPENING)• Pemasangan Pengadang• Tanda amaran• Pemeriksaan danPenyenggaraan
  • 31. TEPIAN LANTAI TERBUKA• KESESUAIANPEMASANGANPENGADANG ATAUPENUTUP• TANDA-TANDAAMARANYANG SESUAI• PEMERIKSAAN DANPENYENGGARAAN
  • 32. BekerjaTempat Tinggi• Kerja-Kerja > 10 kaki kena pakai Safety Harness• Penilaian terhadap kerja dan prosidur kerja (SOP)• Penyeliaan dan latihan• Peralatan Perlindungan diri- cth. topi keselamatan, abah-abah, tali pinggangkeselamatan, kasut keselamatan dll
  • 33. PEKERJAAN DI TEMPATTINGGIYANG TIDAK MENGGUNAKANPERALATAN KESELAMATAN DIRI (PPE)
  • 34. ACCES N ENGRESS TO WORKPLACE• Laluan keluar-masuk• Pembinaan > 2 Tingkat kena buat laluan denganperlindung atas (Overhead Protection)• Laluan ke lokasi kerja (tiada apa-apapepasangan yang menghalang laluan)• Pemeriksaan dan penyenggaraan• Percahayaan laluan > 50 lux
  • 35. TIADA LALUAN KHUSUS UNTUKKE TEMPAT KERJALALUAN KHUSUS UNTUK KETEMPAT KERJA + PELINDUNGKEPALA
  • 36. SELAMAT KE?
  • 37. ►TANDA-TANDA AMARAN DAN KAWALANLALULINTAS
  • 38. ►Kawalan Memasuki KawASAN Kerja YgBaik (Sistem & Pengawal, Pagar Dll)Pagar AdangTinggi > 1.8m dari permukaantanah
  • 39. ►Kawalan Memasuki Kaw. KerjaYg Baik (Sistem &Pengawal, Pagar Dll)Pengawal Keselamatan di PintuMasuk
  • 40. KESELAMATAN ELEKTRIK• Tanda amaran yang sesuai (dwi bahasa/simbol)• Minima 5.20 m tinggi dari permukaan tanah(Elevated power lines)• Cara pendawaian wayar elektrik• Orang bertanggungjawab dan mengadakanpemeriksaan berjadual (kelulusan JBE, SESB...etc)
  • 41. KEBERSIHAN DAN KEKEMASAN• Kekemasan dan kebersihan termasuk ruang laluankeluar dan masuk• Pembuangan sisa bahan-bahan binaan• Pemeriksaan dan penyenggaraan mengikut jadual yangdibuat.Tanda amaran jika menggunakan ‗chute‘
  • 42. KEBERSIHAN DI TAPAK BINAAN YANG TIDAKMEMUASKAN
  • 43. Sambungan…(Sakit Mata)
  • 44. • Pelongsor sampah (chute)– Ketinggian bangunan> 12 m– Perlu dapatkanpengesahan rekabentukdaripada Jurutera ygbertauliah.Pembuangan sisa bahan-bahan binaan√
  • 45. PENYIMPANAN BAHAN• Tempat penyimpanan yang sesuai/stor• Timbunan bahan disusun dalam keadaan stabil• Pemeriksaan dan senggaraan• Kekemasan dan kebersihan tempat simpanan• Tidak boleh disimpan atau diletakkan terlaludekat dengan tepi lantai/platform• Disimpan di atas lantai/pelantar tidak melebihiSWL (Safe Working Load)
  • 46. KESIHATAN DAN KEBAJIKAN• Peti pertolongan cemas (Per. 38(2)(1) SHW, 1970)- Minima 13 item (Jadual Ke-4)• Kemudahan tempat makan, minum, tandas & berehat• Kawalan bawaan vektor (nyamuk, tikus, lipas dll)• Tanda-tanda amaran yang sesuai• Pemeriksaan kesihatan pekerja
  • 47. FORMWORK• Pengiraan dan lukisan rekabentuk(H>9.14 m/Bertingkat & Beban >732.2kgf bagi 1 meterpersegi) perlu dapat kelulusan dari PE inc.Penanggalan• Pemasangan mengikut spesifikasirekabentuk• Pemeriksaan (Sebelum, Semasa & Selepas)• Orang yang bertanggungjawab• Penyediaan laluan yang selamat
  • 48. PERANCAHPerancah merupakan struktursementara yang disediakanuntuk :i) Pekerja berdiri diatasnyauntuk melakukan kerjaii) Laluan atau akses kepada pekerja ataumembawa bahan-bahan ke tempat kerjatermasuk platform kerja, laluan titian,landasan dan tanggaiii) Aktiviti ‘loading / unloading’bahan-bahan binaan danlain-lain logistik yangdiperlukan oleh pekerja
  • 49. HUBUNGKAIT KONTRAKTOR UTAMA DANSUB KONTRAKTOR SEMASA PEMASANGANPERANCAH DAN PELANTAR KERJA DI TAPAK BINAKontraktorUtamaSubKontraktorMenyediakan komponenperancah, melantikScaffolder, memasang danmenggunaSubkontraktorMenyediakankomponen, melantikScaffolder danmemasang sahajaMenyediakankomponenperancahSub kontraktormemasang,melantik Scaffolderdan menggunaMemasang, melantikScaffolder dan mengguna
  • 50. PENEMUAN KAJIAN- PEMATUHANPERANCAH DI SELANGOR ( 60 TAPAK)45%47%70%72%67%100%73%100%SCAFFOLD DRAWING NOTAVAILABLESCAFFOLD CONSTRUCTED NOTACCORDING TO DRAWINGINSPECTION NOT CARRIED OUTEVERY SEVEN DAYSNO SUITABLE SIGNAGE/TAGGINGCROSS BRACE DAMAGEDNO SUITABLE GUARD RAIL FORWORKING PLATFORMNO SAFE ACCESS LADDERARMLOCK NOT INSTALL BETWEENTWO FRAME
  • 51. PEMBINAAN PERANCAHDi bina tanpalukisanrekabentuk yangdisahkan oleh PE
  • 52. SCAFFOLD FOUNDATION- Keadaan tanah tidakrata dan tidak kukuh
  • 53. Menggunakan kayutidak sesuai
  • 54. KOMPONEN PERANCAHCross brace karat dan bengkok
  • 55. Arm lock tidak dipasangdiantara hujung frame
  • 56. PELANTAR KERJA-Dipasang menggunakan 1 plank-Tiada guard rail and toe board- Tidak mematuhi P 86 Bowec
  • 57. TIADA ‘SAFE ACCESS LADDER’ Laluan dari satu blokke blok lain
  • 58. FIKIR-FIKIRKANLAH…If you think SAFETYis expensive...Try Havingan Accident !!!