• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
#MP2013 Presentation of NDDC
 

#MP2013 Presentation of NDDC

on

  • 706 views

 

Statistics

Views

Total Views
706
Views on SlideShare
702
Embed Views
4

Actions

Likes
0
Downloads
11
Comments
0

1 Embed 4

https://twitter.com 4

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    #MP2013 Presentation of NDDC #MP2013 Presentation of NDDC Presentation Transcript

    • NDDC’s Efforts Toward Actualizing Mr. President’s Transformation Agenda By Dr. Christian Oboh Managing Director/CEO, Niger Delta Development Commission At the 2nd Edition of the Ministerial Platform ABUJA – NIGERIA, July 2013
    • Rebranded NDDC Head Office in Port Harcourt
    • NDDC Key Milestones – Education Sector STUDENTS UNDERGOING NDDC FOREIGN POSTGRADUATE SCHOLARSHIP EXAMINATIONS  Awarded 400 Scholarships for Masters and Ph.D. Degrees since Dec 2011  The objective is to build capacity/skills of high level manpower to meet international standards especially in the Oil & Gas sector.  The scholarship is valued at $30,000.00 per student annually NDDC FOREIGN POSTGRADUATE SCHOLARSHIP
    • NDDC Key Milestones – Education Sector NDDC PROTOTYPE UNIVERSITY HOSTELS AS AT DEC 2011
    • NDDC PROTOTYPE HOSTEL, DELTA STATE UNIVERSITY,ABRAKA (AWAITING COMMISSIONING) NDDC Key Milestones – Education Sector  NDDC is constructing 19 Hostels in 17 Universities in the Niger Delta Region  The objective is to complement the efforts of the Universities in providing decent accommodation for Students.  11 of the Hostels were put on fast-track in 2012  4 of the Hostels have been completed and one commissioned NDDC PROTOTYPE UNIVERSITY HOSTELS
    • NDDC Key Milestones – Education Sector NDDC PROTOTYPE HOSTEL, IMO STATE UNIVERSITY, OWERRI (RECENTLY COMMISSIONED) NDDC PROTOTYPE UNIVERSITY HOSTELS
    • NDDC PROTOTYPE HOSTEL, FEDERAL UNIVERSITY OF TECHNOLOGY, OWERRI (AWAITING COMMISSIONING) NDDC Key Milestones – Education Sector NDDC PROTOTYPE UNIVERSITY HOSTELS
    • NDDC Key Milestones – Health Sector NDDC FREE MEDICAL MISSION NDDC FREE MEDICAL SCHEME  The NDDC Regional Free Health Care Delivery Scheme covered a total of sixty (60) medical missions across the nine (9) states and over five hundred thousand patients were treated while over one million (1,000,000) household were educated on healthy living skills.  The Commission advanced work on the construction of three (3) Specialist Hospitals in Bayelsa, Akwa Ibom and Rivers.  Also NDDC is partnering the State Governments in building Maternal & Child Hospitals in the Niger Delta Region
    • NDDC Key Milestones – Health Sector TYPHOID VACCINES DONATED TO NDR STATES VACCINES & VACCINATION
    • NDDC Key Milestones – Health Sector PILOT SPECIALIST HOSPITAL FOR THE NIGER DELTA REGION (CARDIO VASCULAR/ORTHOPEDIC), IN PORT HARCOURT RIVERS STATE - ONGOING NDDC PILOT SPECIALIST HOSPITAL
    • NDDC Key Milestones – Agriculture  NDDC in partnership with the Bank of Agriculture set up a Credit & Entrepreneurial Development Scheme NDDC has deposited N975million for disbursement to 376 cooperative societies in the Niger Delta Region  NDDC and Cross River State Government is partnering to rehabilitate the State Poultry / Hatchery factory  Work is ongoing on the180tonnes/day Rice Processing Plant at Elele Alimini, Rivers State
    • NDDC Key Milestones – Agriculture  Supply of 304 sets of Swaraj Workhorse Model 978 (2WD/74HP) with sunshield canopy Tractors to the NDR States  11 Staff of NDDC were trained in India on the operation and maintenance of the tractors SOME OF THE SWARAJ TRACTORS SUPPLY OF 304 SWARAJ TRACTORS TO STATES
    • NDDC Key Milestones – Agriculture  Trained 2,397 Youths / Women in Agricultural Skills / Enterprises in Aquaculture; Poultry; Piggery; Rabbitry; Food processing; Snailry; Grasscutter Production; Feed Formulation and Cassava Production PARTICIPANTS UNDERGOING TRAINING AGRICULTURAL SKILLS TRAINING PROGRAMME
    • NDDC Key Milestones – Agriculture AGRIC LOAN BENEFICIARIES ELELE RICE MILL
    • NDDC Key Milestones – Skills Acquisition S/N TRAINING TYPE NUMBER TRAINEES CERTIFIED 1 Local Welding & Fabrication (Plate Welding) 165 2 NDDC Technical Aid Corp Scheme 1,907 3 NDDC International Welding Inspectors (trained in Turkey) 40 4 NDDC International Welding Instructors Training (Train-the- Trainer) in PTI Effurun and South Africa Institute of Welding 25 5 Maritime Training (in collaboration with Maritime Academy, Oron) 250 6 Entrepreneurial Development Scheme (in partnership with Empowerment Support Initiative) 200
    • NDDC Key Milestones – Skills Acquisition  NDDC in partnership with Shell Petroleum Development Company (SPDC) embarked on Skills Development Training for Rural Women and Young Girls in the Niger Delta Region.  The objective of the partnership is to provide skills that will women to make them employable.  A total of 1,620 women benefitted from the initiative.  NDDC contributed N536m while SPDC contributed N100m. SOME BENEFICIARIES NDDC / SPDC SKILLS DEV. TRAINING FOR WOMEN
    • NDDC Key Milestones – Skills Acquisition BENEFICIARIES WITH STARTER PACKS NDDC / SPDC SKILLS DEV. TRAINING FOR WOMEN
    • NDDC Key Milestones – Skills Acquisition NDDC STAFF, NIW PRESIDENT & NDDC- TRAINED INTERNATIONAL WELDING INSTRUCTORS NDDC SKILLS ACQUISITION PROGRAMME INSTALLED EQUIPMENT AT THE PERMANENT SITE OF NDDC/ESI FACTORY AT ENEKA, RIVERS STATE
    • NDDC Key Milestones – Security 100 PRADO JEEP VEHICLES FOR SECURITY PATROL FITTED WITH GADGETS TO SUPPORT THE POLICE IN THE 9 NIGER DELTA STATES NDDC SKILLS ACQUISITION PROGRAMME ACCOMMODATION FOR WO1 AT 2 BRIGADE NIGERIAN ARMY, BORI CAMP, PORT HARCOURT
    • NDDC Key Milestones – Environment  Oil Spill Investigation: Shell Bonga Oil Spill – Consistent with its mandate, the Commission engaged the services of an environmental consultant to carry out an independent investigation on the Shell Bonga Oil spill  Environmental Impact Assessment (EIA) Studies: The Commission carried out EIA studies of 59 major projects during the period under review. The Commission has however published the EIA Reports for nine of the projects.  Health, Safety & Environment / Environmental Monitoring of Projects (HSE / EMP). The Commission has awarded the consultancy for HSE/EMP of eight (8) major projects. The purpose of HSE/EMP is to implement a method of systematic identifying, assessing and controlling hazards that may arise from projects execution.
    • NDDC Key Milestones – Environment BURUTU RECLAMATION WORKS, DELTA STATE NDDC RECLAMATION PROJECTS OGU BOLO SANDFILLING, RIVERS STATE
    • NDDC Key Milestones – Completed Infrastructure Projects(Summary By State) S/N STATES COMPLETED PROJECTS MEGA PROJECTS TOTAL NO OF PROJECTS 1 ABIA 22 0 22 2 AKWA IBOM 34 2 36 3 BAYELSA 44 1 45 4 CROSS RIVER 48 0 48 5 DELTA 76 4 80 6 EDO 45 1 46 7 IMO 29 0 29 8 ONDO 51 0 51 9 RIVERS 142 1 143 TOTAL: 491 9 500 SUMMARY (BY STATE)
    • S/N PROJECT TYPE COMPLETED PROJECTS MEGA PROJECTS TOTAL NO. OF PROJECTS 1 Building (Schools & Hospitals) 38 0 38 2 Canalisation 0 2 2 3 Electrification 93 0 93 4 Flood control 0 0 0 5 Jetties 7 0 7 6 Roads and Bridges 282 7 289 7 Water supply 71 0 71 TOTAL: 491 9 500 NDDC Key Milestones – Completed Infrastructure Projects(Summary By Type) Between Jan 2012 and June 2013, 476kilometres of Road have been completed
    • NDDC Key Milestones – Ongoing MEGA Infrastructure Projects(Summary By State) S/N STATES TOTAL NO OF MEGA PROJECTS 1 ABIA 7 2 AKWA IBOM 36 3 BAYELSA 21 4 CROSS RIVER 11 5 DELTA 29 6 EDO 4 7 IMO 13 8 ONDO 11 9 REGIONAL 72 9 RIVERS 37 TOTAL: 241 SUMMARY (BY STATE)
    • S/N PROJECT TYPE TOTAL NO. OF MEGA PROJECTS 1 Building (Hostels & Hospitals) 22 2 Canalisation 5 3 Electrification 7 4 Flood control 48 5 Jetties 2 6 Roads and Bridges 154 7 Concrete Bridges 3 TOTAL: 241 NDDC Key Milestones – Ongoing MEGA Infrastructure Projects(Summary By Type)
    • NDDC Key Milestones – Roads & Bridges IBENO ROAD & BRIDGE, AKWA IBOM STATE
    • NDDC Key Milestones – Roads & Bridges ONICHA-UGBO – IDUMUJE – UGBOKO - EWOHIMI ROAD/BRIDGES, DELTA STATE TUNGBO – EDEBIRI ROAD/BRIDGES, BAYELSA STATE
    • NDDC Key Milestones – Roads & Bridges SANPOU – ODONI – AGBERE ROAD/BRIDGES, BAYELSA STATE OLOIBIRI INTERNAL ROAD/BRIDGES, BAYELSA STATE
    • NDDC Key Milestones – Roads & Bridges DUALIZATION OF IGWURUTA – ETCHE ROAD, RIVERS STATE OBOZOGBE – ABUDU ROAD/BRIDGES, EDO STATE
    • NDDC Key Milestones – Roads & Bridges OBOKOFIA INTERNAL ROAD, IMO STATE ORJI – ISIEBU – OKOHIA ROAD, IMO STATE
    • NDDC Key Milestones – Roads & Bridges (Ongoing Projects) GBAREGOLO –OGULAGHA ROAD/BRIDGES, DELTA STATE UGBO – OGHOYE ROAD/BRIDGES ONDO STATE
    • NDDC Key Milestones – Governance  Decentralization Policy  Review of Financial Manual  Strict Compliance with the Procurement Act of 2007  Establishment of a SERVICOM Unit in the Commission  Training of Staff by the Economic & Financial Crimes Commission  Implementation of Freedom of Information Act of 2011  Interaction with Independent Corrupt Practices Commission on Stalled Hostel Projects  Oversight by various Agencies and Committees of the National assembly
    • THANK YOU