Your SlideShare is downloading. ×
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

[GBC Finlandin jäsentilaisuus 2013] Ilari Aho, Uponor Oy: Upororin toimitilauudistus

225

Published on

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
225
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Uponor Group Headquarters Plaza Loiste, Vantaa, Finland Ilari Aho November 2013
  • 2. Plaza Loiste Key Facts • 7 240 m² office space • 6 office floors, of which 2 for Uponor • First BREEAM Very Good certified office complex in Finland • Energy Class A • UFHC, ceiling cooling, ground energy • Architect: Forma-Futura Oy • Developer: NCC Property Development • HVAC design: Optiplan Oy, Uponor 25 November 2013 ©Uponor 2
  • 3. VENTILATION MACHINERY ROOM • Mechanical supply/ exhaust with high efficiency heat recovery • Water chillers for peak cooling demand UPONOR FLOORS • Underfloor heating and cooling with free cooling from boreholes • Ceiling cooling for peak demand • Air circulation chillers for peak demand in meeting rooms ENTRANCE AREA Snow and ice melting • BOILER ROOM • Connections to district heating and boreholes FREE COOLING 11 boreholes with Uponor G12 providing free cooling to Uponor floors 25 November 2013 FLOORS 1 - 5 Underfloor heating ©Uponor 3
  • 4. 25 November 2013 ©Uponor 4
  • 5. Plaza Loiste Environmental Performance Free cooling for energy efficiency Energy production of the Plaza Loiste borehole cooling system Month • Free cooling energy from the boreholes covers the cooling demand of the Uponor offices • Purchased cooling energy need eliminated on an annual basis • Monitoring program established from the cooling season 2014 onwards Simulated energy production of the borehole field Cooling energy demand of the building kWh/month Anna Forsström: G-12 ENERGIANKERUUPUTKIEN KÄYTTÖ MAAVIILEÄN KERUUSSA Opinnäytetyö, Ympäristöteknologia, YAMK ,Toukokuu 2013 25 November 2013 ©Uponor 5
  • 6. Plaza Loiste occupant survey Thermal environment and sensation • High satisfaction level, with some remarks on too cold temperature levels especially in the meeting rooms • Regulation of the meeting room fan coil units has been adjusted after the summer period, and they should now work appropriately during the next cooling season 25 November 2013 ©Uponor 6
  • 7. Plaza Loiste occupant survey Air movement • Individual comments related to draught in meeting rooms caused by the fan coil units; this should be corrected by the adjustments that have already been made. 25 November 2013 ©Uponor 7
  • 8. Performance monitoring and verification • Plaza Loiste is a pilot project in the national RYM Indoor Environment research program • Monitoring and evaluation will be carried out regarding ― indoor environment quality ― building energy performance ― long term performance of the borehole field ― optimisation of the solution • Partners ― Aalto University ― VTT Technical Research Centre of Finland 25 November 2013 ©Uponor 8

×